Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PR 14114:AAR INC
Memo To: Steve Fitzgibbons, City Manager From: Joseph Broussard, Purchasing Manager Date: April 19, 2007 Re: P. R. NO. 14114 - AWARDING A CONTRACT TO AAR, INC. FOR ASBESTOS ABATEMENT OF THE HEALTH DEPARTMENT 2~4~) FLOOR COMMENT RECOMMENDATION: The Purchasing Division recommends that the City Council adopt P.R. No. 14114 authorizing the City Manager to execute a contract with AAR, Inc. in the amount of $24,550.00 for asbestos abatement of the Health Department 2'~a floor. BACKGROUND: Thc Health Department has received Social Services Block grant funds to remodel the second floor of the facility. An asbestos survey of the second floor revealed that there is approximately 9,325 square feet of floor coveting and mastic, and 5,900 square feet of sheetrock that will have to be abated. Of the three contractors contacted, the following two quotes were submitted: A_A_R, Inc. (Houston, TX) $24,550.00 Basic Industries, Inc. (Nederland, T,'© $54,340.00 Inland Environmental (Port Arthur, TX') No Response The lowest contractor, AAR, Inc., will remove and dispose of the floor tiles and sheetrock according to Texas Department of Health regulations. BUDGET AND REVENUE IMPACT: Acceptance of this recommendation will not requixe a budget amendment. Funds are available in Account No. 132-1021-514.59-00, Project SSBG01. STAFF LEVEL IMPACT: Acceptance of this recommendation will have no effect on current staffing level. SUMMARY: The Purchasing Division recommends that the City Council adopt P.R. No. 14114 of authorizing the City Manager to execute a contract with ~ Inc. in the amount of $24,550.00 for asbestos abatement of the Health Department 2"d Floor. P. R. NO. 14114 04/17/07 YSG RESOLUTION NO. A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND AAR, INCORPORATED OF HOUSTON, TEXAS, IN THE AMOUNT OF $24,550 FOR ASBESTOS ABATEMENT OF THE SECOND FLOOR OF THE HEALTH DEPARTMENT (ACCOUNT NO. 132m1021-514.59-00 PROJECT NO. SSBG01). WHEREAS, the U.S. Department of Defense has awarded the City of Port Arthur's Health Department a Social Services Block Grant to support hurricane recovery; and WHEREAS, the grant authorizes the use of funds for renovation of the second floor of the Health Department; and WHEREAS, it has been determined that there is an immediate need for asbestos abatement on the second floor of the Health Department; and WHEREAS, ICU Environmental Health and Safety was hired as the consultant for the asbestos abatement project; and WHEREAS, ICU Environmental Health and Safety requested quotes from three contractors; and WHEREAS, AAR, Inc., of Houston, Texas proved to be the lowest and most responsible contractor to provide a quote; and WHEREAS, the Purchasing Division deems it is in the best interest of the City to approve and accept the quote from AAR, Inc., of Houston, Texas in the amount of $24,550 for asbestos abatement for the second floor of the Health Department. PR 14114 4/20/2007 NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. Section 2. That, the facts and opinions in the preamble are true and correct; That, it has been determined that there are substantial signs of asbestos on the second floor of the Health Department, which require immediate asbestos abatement in order to preserve and protect the public health. Section 3. That, the City Council of the City of Port Arthur hereby approves the contract between the City of Port Arthur and AAR, Inc. of Houston, Texas for the asbestos abatement of the second floor of the Health Department located at 449 Austin Avenue, Port Arthur, Texas, in the amount of $24,550. Section 4. That, the City Council deems it is in the best interest of the City to approve and authorize the City Manager to execute a contract between AAR, Inc., of Houston, Texas and the City in substantially the same form as delineated in Exhibit "A". That, a copy of the caption of this Resolution be spread upon the Minutes Section 5. of the City Council. READ, ADOPTED, AND APPROVED, this day of April, 2007, A.D., at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Council members: PR 14114 4/20/2007 NOES: Mayor ATTEST: Evangeline "Van" Green, City Secretary APPROVED AS TO FORM: Mark Sokol~w, City Attorney APPROVED FOR ADMINISTRATION: Steve Fitzgibbons, City Manager APPROVED AS TO FUND AVAILABILITY Rebecca Underhill, Director of Finance PR 14114 4/20/2007 "EXHIBIT A" PR 14114 4/20/2007 ASBESTOS ABATEMENT OF THE HEALTH DEPARTMENT SECOND FLOOR THIS AGREEMENT, made this day of April~ 2007 by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "Owner" or "City" and AAR~ , a (n) Incorporation herein acting by and through Randall Richardson~ hereinafter called "CONTRACTOR '. WITNESSETH: That for and in consideration of the payments, terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1) The Contractor agrees to perform all the work described in the attached specifications; and the contract documents and comply with the terms therein for the sum of $24,550. 