Loading...
HomeMy WebLinkAboutPR 18217: ERGONOMIC TRANSPORATION SOLUTION, INC. TRAFFIC SIGNAL 9TH AVE AND LAKE ARTHUR PUBLIC WORKS DEPARTMENT COUNCIL ACTION MEMO TO John A. Comeaux, P.E., Interim City Manager FROM Rawetts T. Baaheth, Sr., Assistant City Engineer SUBJECT P.R. #18217 — Contract Extension with Ergonomic Transportation Solutions, Inc. DATE 26 February 2014 RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 18217, authorizing a contract extension with Ergonomic Transportation Solutions, Inc. (ETSI) from March 10, 2014 to June 8, 2015, to perform the engineering design for a traffic signal at the intersection of 9 Avenue and Lake Arthur Drive for no additional cost. BACKGROUND: In Resolution 13 -531, the City of Port Arthur entered into a contract with Ergonomic Transportation Solutions, Inc. (ETSI) which the contract ends on March 9, 2014. A contract extension is necessary to continue the performance of engineering services. I recommend that the City Council approve Proposed Resolution No. 18217, authorizing a contract extension with Ergonomic Transportation Solutions, Inc. (ETSI) from March 10, 2014 to June 8, 2015, to perform the engineering design for a traffic signal at the intersection of 9 Avenue and Lake Arthur Drive for no additional cost. BUDGETARY /FISCAL EFFECT: Funding is available in account 001 -1202- 531.54 -00. EMPLOYEE /STAFF EFFECT: None SUMMARY I recommend that the City Council approve Proposed Resolution No. 18217, authorizing a contract extension with Ergonomic Transportation Solutions, Inc. (ETSI) from March 10, 2014 to June 8, 2015, to perform the engineering design for a traffic signal at the intersection of 9 Avenue and Lake Arthur Drive for no additional cost. Rawetts T. Baah - , Sr. Assistant City Engineer RTB \rtb S: \electrical_sec \ROE \Street Projects \Signals \Ergonomics Transportation Solutions \Contract Extension \CAM P.R. 18217 2/26/14 rtb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT EXTENSION FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ARTHUR AND ERGONOMIC TRANSPORTATION SOLUTIONS, INC. OF HOUSTON, TEXAS TO PROVIDE THE ENGINEERING DESIGN FOR A TRAFFIC SIGNAL AT 9TH AVENUE AND LAKE ARTHUR DRIVE; FOR NO ADDITIONAL COST. ACCOUNT 001 - 1202 - 531.54 -00. WHEREAS, per Resolution 13 -531 the City of Port Arthur entered into a contract with Ergonomic Transportation Solutions, Inc. (ETSI) to provide engineering design services for a traffic signal at 9 Avenue and Lake Arthur Drive due to the Police Department's request; and, WHEREAS, the contract term was from December 9, 2013 to March 9, 2014; and, WHEREAS, a contract extension from March 10, 2014 to June 8, 2015 is needed to continue the engineering design services for this project; and, WHEREAS, funding is available in account number 001 -1202- 531.54 -00; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to execute a contract extension with Ergonomic Transportation Solutions, Inc. for the engineering design of a traffic signal for the intersection of 9 and Lake Arthur Drive; for no additional cost, S: \electrical_sec \ROE \Street Projects \Signals \Ergonomics Transportation Solutions \Contract Extension \PR18217 P.R. 18217 Page 2 funding being available in account 001 - 1202 - 531.54 -00 in substantially the same form as Exhibit "A "; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2014 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Attest: APPROVED AS TO AVAILABILITY OF FU DS: Sherri Bellard 'Deborah Echols, CPA City Secretary Director of Finance APPROVED A TO FORM: / AIL .4. /Le' Sli awna Tubbs, CPPO Purchasing Manager er 9 Valecia Tize o City Attorney W APPROVED FOR ADMINISTRATION: John A. Comeaux, P.E. Interim City Manager EXHIBIT A CONTRACT EXTENSION FOR TRAFFIC SIGNAL DESIGN: 9 AVENUE AT LAKE ARTHUR DRIVE IN PORT ARTHUR, TEXAS THIS AGREEMENT, made this day of February , 2014, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY ", and Ergonomic Transportation Solutions, Inc. a(n) Corporation herein acting by and Individual, firm, partnership, or corporation through Harry C. Simeonidis, P.E., Principal hereinafter called "CONTRACTOR ". WITNESSETH: That for and in consideration of the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract extension shall be for a period of 90 days from the date of execution. 2. During the term of this Contract, the CONTRACTOR will furnish at his own expense all of the materials, supplies, tools, equipment, labor, and other services necessary to connection therewith, excepting those supplies specifically not required of CONTRACTOR in the Specifications. 3. The CONTRACTOR agrees to perform all the work described in the Specifications and Contract Documents and comply with the terms therein for the prices as stated in the attached proposal for the amount of $39,638.72. 4. The term "Contract Documents" means and includes the following: (A) Agreement (-C--) General-Inferniatieft (0) Specifieatiens (E) Bid Extension Memo F Bidder's I Sheet (G) Notice to Proceed 5. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 6. The CONTRACTOR will provide performance and payment bonds as required. S: \electrical_sec \ROE \Street Projects \Signals \Ergonomics Transportation Solutions \Contract Extension \Contract Page 1 7. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first written above. OWNER CONTRACTOR Ergonomic Transportation Solutions, Inc. BY: BY: John A. Comeaux, P.E. Harry C. Simeonidis, P.E. Interim City Manager Principal S: \electrical_sec \ROE \Street Projects \Signals \Ergonomics Transportation Solutions \Contract Extension \Contract Page 2