HomeMy WebLinkAboutPR 18403: ALLCO, L.L.C. WATERLINE FORM 19TH ST. TO SABINE NECHES CANAL MEMORANDUM
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: John A. Comeaux P.E., City Manager
FROM: John A. Tomplait, Assistant Director of Utility Operation's
DATE: June 26, 2014
RE: Proposed Resolution No. 18403
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 18403 authorizing
the execution of Change Order No.2 for the 24" Waterline from 19th Street to the Sabine
Neches Canal Project with ALLCO, L.L.C., of Beaumont, Texas, in the total decreased
amount of $21,980.00. This change order is a credit to use 24" Certa-Loc restrained
joint C900 pvc pipe in lieu of the 24" cement lined restrained joint gasket ductile iron
pipe in the original bid. Also, included in this change order is a time extension of six (6)
days due to inclement weather.
BACKGROUND
This project will extend a 24" water transmission main from the old Water Purification
Plant to W. 7th Street and SH 82. This is a major portion of the project to supply water to
Sabine Pass Liquefaction/Cheniere LNG facility.
BUDGET/FISCAL EFFECT
This project will be funded by Sabine Pass Liquefaction, and charged through a City
Account No. 429-1258-532.59-00, and Project No. WSI003.
SUMMARY
I recommend that the City Council approve Proposed Resolution No.18403.
P.R. No. 18403
06/26/14 jt
Page 1
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE CHANGE ORDER NO. 2 BETWEEN THE
CITY OF PORT ARTHUR AND ALLCO, L.L.C.; FOR
THE WATERLINE FROM 19TH STREET TO THE
SABINE NECHES CANAL, FOR A CHANGE IN PIPING
MATERIAL DECREASING THE CONTRACT AMOUNT
BY $21,980.00 TO A NEW TOTAL OF $3,133,466.00, AND
A TIME EXTENSION OF SIX (6) DAYS, INCREASING
THE CONTRACT TIME TO 371 DAYS, ACCOUNT NO.
429-1258-532.59-00,PROJECT NO WSI003.
WHEREAS, per Resolution No. 13-503, the City entered into a contract for the
installation of a Waterline from 19th Street to the Sabine Neches Canal, to supply water for the
Sabine Pass Liquefaction LNG facility in the amount of$3,114,960.00 with a contract term of
365 calendar days; and
WHEREAS, per Resolution No. 14-210, an additional $40,486.00 was needed to add
storm water pollution prevention measures required by the City of Port Arthur that was not
included in the original contract, bringing the contract price for the project to $3,155,446.00
accepted by Allco; and
WHEREAS, a credit of$21,980.00 is due to for the use of 24" Certa-Loc restrained joint
C900 pvc pipe in lieu of the 24" cement lined restrained joint gasket ductile iron pipe in the
original bid, also a time extension of six (6) days is being requested due to inclement weather
bring the date of completion to January 25, 2015; and
WHEREAS, Arceneaux& Gates Consulting Engineers, has requested and recommended
Change Order No. 2 decreasing the amount by $21,980.00 to a new total of$3,133,466.00 with a
time extension of six (6) days for a new contract time of 371 days with Allco L.L.C., the change
order has been evaluated by Arceneaux & Gates Consulting Engineers, and the Utility
Operations Department(attached hereto as Exhibit"A"); NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
P. R.No. 18403
06/26/14 jt
Page 2
THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to
execute, on behalf of the City of Port Arthur, Change Order No. 2 between the City of Port
Arthur and Allco L.L.C., for the decreased amount of$21,980.00 attached hereto as Exhibit"A";
and,
THAT,this project is funded in Project No. WSI003, 429-1258-532.59-00; and,
THAT a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ, ADOPTED AND APPROVED THIS day of , 2014
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince
Mayor
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Valecia Tizeno
City Secretary City Attorney
P.R.No. 18403
06/26/14 jt
Page 3
APPROVED FOR ADMINISTRATION:
John A. Comeaux, PE Shawna Tubbs, CPP
City Manager (Interim) Purchasing Manager
Leslie McMahen ohn •1. Tomplai
Interim City Engineer e ant Director of Utilities
APPROVED AS TO AVAILABILITY OF
FUNDS:
D eborah Echols
Director of Finance
Account No.: 429-1258-532.59-00
Project No.: WSI003
Exhibit "A"
(Proposal for Contract Addition)
ARCENEAUX
GATES
CONSULTING
ENGINEERS,INC.
CHANGE ORDER No. 2
DATE: June 17, 2014 JOB NO. CPA-650
AGREEMENT DATE: November 5, 2013
NAME OF PROJECT: 24" Waterline from 19th Street to the Sabine-Neches Canal
OWNER: CITY of PORT ARTHUR
CONTRACTOR: ALLCO
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following Items to the Contract and Scope of Work:
a. Use 24" Certa-Lok restrained joint C900 pvc
pipe in lieu of 24" cement lined restrained joint
ductile iron pipe
($21,098.00/L.S.) [-] $ (21,098.00)
b. Extend contract time by 6 days
TOTAL $ (21,098.00)
CHANGE ORDER NO. 2
EID June 17, 2014
ARCENEAUX Job No. CPA-650, Contract No. 1
GATES
CONSULTING
ENGINEERS,INC.
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $3,114,960.00
CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3,155,446.00
The CONTRACT PRICE due to this CHANGE ORDER will be [increased]
[decreased]
by: $21,980.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be $3,133,466.00
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 365 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: Calendar Days
CURRENT DATE OF COMPLETION: January 19, 2015
CONTRACT TIME due to this CHANGE ORDER will be increased by 6 Days
The New DATE OF COMPLETION: January 25, 2015
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY ENGINEER: ACCEPTED BY:
ARCENEAUX & GATES [CONTRACTOR,OFFICER OR OWN I
CONSULTING ENGINEERS, INC. ALLCO
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2
ED
ARCENEAUX
GATES
CONSULTING
ENGINEERS,INC.
CHANGE ORDER No. 2
DATE: June 17, 2014 JOB NO. CPA-650
AGREEMENT DATE: November 5, 2013
NAME OF PROJECT: 24" Waterline from 19th Street to the Sabine-Neches Canal
OWNER: CITY of PORT ARTHUR
CONTRACTOR: ALLCO
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following Items to the Contract and Scope of Work:
a. Use 24" Certa-Lok restrained joint C900 pvc
pipe in lieu of 24" cement lined restrained joint
ductile iron pipe
($21,098.00/L.S.) [-] $ (21,098.00)
b. Extend contract time by 6 days
TOTAL $ (21,098.00)
CHANGE ORDER NO. 2
June 17, 2014
ARCENEAUX Job No. CPA-650, Contract No. 1
GATES
CONSULTING
ENGINEERS,INC.
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $3.114.960.00
CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3,155,446.00
The CONTRACT PRICE due to this CHANGE ORDER will be [increased]
[decreased]
by: $21,980.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be $3,133,466.00
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 365 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: Calendar Days
CURRENT DATE OF COMPLETION: January 19, 2015
CONTRACT TIME due to this CHANGE ORDER will be increased by 6 Days
The New DATE OF COMPLETION: January 25, 2015
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY ENGINEER: ACCEPTED BY:
ARCENEAUX & GATES [CONTRACTOR,OFFICER OR• NER]
CONSULTING ENGINEERS, INC. ALLCO
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2