HomeMy WebLinkAboutPR 18088: PIPELINE PERMIT 13-01 TO SUNOCO PIPELINE, L.P. 30" CITY OF PORT ARTHUR
ENGINEERING DEPARTMENT
COUNCIL ACTION MEMO
TO: Floyd T. Johnson, City Manager
FROM: John A. Comeaux, P.E., Assistant City Manager- Operations
DATE: December 3, 2013
SUBJECT: P.R. 18088 - Approval Pipeline Permit 13 -01 Sunoco Pipeline, L.P. 30" Crude
Pipeline
RECOMMENDATION
It is recommended that the City Council approve Proposed Resolution No. 18088 authorizing
the execution of Pipeline Permit 13 -01 from the City of Port Arthur to Sunoco Pipeline, L.P. of
Sugar Land, Texas for the installation of a 30" crude pipeline within the corporate limits of the
City of Port Arthur.
BACKGROUND
Sunoco Pipeline, L.P. of Sugar Land, Texas has made application for a major pipeline permit to
install a 30" crude pipeline within the corporate limits of the City of Port Arthur. This pipeline
will originate from a tie -in with an existing pipeline on property in Jefferson County, Texas
owned by Motiva Enterprises LLC in the BBB & CRR Co. A -79 Abstract and terminates at the
BASF /Total Refinery Complex in the M. Brown A -6 Abstract for a total distance of 5.85 miles
more or less.
The Public Hearing for the requested pipeline permit will be held on Tuesday December 10,
2013 at 6:00 p.m. in the City Council Chambers and will allow input from the public and other
interested parties. A meeting of the Citizen's Pipeline Advisory Committee was held on
December 2, 2013. The five (5) members in attendance (Harrison Hill, Deral Segler, Lovelace
Williams, Warren Field, and Harold Joseph) voted for the project. The Assistant City Manager -
Operations and Director of Planning have also reviewed this application.
BUDGETARY/FISCAL EFFECT
The permit fee of $1,500.00 will be deposited in Account 001- 0000 - 332.81 -00
EMPLOYEES /STAFF EFFECT
None.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 18088 authorizing the
execution of Pipeline Permit 13 -01 from the City of Port Arthur to Sunoco Pipeline, L.P. of
Sugar Land, Texas for the installation of a 30" crude pipeline within the corporate limits of the
City of Port Arthur.
John A. Comeaux, P.E.,
Assistant City Manager- Operations
"Remember, we are here to serve the citizens of Port Arthur"
P.R. No. 18088
12 -10 -2013
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE EXECUTION OF
PIPELINE PERMIT 13 -01 FROM THE CITY OF PORT
ARTHUR TO SUNOCO PIPELINE, L.P. OF SUGAR
LAND, TEXAS FOR THE INSTALLATION OF A 30"
CRUDE PIPELINE WITHIN THE CORPORATE LIMITS
OF THE CITY OF PORT ARTHUR
WHEREAS, Sunoco Pipeline, L.P. of Sugar Land, Texas has submitted an
application for a major pipeline permit to install a 30" crude pipeline within the
corporate limits of the City Of Port Arthur, Texas; and
WHEREAS, the pipeline would originate from a tie -in with an existing pipeline
on property in Jefferson County, Texas owned by Motive Enterprises LLC in the BBB &
CRR Co. A -79 Abstract and terminates at the BASF/Total Refinery Complex in the M.
Brown A -6 Abstract for a total distance of 5.85 miles more or Tess; and
WHEREAS, the members of the Citizens' Pipeline Advisory Committee met on
December 2, 2013, a copy of their recommendation of approval being attached hereto
and made a part hereof as Exhibit "A "; and
WHEREAS, the Public Hearing for the requested pipeline permit was held
December 10, 2013; and
WHEREAS, the Assistant City Manager - Operations and the Director of Planning
have reviewed such application and now recommend that a permit be granted pursuant
to Chapter 66 (Oil and Gas) of the Code of Ordinances of the City Of Port Arthur to
install and maintain said pipeline within the City in accordance with the routing set forth
in the Permit attached hereto and made a part hereof as Exhibit "B "; and
WHEREAS, Sunoco Pipeline, L.P. of Sugar Land, Texas has submitted the
required information and documents for their major pipeline permit to be considered for
approval; now therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR, TEXAS:
Page 2
P.R. No. 18088
THAT, the City Manager be and is hereby authorized to execute on behalf of the
City Pipeline Permit 13 -01 to Sunoco Pipeline, L.P. of Sugar Land, Texas for the
installation of a 30" crude pipeline originating from a tie -in with an existing pipeline on
property in Jefferson County, Texas owned by Motiva Enterprises LLC in the BBB & CRR
Co. A -79 Abstract and terminates at the BASF/Total Refinery Complex in the M. Brown
A -6 Abstract for a total distance of 5.85 miles more or Tess within the corporate limits of
the City of Port Arthur, Texas as set forth as Exhibit "B" and made a part hereof.
