Loading...
HomeMy WebLinkAboutPR 18340: INSPECTION PUNCH LIST FOR THE SABINE PASS METERING FACILITY WITH PLACO, LTD MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: John A. Comeaux, P.E., Interim City Manager FROM: John Tomplait, Assistant Director of Utility Operations DATE: May 14, 2014 RE: Proposed Resolution No. 18340 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18340 authorizing the acceptance of the Engineer's Certificate of Substantial Completion. For the Sabine Pass Metering Facility with Placo, Ltd., of Lumberton, Texas. BACKGROUND This project was to construct a metering station adjacent to the Sabine Pass Standpipe. This is required to accurately meter consumption from the Sabine Pass side to the Sabine Pass Liquefaction/Cheniere LNG facility. The project included two large City- owned meters and the required backflow prevention devices. BUDGET/FISCAL EFFECT This project was funded by Sabine Pass Liquefaction Purchase Order No. 16435, charged through a City Account No. 429-1258-532.59-00, Project No. WSI001. SUMMARY I recommend that the City Council approve Proposed Resolution No.18340. P.R. No. 18340 05/14/14 jt Page 1 of 4 RESOLUTION NO. A RESOLUTION ACKNOWLEDGING THE ACCEPTANCE OF THE ENGINEER'S CERTIFICATE OF SUBSTANTIAL COMPLETION AND SUBSTANTIAL COMPLETION INSPECTION PUNCH LIST FOR THE SABINE PASS METERING FACILITY WITH PLACO, LTD OF LUMBERTON,TEXAS. WHEREAS, per Resolution No. 13-493, the City entered into a contract for the installation of a Metering Facility to meter potable water from Sabine Pass to the Sabine Pass Liquefaction LNG facility in the amount of$115,000.00 with a contract term of ninety(90)days; and, WHEREAS, per Resolution No. 14-154, an additional 22 days was requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a contract term of 112 days; and WHEREAS, per Resolution No. 14-203, an additional 11 days was requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a new completion date of May 08, 2014; and WHEREAS, per Resolution No. 14-209, an additional $5,248.83 was needed for coating of the existing pipe and re-route of the electrical wiring to the existing electrical service at the Sabine Pass Standpipe, bringing the new contract price for the project to $120,248.83 requested by Placo, Ltd.,to work specified in their contract for the Sabine Pass Metering Facility; and WHEREAS, the Engineer's Certificate of Substantial Completion date of May 6, 2014 applies to all work under the contract documents or to the following specified parts thereof, between the City of Port Arthur and Placo, LTD; and, WHEREAS, on May 6, 2014 the work which this certificate applies has been inspected by Arceneaux& Gates Consulting Engineers,the Utility Operations Department and Placo, LTD and is hereby declared to be substantially complete in accordance with the Contract Documents (attached as Exhibit"A"); and, P.R. No. 18340 05/14/14 jt Page 2 of 4 WHEREAS, the Substantial Completion Inspection Punch List for the Sabine Pass Metering Facility (attached as Exhibit `B") is to be corrected to comply with the Contract Documents; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council hereby acknowledges the acceptance of the Engineer's Certificate of Substantial Completion for the Sabine Pass Metering Facility with Placo, Ltd., in the total amount of$120,248.83, a contract term of 123 days, with a contract completion date of May 8, 2014; and, THAT, Arceneaux & Gates Consulting Engineers, and Placo, LTD will submit a the Certificate of Completion, Contractors Certificate of Release and final payment for the contract after the punch list has been completed for City Council approval; and THAT, the Acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the OWNER of all claims and all liability to the CONTRACTOR for all things done or furnished in connection with this work and for every act and neglect of the OWNER and others relating to or arising out of this work. No payment, however, final or otherwise, shall operate to release the CONTRACTOR or his Sureties from any obligations under this Contract or the Performance and Payment Bonds; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. P. R. No. 18340 05/14/14 jt Page 3 of 4 READ, ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: • AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: VAL j Sherri Bellard Valecia Tizen� City Secretary City Attorney P. R. No. 18340 05/14/14 jt Page 4 of 4 APPROVED FOR ADMINISTRATION: Az.