HomeMy WebLinkAboutPR 18303: CHANGE ORDER NO. 3 PLACO, LTD COATING EXISTING PIPE AND RE-ROUTING ELECTRICAL SERVICE, INCREASE MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: John A. Comeaux P.E., Interim City Manager FROM: John A. Tomplait, Assistant Director of Utility Operations DATE: April 15, 2014 RE: Proposed Resolution No. 18303 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18303 authorizing the execution of Change Order number three (3) for the Sabine Pass Metering Facility with Placo, Ltd., of Lumberton, Texas, this change order modifies the contract to include painting of the existing piping, and the re -route of the electrical wiring to the existing service at the Sabine Pass Standpipe. Coating of existing piping is $4,025.00 re- routing the electrical service is $1,223.83 for a total of $5,248.83. BACKGROUND The change order is for the construction of a metering station adjacent to the Sabine Pass Standpipe. This is required to accurately meter consumption from the Sabine Pass side to the Sabine Pass Liquefaction /Cheniere LNG facility. The project includes two large City -owned meters and the required backflow prevention devices. The project was approved in Resolution No. 13 -493 for the amount of $115,000.00 and a ninety (90) day contract term. This project is approximately 70% complete, with approximately 76% of the contract time used based on the contractors rate of production. BUDGET /FISCAL EFFECT This project will be funded through Account No. 429 - 1258 - 532.59 -00, Project No. WSI001 SUMMARY I recommend that the City Council approve Proposed Resolution No.18303. P. R. No. 18303 04/15/14 JT RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 3 BETWEEN THE CITY OF PORT ARTHUR AND PLACO, LTD; FOR THE SABINE PASS METERING FACILITY, FOR COATING OF EXISTING PIPE AND RE- ROUTING ELECTRICAL SERVICE INCREASING THE CONTRACT AMOUNT BY $5,248.83 TO A NEW CONTRACT AMOUNT OF $120,248.83; ACCOUNT NO. 429- 1258 - 532.59 -00, PROJECT NO. WSI001. WHEREAS, per Resolution No. 13 -493, the City entered into a contract for the installation of a Metering Facility to meter potable water from Sabine Pass to the Sabine Pass Liquefaction LNG facility in the amount of $115,000.00 with a contract term of ninety (90) days; and WHEREAS, per Resolution No. 14 -154 an additional 22 days was requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a contract term of 112 days; and WHEREAS, per Proposed Resolution No. 18293 an additional 11 days is requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a new completion date of May 08, 2014; and WHEREAS, an additional $5,248.83 is needed for coating of the existing pipe and re- route of the electrical wiring to the existing electrical service at the Sabine Pass Standpipe, bringing the new contract price for the project to $120,248.83 requested by Placo, Ltd., to work specified in their contract for the Sabine Pass Metering Facility; and WHEREAS, Arceneaux & Gates Consulting Engineers, has requested Change Order No. 3 increasing the amount by an additional $5,248.83 to a new total of $120,248.83 with Placo Ltd., said change order has been evaluated by Arceneaux & Gates Consulting Engineers, and the Utility Operations Department (attached hereto as Exhibit "A "); NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: P. R. No. 18303 04/15/14 JT Page 2 THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 3 between the City of Port Arthur and Placo, Ltd. for the increased amount of $5,248.83 attached hereto as Exhibit "A "; and, THAT, this project is funded in Project No. WSI001, 429 - 1258 - 532.59 -00; and, THAT a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following votes: AYES: Mayor ; Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Valec' : Ti,- no City Secretary • - • Attorne o e . .` 4-a 1 e�( P. R. No. 18303 04/15/14 JT Page 3 APPROVED FOR ADMINISTRATION: John A. Comeaux, P.E. Shawna Tubbs, CPPB Interim City Manager Purchasing Manager o A. Tompl.► t sistant Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: . �_? �` _ .1, Deborah Echols Director of Finance 429 - 1258 - 532.59 -00 Project No. WSI001 Exhibit "A" (Proposal for Contract Addition) ARCENEAUX GATES CONSULTING ENGINEERS, INC. CHANGE ORDER No. 3 DATE: April 8, 2014 JOB NO. CPA -890 AGREEMENT DATE: November 15, 2013 NAME OF PROJECT: SABINE PASS METERING FACILITY OWNER: CITY of PORT ARTHUR CONTRACTOR: Placo, Ltd. The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Add the following Items to the Contract and Scope of Work: a. Coating of Existing Piping ($4,025.00/L.S.) [ +] $ 4,025.00 b. Re -Route of Electrical Service ($1,223.83/L.F.) [ +] $ 1,223.83 TOTAL $ 5,248.83 CHANGE ORDER NO. 3 April 8, 2014 ARCENEAUX Job No. CPA -890 GATES CONSULTING ENGINEERS, INC. CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $115,000.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $ The CONTRACT PRICE due to this CHANGE ORDER will be [increased] [dccrcascd] by: $5.248.83 Dollars The new CONTRACT PRICE, including this CHANGE ORDER, will be $120,248. CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 90 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 123 Calendar Days CURRENT DATE OF COMPLETION: May 8, 2014 CONTRACT TIME due to this CHANGE ORDER will be increased by 0 Days The New DATE OF COMPLETION: No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY ENGINEER: ACCEPTED BY: 4f ARCENEAUX & GATES [CONTRACTOR, OFFICER OR OWNER] CONSULTING ENGINEERS, INC. PLACO TD. ACCEPTED BY: CITY of PORT ARTHUR 2 of 2