THAT, a copy of the caption of this Resolution be spread upon. the Minutes of
the City Council.
READ, ADOPTED AND APPROVED THIS day of
, 2013, at a Regular Meeting of the City Council of the
City of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
2
Valeci. Tiz_ o
G - ttorney
Page 3
P.R. No. 18088
APPROVED FOR ADMINISTRATION:
Floyd T. Johnson
City Manager
John A. Comeaux, P.E.
Assistant City Manager- Operations
Ronald Burto
Director of ' anning
EXHIBIT "A"
Citizens' Pipeline Advisory Committee Meeting Minutes
02 December 2013
The meeting was called to order at 5:35 p.m. in the fifth floor Conference Room of City
Hall. Committee members present were:
Harrison Hill, Deral Segler, Lovelace Williams, Warren Field, and Harold Joseph, Sr.
Also present were John A. Comeaux, P.E., Assistant City Manager- Operations, Rawetts
Baaheth, Assistant. City Engineer, and Rhonda L. Bell, Sr. Engineering Technician.
Committee members received copies of the proposed 13 -01 permit documents prior to the
meeting and were presented with the routing, street crossings and specifications of the proposed
pipeline during this meeting. After some explanations of the locations, boring methods, and .
safety issues, the Committee voted by a margin of 5 -0 to recommend to the City Council that
Sunoco Pipeline, L.P. of Sugar Land, Texas, be granted a permit for the installation of the 30"
crude pipeline which will originate from a tie -in with an existing pipeline on property in
Jefferson County, Texas owned by Motiva Enterprises LLC in the BBB & CRR Co. A -79
Abstract and terminates at the BASF /Total Refinery Complex in the M. Brown A -6 Abstract for
a total distance of 5.85 miles more or less.
The meeting was adjourned at 6:00 p.m.
Respectively submitted,
�lrw►tic��
a.ek
Rhonda L. Bell
Sr. Engineering Technician
EXHIBIT "B"
DELORIS `BOBBIE" PRINCE, MAYOR •FLOYD T. JOHNSON
ROBERT E. `BOB" WILLIAMSON, MAYOR PRO TEM CITY MANAGER
COUNCIL MEMBERS: ' : � SHERRI BELLARD
RAYMOND SCOTT, JR. C it} of f ` � ' \ CITY SECRETARY
ELIZABETH "LIZ" SEGLER
MORRIS ALBRIGHT HI 1 ` J VALECIA R. TIZENO
ROBERT TROY 1 J CITY ATTORNEY
WILLIE "BAE" LEWIS, JR.
DERRICK FREEMAN O l't r t h u r
KERRY"TWIN" THOMAS
Texas
03 December 2013
Mayor and City Council
City of Port Arthur
P.O. Box 1089
Port Arthur, Texas 77641 -1089
Dear City Council:
The Citizens' Pipeline Advisory Committee met on December 2, 2013 at 5:30 p.m. at City
Hall to consider the pending permit request by Sunoco Pipeline, L.P. of Sugar Land, Texas for
the installation of a 30" crude pipeline within the corporate limits of the City of Port Arthur.
This pipeline will originate from a tie -in with an existing pipeline on property in Jefferson
County, Texas owned by Motiva Enterprises LLC in the BBB & CRR Co. A -79 Abstract and
terminates at the BASF/Total Refinery Complex in the M. Brown A -6 Abstract for a total
distance of 5.85 miles more or less.
After a presentation of the information submitted by Sunoco Pipeline, L.P. and a thorough
discussion of the location, boring methods, and safety issues, the Committee voted by a margin
of 5 -0 to recommend to the City Council that Sunoco Pipeline, L.P. of Sugar Land, Texas, be
granted a permit for the installation of the 30" crude pipeline. A copy of the minutes of the
meeting is attached for your review.
This recommendation will be read into the record of the Public Hearing regarding the issuance
of the permit to Sunoco Pipeline, L.P. to be held at 6:00 p.m. on December 10, 2013 at the
City Council meeting.