-‘ A A-Li/LC,- Cillb John A. Comeaux P.E. Shawna Tubbs, CPPB Interim City Manager Purchasing Manager 04. / ohn A Tomplait ssistant Director of Utilities APPROVED AS TO AVAILABILITY OF FUNDS: Deborah Echols Director of Finance Account No.: 429-1258-532.59-00 Project No.: WSI001 Exhibit "A" (Engineer's Certificate of Substantial Completion) ENGINEER'S CERTIFICATE OF SUBSTANTIAL COMPLETION Project: SABINE PASS METERING FACILITY to Serve the CITY OF PORT ARTHUR Date of Issuance: May 6, 2014 Owner: CITY OF PORT ARTHUR Owner's Project No. CPA-890, Contract No. 1 Engineer: ARCENEAUX & GATES CONSULTING ENGINEERS, INC. Contractor: PLACO, LTD. This Engineer's Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO CITY OF PORT ARTHUR [OWNER] AND TO PLACO, LTD [CONTRACTOR] The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on May 6, 2014 DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all- inclusive, and the failure to include an item in it does not alter the responsibility of Contractor to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by Contractor within 30 days of the above Date of Issuance. From the date of Substantial Completion the responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: 1/2 RESPONSIBILITIES OWNER: Operation of the constructed facilities. CONTRACTOR: Security, Safety,Maintenance, Insurance, Warranties and Guarantees of the constructed facilities. Contractor shall complete a punch list which will be generated at an inspection of the facilities with the Owner and Engineer at a date to be determined. This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents, nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract Documents. Executed by ENGINEER on May 6, 2014 ARCENEAUX & GATES CONSULTING ENGINEERS, INC. [ENGINEER] By: CONTRACTOR accepts this Certificate of Substantial Completion on 5' 7 , 2014 PLACO,LTD. • [CONTRACTOR By: . Ai- ► /,.. �' 2/2 Exhibit "B" (Substantial Completion Inspection Punch List) ARCENEAUX GATES CONSULTING ENGINEERS,INC. SUBSTANTIAL COMPLETION INSPECTION PUNCH LIST DATE: May 6, 2014 PROJECT: Sabine Pass Metering Facility to Serve City of Port Arthur A&G Job No. CPA-890 ATTENDEES: Keestan Cole, PE - Arceneaux& Gates Consulting Engrs., Inc. (A&G) Stephanie Morrell - (A&G) Paul Boone - (A&G) Kirby Ducayet - Cheniere Jacob Boyd - Cheniere Rohan Ramoutar - Cheniere Charles Shajari - City of Port Arthur Bill Weikel - Placo Dan Sweat - Electrical Specialties The following items are to be corrected or completed to comply with the Contract Documents: GENERAL ITEMS 1. Clean off concrete slab, pickup and remove leftover construction materials onsite. 2. Remove existing piping and deliver to the City of Port Arthur 3. Install a steel sleeve in the concrete slab for the gate post on the north side of the slab. 4. Install missing anchor bolts in the base plates of the pipe supports and tighten all nuts on the anchor bolts in the base plates. 5. Cap or attach spare ground wires to structure. 6. Grout around wires coming out of conduit at the base of the steel structure. 