Loading...
HomeMy WebLinkAboutPR 18370: PLACO LTD CONTRACT COMPLETION DOCUMENTS MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: John A. Comeaux, P.E., Interim City Manager FROM: John Tomplait, Assistant Director of Utility Operatiortr- DATE: July 09, 2014 RE: Proposed Resolution No. 18370 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18370 authorizing the acceptance of the Engineer's Certificate of Completion, Contractor's Certificate of Guarantee, and the Contractor's Certificate and Release for the Sabine Pass Metering Facility with Placo, Ltd., of Lumberton, Texas and, authorizing final payment in the amount of $6,012.44. The project is 100% complete with the scheduled completion date of May 8, 2014. BACKGROUND This project was to construct a metering station adjacent to the Sabine Pass Standpipe. This is required to accurately meter consumption from the Sabine Pass side to the Sabine Pass Liquefaction/Cheniere LNG facility. The project included two large City- owned meters and the required backflow prevention devices. BUDGET/FISCAL EFFECT This project was funded by Sabine Pass Liquefaction Purchase Order No. 16435, charged through a City Account No. 429-1258-532.59-00, Project No. WSI001. SUMMARY I recommend that the City Council approve Proposed Resolution No.18370. P. R. No. 18370 07/09/14 jt Page 1 of 4 RESOLUTION NO. A RESOLUTION ACCEPTING THE ENGINEER'S CERTIFICATE OF COMPLETION, CONTRACTOR'S CERTIFICATE OF GUARANTEE, THE CONTRACTOR'S CERTIFICATE AND RELEASE, AND THE FINAL PAYMENT IN THE AMOUNT OF $6,012.44 FOR THE SABINE PASS METERING FACILITY WITH PLACO, LTD OF LUMBERTON, TEXAS. ACCOUNT NO. 429-1258-532.59-00,PROJECT NO.WSI001. WHEREAS, per Resolution No. 13-493, the City entered into a contract for the installation of a Metering Facility to meter potable water from Sabine Pass to the Sabine Pass Liquefaction LNG facility in the amount of$115,000.00 with a contract term of ninety(90) days; and WHEREAS, per Resolution No. 14-154, an additional 22 days was requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a contract term of 112 days; and WHEREAS, per Resolution No. 14-203, an additional 11 days was requested by Placo, Ltd., to complete the additional work specified in their contract for the Sabine Pass Metering Facility with a new completion date of May 08, 2014; and WHEREAS, per Resolution No. 14-209, an additional $5,248.83 was needed for coating of the existing pipe and re-route of the electrical wiring to the existing electrical service at the Sabine Pass Standpipe, bringing the new contract price for the project to $120,248.83 requested by Placo, Ltd.,to work specified in their contract for the Sabine Pass Metering Facility; and WHEREAS, per Resolution No. 14-240 the Engineer's Certificate of Substantial Completion date of May 6, 2014 applies to all work under the contract documents or to the following specified parts thereof,between the City of Port Arthur and Placo, LTD; and WHEREAS, the work on this project is complete, a Final Inspection has been conducted, and Arceneaux & Gates Consulting Engineers, Inc. has issued an Engineer's P.R. No. 18370 07/09/14 jt Page 2 of 4 Certificate of Completion dated May 19, 2014 (attached as Exhibit "A"), and recommends acceptance and final payment by the City; and WHEREAS, the contractor has executed a Contractor's Certificate of Guarantee (attached as Exhibit `B") and a Contractor's Certificate and Release (attached as Exhibit "C"); now,therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council hereby acknowledges the acceptance of the Engineer's Certificate of Completion for the Sabine Pass Metering Facility with Placo, Ltd., in the total amount of$120,248.83, a contract term of 123 days, with a contract completion date of May 8, 2014; and THAT, the City Council of the City of Port Arthur hereby authorizes the City Manager to issue a Certificate of Acceptance for the project(attached as Exhibit"D") and authorizes final payment in the amount of$6,012.44 to Placo,Ltd., for the Sabine Pass Metering Facility; and THAT, the Acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the OWNER of all claims and all liability to the CONTRACTOR for all things done or furnished in connection with this work and for every act and neglect of the OWNER and others relating to or arising out of this work. No payment, however, final or otherwise, shall operate to release the CONTRACTOR or his Sureties from any obligations under this Contract or the Performance and Payment Bonds; and THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. P. R. No. 18370 07/09/14 jt Page 3 of 4 READ, ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers: NOES: Debris Prince Mayor ATTEST: APPROVED AS TO FORM: 4r-ii / Sherri Bellard Valecia Tizeno ) City Secretary City Attorney P. R.No. 18370 07/09/14 jt Page 4 of 4 APPROVED FOR ADMINISTRATION: ( i l� k : ((, John A. Comeaux P.E. Shawna Tubbs, CPPB Interim City Manager Purchasing Manager ) (John'A. Tomp ait LAss. t Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: De orah Echols Director of Finance Account No.: 429-1258-532.59-00 Project No.: WSI001 Exhibit "A" (Engineer's Certificate of Completion) ENGINEER'S CERTIFICATE OF COMPLETION Project: SABINE PASS METERING FACILITY Date Of Issuance: June 26, 2014 Owner(s): CITY OF PORT ARTHUR Owner's Project No.: CPA-890, Contract No. 1 Engineer: ARCENEAUX & GATES CONSULTING ENGINEERS, INC. Contractor: PLACO, LTD This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO CITY OF PORT ARTHUR [OWNER] AND TO PLACO, LTD [CONTRACTOR] The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on May 19,2014 DATE OF COMPLETION Vt.1t1 Executed by Engineer on °5 / , 2014 ";0....