Respectively submitted,
tt/
Rhonda L. Bell
Sr. Engineering Technician
•
Attachments: Copy of minutes
P.O BOX 1089 • PORT ARTHUR, TEXAS 77641 -1089 •409/983 -8115 • FAX 409/983 -8291
CITIZENS' PIPELINE ADVISORY COMMITTEE
Sunoco Pipeline L.P. -13 -01
30" Crude Pipeline Installation
December 2, 2013
Meeting Attendance
Please Sign In
Name Representing Phone #
PARRLgo A/ iv/Li,
7/� - &3l
C/1 r
1` k R / / / 1 0 77
r
9 4 � '/G r) t' < 'c 6 r�1r eg1 ) 8 t&
b - Z --/-- d/4/1,4 P( io: Z;YL / yz 2/2.d73
.� _-
� M4 = i IS ,411-167/4 !r V /..Z .
'I borndok L. 1e,(\ C, P A -)4:9 t0
-\ rk\ e.t; a( ,,c C.,P 905.sig9
CITIZENS' PIPELINE ADVISORY COMMITTEE
Sunoco Pipeline L.P. -13 -01
30" Crude Pipeline Installation
November 21, 2013
Meeting Attendance
Please Sign In
Name Representing Phone #
o 2 72 °3
Li:, ( iii t ( 3 _a)2.�
J /r? c . e Ce53 ,i
YOUE/ACCSI / C0 p ,(6
ct-L coe-c(sz-
Pdq 0 2 r)
6V9 „19,
( ,01,4 . L .IL. 903. Ui 0 .7D
; Sunoco Logistics Sunoco Pipeline L.P.
Right of Way Department
One Fluor Daniel Drive
Building A, Level3
Sugar Land, TX 77478
March 7, 2013
City of Port Arthur
444 4 Street
P.O. Box 1089
Port Arthur, TX 77651
ATTN: Ross Blacketter, Public Works Director
Re: Permit Application for Proposed 30" Crude Oil Pipeline within the city limits of Port Neches, Texas.
Dear Mr. Blacketter
Please let this letter serve as a formal request for a major pipeline permit to construct the above referenced
pipeline proposed by Sunoco Logistics within the City of Port Neches, pursuant to Part II, Chapter 98,
Division 3, Sections 98 -82 thru 98 -85, of the Port Neches, Texas of Ordinances.
The Pipeline will be owned and operated by:
Sinco Pipeline L.P. a Texas Limited Partnership
Sunoco contact:
Karl E. Williamson
Chief Right -of -Way Agent
Office: 281.637.6421
Mobile: 832.517.4263
Fax: 866 -434 -3303
Person preparing the application:
Vince Fasolino
Field Project Manager
Percheron Field Services
16000 Barkers Point Lane
Suite 250
Houston, TX 77079
Phone: 936- 346 -2382
Principal Contact:
Vince Fasolino
Field Project Manager
Percheron Field Services
16000 Barkers Point Lane
Suite 250
Houston, TX 77079
Phone: 936 -346 -2382
Origin and Destination of pipeline:
This pipeline will originate from a tie -in with an existing pipeline on property in Jefferson County
Texas owned by Motiva Enterprises LLC in the BBB &C RR Co. A -79 abstract and terminates at the
BSAF/ Total refinery complex in the M. Brown A -6 abstract. (total distance of + /- 5.85miles)
Product transported:
Crude
Maximum Operating Pressure:
740 psi
Normal Operating Pressure:
300 psi
Design Criteria:
Code of Federal Regulations — Title 49, Part 195 — Transportation of Liquids by Pipeline
Code of Federal Regulations — Title 29, Parts 1910 and 1926 — General Industry Safety
and Health Regulations (OSHA)
ASME B31.4 — Pipeline Transportation System for Liquid Hydrocarbons and Other Liquids
API Standard 1104 — Standard for Welding Pipelines and Related Facilities
API RP 1102 — Recommended Practice for Liquid Petroleum Pipelines Crossing Railroads
and Highways
NACE Recommended Practices, Latest Edition
Association of State Highway and Transportation Officials (AASHTO)
Respectfully,
Vince Fasolino
Field Project Manager
Percheron Field Services
In service to Sunoco Logistics
•
CITY OF PORT ARTHUR
JEFFERSON COUNTY, TEXAS
MAJOR PIPELINE PERMIT
TO: Sunoco Pipeline L.P. NO: 13 - 01
One Flour Drive, Bldg. A, Level 3 DATE: August 5, 2013
Sugar Land, Texas 77478
The City of Port Arthur, pursuant to Chapter 66, Article II, Sections 66 -51 through 66 -69,
Code of Ordinances hereby grants permission to the above -named permittee for the
construction of a proposed Thirty (30 ") pipeline(s) to be located in accordance with the
drawings and /or specifications attached hereto and made a part hereof. It is expressly
understood that the City of Port Arthur does not hereby grant or purport to grant any
right, claim title, interest, easement, or right -of -way on any property upon which such
pipeline(s) and related valves, structures, etc. may be located pursuant hereto, and that
the City may require the owner(s), at his own expense, to lower, adjust, relocate, or
remove such pipeline(s) on or from any public property upon thirty (30) days written