7. Re-mount the City of Port Arthur"No Tresspassing" sign to the fence. END OF PUNCH LIST Page 1 of 1 P.R.No. 18251 / 03/24/14 445-6/ JT RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 BETWEEN THE CITY OF PORT ARTHUR AND PLACO, LTD; FOR THE SABINE PASS METERING FACILITY, INCREASING • THE CONTRACT TIME BY TWENTY-TWO (22) DAYS DUE TO INCLEMENT WEATHER CONDITIONS TO A NEW TERM OF 112 DAYS. WHEREAS, per Resolution No. 12-523, the City entered into a contract for the installation of a Metering Facility to meter potable water from Sabine Pass to the Sabine Pass Liquefaction LNG facility in the amount of$115,000.00 with a contract term of ninety(90)days; and WHEREAS, an additional 22 days is requested by Placo,Ltd.,to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a new completion date of April 26,2014;and WHEREAS,Arceneaux&Gates Consulting Engineers,has requested Change Order No. 1 increasing the contract time by an additional 22 days to a new contract term of 112 days with Placo Ltd. And the change order has been evaluated by Arceneaux & Gates Consulting Engineers, and the Utility Operations Department (attached hereto as Exhibit "A"); NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 1 between the CITY OF PORT ARTHUR and Placo, Ltd. for the increased contract time of twenty-two (22) days for a new contract term of 112 days attached hereto as Exhibit"A";and, THAT,this project is funded in Project No. WSI001,429-1258-532.59-00;and, P.R.No. 18291 04/15/14 JT RESOLUTION NO./V1.9D,3 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 BETWEEN THE CITY OF PORT ARTHUR AND PLACO, LTD; FOR THE SABINE PASS METERING FACILITY, INCREASING THE CONTRACT TIME BY ELEVEN(11)DAYS DUE TO INCLEMENT WEATHER CONDITIONS TO A NEW TERM OF 123 DAYS. WHEREAS, per Resolution No. 13-493, the City entered into a contract for the installation of a Metering Facility to meter potable water from Sabine Pass to the Sabine Pass Liquefaction LNG facility in the amount of$115,000.00 with a contract term of ninety(90)days; and WHEREAS, per Resolution No. 14-154 an additional 22 days were requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a contract term of 112 days;and WHEREAS, an additional 11 days are requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a new completion date of May 08,2014; and WHEREAS, Arceneaux & Gates Consulting Engineers, has requested Change Order No. 2 increasing the contract time by an additional 11 days to a new contract term of 123 days with Placo Ltd., said change order has been evaluated by Arceneaux & Gates Consulting Engineers, and the Utility Operations Department (attached hereto as Exhibit "A"); NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the City Manager of the City of Port Arthur is hereby authorized and directed to P.R.No. 18303 04/15/14 JT RESOLUTION NO. N`c/0/ A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 3 BETWEEN THE CITY OF PORT ARTHUR AND PLACO, LTD; FOR THE SABINE PASS METERING FACILITY, FOR COATING OF EXISTING PIPE AND RE-ROUTING ELECTRICAL SERVICE INCREASING THE CONTRACT AMOUNT BY $5,248.83 TO A NEW CONTRACT AMOUNT OF $120,248.83; ACCOUNT NO. 429-1258-532.59-00, PROJECT NO.WSI001. WHEREAS, per Resolution No. 13-493,I the City entered into a contract for the installation of a Metering Facility to meter potable water from Sabine Pass to the Sabine Pass Liquefaction LNG facility in the amount of$115,000.00 with a contract term of ninety(90)days; and WHEREAS, per Resolution No. 14-154 an additional 22 days was requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a contract term of 112 days; and , WHEREAS, per Proposed Resolution No. 18293 an additional 11 days is requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a new completion date of May 08,2014;and WHEREAS, an additional $5,248.83 is needed for coating of the existing pipe and re- route of the electrical wiring to the existing electrical service at the Sabine Pass Standpipe, bringing the new contract price for the project to $120,248.83 requested by Placo, Ltd., to work specified in their contract for the Sabine Pass Metering Facility;and WHEREAS, Arceneaux & Gates Consulting Engineers, has requested Change Order No. 3 increasing the amount by an additional$5,248.83 to a new total of$120,248.83 with Placo Ltd., said change order has been evaluated by Arceneaux& Gates Consulting Engineers, and the Utility Operations Department(attached hereto as Exhibit"A");NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: