Loading...
HomeMy WebLinkAboutPR 18260: SOUTEX SURVEYORS REMOVAL AND REPLACEMENT OF 335 LINEAR FEET OF 66" RCP STORMWATER PUBLIC WORKS DEPARTMENT COUNCIL ACTION MEMO TO John A. Comeaux, P.E., Interim City Manager FROM Rawetts T. Baaheth, Sr., Assistant City Engineer SUBJECT P.R. #18260 — Contract Extension with Soutex Surveyors and Engineers DATE 08 April 2014 RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 18260, authorizing a contract extension with Soutex Surveyors and Engineers from February 15, 2014 to October 10, 2014, to perform the engineering services for the removal and replacement of approximately 335 linear feet of 66" diameter reinforced concrete pipe along Shreveport Avenue from Procter Street to 5 Avenue for no additional cost. BACKGROUND: In Resolution 13 -530, the City of Port Arthur entered into a contract with Soutex Surveyors and Engineers which the contract ends on February 14, 2014. A contract extension is necessary to continue the performance of engineering services. I recommend that the City Council approve Proposed Resolution No. 18260, authorizing a contract extension with Soutex Surveyors and Engineers from February 15, 2014 to October 10, 2014, to perform the engineering services for the removal and replacement of approximately 335 linear feet of 66" diameter reinforced concrete pipe along Shreveport Avenue from Procter Street to 5 Avenue for no additional cost. BUDGETARY /FISCAL EFFECT: Funding is available in account 001 -1202- 531.54 -00. EMPLOYEE /STAFF EFFECT: None SUMMARY I recommend that the City Council approve Proposed Resolution No. 18260, authorizing a contract extension with Soutex Surveyors and Engineers from February 15, 2014 to October 10, 2014, to perform the engineering services for the removal and replacement of approximately 335 linear feet of 66" diameter reinforced concrete pipe along Shreveport Avenue from Procter Street to 5 Avenue for no additional cost. !. 7 r._ ;i � R. etts T. Baahe , Sr. Assistant City Engineer RTB \rtb P.R. 18260 4/8/14 rtb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT EXTENSION FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ARTHUR AND SOUTEX SURVEYORS AND ENGINEERS OF PORT ARTHUR, TEXAS TO PROVIDE THE ENGINEERING SERVICES FOR REMOVAL AND REPLACEMENT OF APPROXIMATELY 335 LINEAR FEET OF 66" RCP STORMWATER ON SHREVEPORT AVENUE FROM PROCTER STREET TO 5 STREET FOR NO ADDITIONAL COST. ACCOUNT 001 -1202- 531.54 -00. WHEREAS, per Resolution 13 -530 the City of Port Arthur entered into a contract with Soutex Surveyors and Engineers to provide engineering services for the removal and replacement of 66" diameter reinforced concrete pipe (RCP) storm sewer; and, WHEREAS, the contract term was from December 16, 2013 to February 14, 2014; and, WHEREAS, a contract extension from February 15, 2014 to October 10, 2014 is needed to continue the engineering design services for this project; and, WHEREAS, funding is available in account number 001 - 1202 - 531.54 -00; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to execute a contract extension with Soutex Surveyors & Engineers for engineering services for the removal and replacement of approximately 335 linear feet of 66" diameter reinforced concrete pipe along Shreveport Avenue from Procter Street to 5 Street; for no additional cost, P.R. 18260 funding being available in account 001- 1202 - 531.54 -00 in substantially the same form as Exhibit "A "; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2014 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Mayor Attest: APPROVED AS TO AVAILABILITY OF FUNDS: Sherri Bellard Deborah Echols, CPA City Secretary Director of Finance APPROVED AS TO FORM: s--/A (( 7/he Shawna Tubbs, C O (� Purchasing Manager Valecia Tiz • City Attorney APPROVED FOR ADMINISTRATION: John A. Comeaux, P.E. Interim City Manager EXHIBIT A CONTRACT EXTENSION FOR THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 335 LINEAR FEET OF 66" DIAMETER RCP STORMWATER ON SHREVEPORT AVENUE FROM PROCTER STREET TO 5 STREET IN PORT ARTHUR, TEXAS THIS AGREEMENT, made this day of , 2014, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY ", and Soutex Surveyors and Engineers a(n) Corporation herein acting by and Individual, firm, partnership, or corporation through Anthony Leger, RPLS, Vice President hereinafter called "CONTRACTOR ". WITNESSETH: That for and in consideration of the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. Pursuant to Resolution 13 -530, the City entered into a 60 days contract which expired on February 14, 2014. The parties hereby agree to extend said contract until October 10, 2014. 2. The term "Contract Documents" means and includes the following: (A) Agreement Ad t for Bid �v,— i npo�T�.�e�ee�� (€)— Gcncral Information (D) peci€ cations (E) Proposal * (F) Bidder's Information Sheet * (G) Notice to Proceed *These items were attached to the original letting contract. The agreement only is included for this extension. 3. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 4. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first written above. Page 1 OWNER CONTRACTOR CITY OF PORT ARTHUR SOUTEX SURVEYORS AND ENGINEERS BY: BY:' John A. Comeaux, P.E. Anthony Leger, RPLS Interim City Manager Vice President Page 2 70 TBPE Firm No. 5755 TBPLS Firm No. 10123800 ��� 1► 3737 Doctors Drive 1G ., Port Arthur, TX 77642 4 SURVEYORS & ENGINEERS Office Fax (409) 983 2005 April 8, 2014 Mr. Rawetts Baaheth City of Port Arthur PO Box 1089 Port Arthur, Texas 77640 Dear Rawetts: Soutex Surveyors & Engineers requests that our contract involving the repair of a 66" RCP storm sewer on Shreveport Avenue be extended through October 10, 2014. Our original contract is noted as Resolution 13 -530. The reasons for the extension involves the following: 1) considering whether to clean and televise the line prior to doing the work; 2) consideration given to handle as force account work or go out for bids and have outside contractor do the work; 3) consideration was given whether to repair the 66" line or replace it; the decision was made that a repair be made rather than replace the line; 4) a set of plans are now ready to submit to the City to go out for bids on the repair of the line. As noted above, we request that the contract be extended through the completion of construction, which is expected to be October 10, 2014. We hope that this request will be granted and we can complete the contract. There will be no request for changes in our fees for this project. Respectfully submitted, Anthony • - ident