2) The Contractor agrees to take approximately fourteen calendar days (14) to complete the abatement of the Health Department second floor, 449 Austin Avenue, Port Arthur, Texas. 3) The term "Contract Documents" means and includes the following: 1. Agreement 2. General Information/Scope of Work 3. Quote 4) This agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors and assigns. 5) IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in (2 copies) each of which shall be deemed an original on the date first written above. PR 14114 4/20/2007 Executed on the day of April ,2007 CITY OF PORT ARTHUR BY Steve Fitzgibbons, City Manager Signed on the __ day of April ,2007. CONTRACTOR BY AAR, Inc. Printed Name: Title PR 14114 4/20/2007 2300 Hwy 365, Suite 370 Nederland, Texas 77627 Phone (409) 727-8227 FAX (409) 729-5075 Project No. 07-04-N3864 April 4, 2007 City of Port Arthur 444 4th Street Port Arthur, Texas Attn. Darlene Thomas Pierre Project: BY: Port Arthur Health Department 449 Austin Avenue Port Arthur, Texas Asbestos Abatement Project Technical Specifications Daniel R. Ward DSHS CONSULTANT LICENSE NO. 10-5479 Expiration Date: 5/11/08 INTRODUCTION AND SCOPE This asbestos abatement project will include the proper removal, transportation and disposal of asbestos-containing 9"x9" tan and cream floor tile/mastic with speckled pattern, 12"x16" black floor tile/mastic with marble pattern, 3"x3" brownish maroon ceramic tile, 12"x12" brown floor tile/mastic with black and white flakes, brick patterned linoleum mastic, brown linoleum with semi-circled pattern, brown and orange linoleum with small pebble pattern, sheetrock/joint compound, and mastic around the base of air handler material at the Port Arthur Health Department located at 449 Austin Avenue in Port Arthur, Texas. The above named licensed consultant hereby authorizes the Project Managers, Ms. Charisse Crochet, Mr. Leroy Wolf, Mr. Doug Coole, Mr. Patrick Hall, Mr. Humberto Lopez, and/or Ms. Janet Ford (DSHS-Licensed Project Managers) to perform the necessary visual inspections as required by DSHS. Pod Arthur Health Department 449 Austin Avenue Port Arthur, Texas Asbestos Abatement Specifications DSHS License No. 10-5479 Consultant: AAR Incorporated April 10, 2007 City of Port Arthur 444 4th Street Port Arthur, Texas 77640 Attention: Joseph Broussard 6640 Signat Houston, Texas 77041 {713) 466 6800 Fax: (713) 466-4234 Reference: Asbestos Abatement-PortArthurHealthDepartmentBuildin~ DearJoseph, We are pleased to offer our quotation to furnish all necessary labor and materials to perform the following work for the stipulated sum: ASBESTOS ABATEMENT Removal, transporlation, & disposal, as Asbestos Containing/Contaminated Material, in the following approximate quantities, ~ the above referenced property: Floor Covering & Mastic ~9,325 SF Sheet Rock ~5,900 SF All for the sum of: ............ Twenty Four Thousand Five Hundred Fifty ............. .......................................................................... Dollars ($ 24,550.00 ) Our quotation is based on the following: 2. 3. 4. 5. 6. EPA, TDH and OSHA approved methods. $1,000,000 asbestos CSL general liability insurance policy. Power and water will be furnished by the owner, andavailable at the site ICU Plans and Specifications. Access for an onsite dumpster will be available adjacent to the worksite. Exclusions: A. P&P Bonds. B. Any concealedconditions. C. Project Specifications and Third Party Project Monitoring. D. Hazardous and/or regulated material testing and/or handling other than the above quoted asbestos. E. Site Security as required. If you have any questions or need additional informationplease do not hesitate to call. Sincerely, Randall R Richardson Randall Richardson President pa-healthdept.pro