notice to the owner or agent thereof. Permittee shall be required to pay for and be
responsible for any adjustments or casings, etc. of its pipeline required because of
street improvement, utility or storm sewer crossings within the public rights -of -way
covered by this permit. This permit is issued subject to all necessary rights -of -way or
easements being acquired by permittee at its expense. Construction of the
pipeline(s) within any public street, easement, alley, right -of -way, or grounds shall be
performed in accordance with instructions of the City Engineer of the City of Port Arthur
and permittee shall notify said City Engineer by letter in his office, forty -eight (48) hours
prior to any work pertaining to the construction of the Thirty (30 ") pipeline therein. Upon
completion of such construction permittee shall notify the City Engineer of such
completion in order that the City Engineer may make a final inspection thereof.
MAJOR PIPELINE PERMIT -2-
Special conditions for constructing, replacing or relocating pipeline(s) within the City are as follows:
A. All pipelines within or across Public rights -of -way shall be constructed with pipe meeting DOT
CLASS 4 design requirement for wall thickness.
1. No pipeline will be located longitudinally under any existing or proposed pavement.
2. All existing improved streets shall be crossed by the bored method, and boring shall
extend the full width of the street right -of -way plus a minimum of one (1) foot
beyond said right -of -way. Provide markers in accordance with Section 66 -60.
3. Any pavement repairs or right -of -way restoration necessitated as a result of the
construction or operation of any pipeline shall be made in accordance with
instructions set out by the City Engineer. Repairs or restorations will be made in
such a manner as to equal or exceed the original condition and smoothness that
existed prior to construction or operation of pipeline.
4. All drainage improvements or conditions shall be restored to as good or better
condition than their original.
5. Any pipeline crossing under any improved street may be required to be cased for a
distance not less than one (1) foot beyond the right -of -way line of said street.
Casings shall have two (2) vents with the owner's name and product carried in line
shown on these vents. Casings shall be approximately the same diameter as the
bored hole.
6. All pipelines shall be protected by adequate and approved cathodic protection
measures.
7. Pipelines shall be covered to a minimum depth of four (4) feet below the ultimate
flow lines of any existing ditches which it crosses under.
8. The owners of any pipeline under construction shall provide flagmen, barricades,
flares, and signs for the protection of the public for the duration of the work as
instructed by the City Engineer.
9. Other conditions or restrictions deemed necessary to provide for full use of the public
right -of -way, and provide for the safety and convenience of the public shall be
applied in cases not herein covered.
10. Pipelines shall be not less than four (4) feet below ground surface, except as
otherwise specified above.
MAJOR PIPELINE PERMIT -3-
11. Said pipeline shall be designed, constructed, operated, and maintained in accordance
with the latest approved minimum standards established by the American National
Standards Institute, United States Department of Transportation and other pipeline
regulatory agencies. Where there are different standards among such agencies, the
most stringent standard shall apply for purposes of this permit.
12. Pursuant to Section 66 -61 and Section 66 -62 telephone notification to the City shall
be made as required by each section upon discovery of any leak or possibility of any
leak within the City of Port Arthur. This notification shall include the information set
out in each section, as well as other significant facts known by the carrier that are
relevant to the cause of the failure or extent of the damages.
13. Pursuant to Section 66 -62, permittee shall file within thirty (30) days of the discovery
of any leak a written report with the City Engineer. Such report shall provide at a
minimum the information required on the most current Texas Railroad Commission's
leak report form. Upon request, such companies shall provide the following: .