•r. .Ita =cot 4,,*: .r 't *�d (J...».......... t *r r....KEESTAN X. COLE J ....,d. \ 114225 • ac 4 . ,N BY: cEHQ.° tlitttt nNV4N7. ARCENEAUX & GATES CONSULTING ENGINEERS, INC. [SEAL] 1/l Exhibit "B" (Contractor's Certificate of Guarantee) CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: PLACO, LTD (Name of Contractor) TO: CITY OF PORT ARTHUR REFERENCE CONTRACT NO. CPA-890, Contract No.1 ENTERED INTO THE 15th DAY OF November, 2013 BETWEEN THE CITY OF PORT ARTHUR AND PLACO, LTD. OF LUMBERTON, TEXAS (City) (State) FOR THE SABINE PASS METERING FACILITY to SERVE the CITY OF PORT ARTHUR, CPA-890, CONTRACT NO. 1 LOCATED IN THE CITY OF PORT ARTHUR,TEXAS KNOW ALL MEN BY THESE PRESENTS: 1. PLACO, LTD does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials,due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract,as evidenced by the Engineer's Certificate of Completion. 3. This Certificate is given in connection of the final payment under the contract between the Owner and PLACO, LTD and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 2 n d day of July ,2014. (CORPORATE SEAL) PLACO, LTD (Contractor)John R . P ake , III Owner BY: (SIG ATURE AND TITLE OF OFFICER) 1/2 John R . Plake , III , being first duly sworn on oath,deposes and says,first that (Affiant) he is the Owner of PLACO, LTD (Title) (Name of Company) second,that he has read the foregoing certificate by him subscribed as Owner (Title) of PLACO, LTD (Name of Company) Affiant further states that the matters and things stated herein are true. -kr.114,4=11-- (Affiant) Johh R. Plake , III Owner Subscribed and sworn to before me this 2nd day of July ,2014. My commission expires: 04/03/2018 (Date) 1(� ••�v�.m.w���oa.9coz- ` 1/41 PUS, CARLENE VJ L Z , a Mary Public,State Of Tee/ (Notary Public) ,„ Wp My Convnission Eames l 04-03.2018 2/2 Exhibit "C" (Contractor's Certificate and Release) CONTRACTOR'S CERTIFICATE AND RELEASE FROM: PLACO, LTD (Name of Contractor) TO: CITY OF PORT ARTHUR (Owner) REFERENCE CONTRACT NO. CPA-890, CONTRACT NO. 1 ENTERED INTO THE 15th DAY OF NOVEMBER, 2013,BETWEEN THE CITY OF PORT ARTHUR AND PLACO, LTD (Name of Contractor) OF LUMBERTON, TEXAS (City) (State) FOR THE: SABINE PASS METERING FACILITY TO SERVE THE CITY OF PORT ARTHUR, CPA-890, CONTRACT NO. 1 KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approved Change Orders and modifications the balance of SIX THOUSAND TWELVE and 44/100 DOLLARS ($6,012.44) 2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1, there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: (a) (b) (c) (d) (Itemize claims and amounts due) (If none,so state) 3. The undersigned further certifies that all work required under this contract, including work required under Change Order(s) numbered 1,2 and 3 has been performed in accordance with the terms thereof, and that there are no unpaid claims for materials, supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof, the undersigned has received from the Owner all sums of money payable to the undersigned under, or pursuant to, the above mentioned contract or any modifications or change thereof. 1/2 5. That in consideration of the payment of the amount stated in Paragraph 1 hereof, the undersigned does hereby release the Owner and Operator from any and all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the Owner; provided, however, that if for any reason the Owner does not pay in full the amount stated in Paragraph 1 hereof, said deduction shall not affect the validity of this release, but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof, and of any amount which may be deducted from Paragraph 1 hereof, he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof, and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this 2nd day of July ,2014. (CORPORATE SEAL) PLACO, LTD (Contractor) BY: .1),„ (Signature aq4, f Officer) ohn R . Plake , III Owner John R . Plake , III , being first duly sworn on oath, deposes and says, first, that (Affiant) he is the Owner of PLACO, LTD (Title) (Name of Company) second,that he has read the foregoing certificate by him subscribed as Owner (Title) of PLACO, LTD (Name of Company) Affiant further states that the matters and things stated herein are true. (Affiant) Jo n R . Plake , III Subscribed and sworn to before me this 2nd day of July 2014. My commission expires 0 4/0 3/2 018 (Date) yco.asbti4,�v.�n.as.ir~wr..rw.~aar.tr.� (-CA�W/�' tip+ -I�Z/�-✓ 4,50 pv CARLENE VtEIKEL k (Notary Public) 1 41-rAt MaryPPwu.�b�I c,State Of Text �T` My Cornrn n Expires I 04.03-2018 2/2 Exhibit "D" (Certificate of Acceptance) CERTIFICATE OF ACCEPTANCE FOR THE SABINE PASS METERING FACILITY IN THE CITY OF PORT ARTHUR TO: Placo, Ltd. Date: Gentlemen: This is to certify that the City of Port Arthur, Texas, accepts the SABINE PASS METERING FACILITY on the basis of the Engineer's Certificate of Completion by Keeston Cole., P.E., of Arceneaux & Gates Consulting Engineers, the Contractor's Certificate of Guarantee, and the Contractor's Certificate and Release, executed by John R. Plake III, Owner, of Placo, Ltd. John A. Comeaux, P.E. Interim City Manager ATTEST: Sherri Bellard City Secretary