ALL LINES
1. Construction records and test reports.
2. Operating and maintenance procedures.
3. Emergency plan.
14. The provisions of this permit shall be subject to any Federal and State legislation,
rules, or regulations enacted or adopted, or which shall be here after enacted or
adopted, to the extent that such laws and regulations shall preempt or supersede the
authority of the City with respect to this Permit or provision hereof.
15. Hydrostatic test reports generated during construction are to be furnished to the
City.
16. Permittee agrees that if in the event it becomes necessary to lower, case or adjust
the line(s) permitted herein because of future street improvements, utility or storm
sewer crossings within the public rights -of -way covered by this Permit, said line(s)
shall be lowered, cased or adjusted at the sole expense of the Permittee or its
assigns.
17. Permitter- agreees -te-i .. .. ' • . - _ = - - . , : .. • . _ - - 6
-600-feet-befere -an 6 „u- 00- eet-ater
- �passiflg-any-cleveleped- fesidentiai,- resr€atiouat or- -.
MAJOR PIPELINE PERMIT -4-
HOLD HARMLESS PROVISION
This permit is subject to and incorporates fully Chapter 66, Section 66 -51 through 66 -69, Code of
Ordinances. By acceptance of this Permit, permittee agrees to pay for all damages to or loss of City of
Port Arthur's property which are caused by, result from, or arise out of permittee's construction,
operation, maintenance, repair or removal of such pipeline(s) within the City limits of the City of Port
Arthur. This permittee further agrees to indemnify and hold the City of Port Arthur harmless against and
from any and all suits, claims, and demands for damages to or loss of property of others or for personal
injuries to or death of persons whomsoever, including all necessary costs and expenses to the City of Port
Arthur relating to such claims, or demands, caused by, resulting from, arising, or growing out of or
connected with the granting of this permit or permittee's construction, operation, maintenance, repair or
removal of such pipeline(s) within the City,limits of the City of Port Arthur. This permit shall not become
effective until the permittee has subscribed its acceptance hereof and furnished the City with bond and
certification of liability insurance as required by the City pursuant to the aforesaid Chapter.
CITY OF PORT ARTHUR
BY:
TITLE:
DATE:
ATTEST: APPROVED FOR ADMINISTRATION:
City Secretary Director of Public Works
APPROVED AS TO FORM: •
Director of Planning
City Attorney
MAJOR PIPELINE PERMIT -5-
All conditions of this Permit and Understood and agreed to by Permittee.
ACCEPTED:
Permittee: Sunoco Pipeline L.P.
By: Sunoco Logistics Partners Operations GP LLC, its
General Partner
Karen R. McMillin
Title: Director, Right of Way (Attorney -in -Fact)
Date:
ACKNOWLEDGEMENT
STATE OF \ excIS §
COUNTY OFFA
On this t \ day of P UG &S 2013, before me, the undersigned officer, personally
appeared Karen R. McMillin, who ackno herself to be the Director, Right of Way (Attorney -in -Fact)
of Sunoco Logistics Partners Operations GP LLC, a Delaware limited liability company, general partner of
Sunoco Pipeline L.P. and further acknowledged that she, as such Director, Right of Way, being authorized
to do so, executed the foregoing instrument as the act and deed of such corporation for the purposes
therein contained by signing the name of such corporation. 1t ,,
GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of " 2013.
_ -"°..„ MARIA L TAYLOR fTeXO
Notary Public in and for the State of
114 f* "` MY COMMISSION EXPIRES
. ti ;r" August 22, 2016
j\\01 Q ' ! 1 10!
(Print Name of Notary Publi Here)
n
II
11
11
u
N8 ' 8 F io /
S$ Q Ey o f /
- _
zii�q g ° / /
/ 1
„a A / /
/0 °
8 &
$
fi 3 4 5 �,o` iii / \ % .
Q g N /� \\ cp 4J ( `� pp
a / N. 1 \ ry / - �`�'A f
I / \ \/ / J \
/ \, E .
/ / /
/ /
/ `l
// ` i 0 i
/ ■
is
// f ,< t' \ \
s i , / // r `vv 3.
8 / i 1 ' i �t r
§ iz / ` -
2 g /
11 4
/
;$la • A �/ 1
/ N. e 4
c i s \. / \ v _ —%,
?i > . / n
\ \ / '�! ai
u o \ /. > °
/ o . ,;�
Y - ■
s
\
w a
v° GI
O y 1
h i g .
m
=
A Q g C
s "g m
m .,
T
D P a $ Fvs