HomeMy WebLinkAboutPR 14112: DIVERSIFIED COATINGS MEMORANDUM
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: Stephen Fitzgibbons, City Manager
FROM: Kelly Eldridge, Director of Utility Operations
DATE: April 5, 2007
SUBJECT: Proposed Resolution No. 14112
COMMENTS
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 14112 authorizing the
execution of a construction contract with Diversified Coatings, Ltd., of Chicago, IL, for $283,700.00
for Repair & Painting of the Pioneer Park Elevated Water Tank.
BACKGROUND
The Pioneer Park Elevated Storage Tank (EST) has been noted as a deficiency on the last several
annual TCEQ System Inspection Reports as being in need of repair and painting. This is our largest
elevated storage tank (1,000,000 gallons), so the completion of a few distribution system projects
needed to be accomplished before we could take this tank out of service for repair and painting.
This EST received minor damage from Hurricane Rita (approximately $9,100), and FEMA has
already paid their portion of these costs. These minor repairs are included in this rehabilitation
project. Don S. Reichle & Associates, Inc. performed engineering services related to the preliminary
and design phases necessary to complete this project. On March 7, 2007, we opened the following
bids:
Bidder Total Bid Days to Complete
S&L Painting, Inc. $291,475. 120
Houston, TX
Diamond Enterprise, Inc. $324,300. 120
Gloster, MS
$283,700. 150
Diversified Coatings, Ltd.
Chicago, IL
The Iow bid from Diversified Coatings, Ltd. meets the advertised specifications and is recommended
for award. This total includes $3,800 for the Memorial Titans logo.
BUDGET/FISCAL EFFECT
The engineer's estimate for this project was $275,000 to $300,000. This work is budgeted in
account No. 427-1626-532.85-00, Project No. 427602.
STAFF/EMPLOYEE EFFECT
Our consulting engineer and City staff will monitor this contract.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 14112 authorizing the
execution of a construction contract with Diversified Coatings, Ltd., of Chicago, IL, for $283,700.00
for Repair & Painting of the Pioneer Park Elevated Water Tank.
P.R. No. 14112
04-05-07
RESOLUTION NO.
A RESOLUTION AWARDING A CONTRACT AND AUTHORiZYNG THE
EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $283,700.00 FOR
THE REPAIR AND PAINTING OF THE PIONEER PARK ELEVATED WATER
TANK BETWEEN THE CITY OF PORT ARTHUR AND DIVERSIFIED
COATINGS, LTD., OF CHICAGO, ILLINOIS. ACCOUNT NO. 427-1626-
532.85-00, PROJECT NO. 427602.
WHEREAS, the elevated water storage t~ak at Pioneer Park is in need of repairs and
painting; and,
WHEREAS, the City Council of the City of Port Arthur deems it necessary to repair this
water storage tank in order to comply with regulator3, mandates; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT the City Council of the City of Port Arthur hereby awards the contract for the Repair
and Painting of the Pioneer Park Elevated Water Tank, to the lowest bidder to-wit; Diversified
Coatings, Ltd., of Chicago, Illinois; and,
THAT the Mayor and City Manager of the City of Port Arthur are hereby authorized to
execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and
Diversified Coatings, Ltd. in the amount of $283,700.00 to be completed within 150 days, a copy
attached hereto as Exhibit "A"; and,
THAT a copy of engineer's recommendation for awarding the contract to the lowest
responsible bidder is attached hereto as Exhibit "B"; and,
THAT the contractor shall not proceed on any phase or segment of this work until a Notice
to Proceed is issued; and,
THAT the said contract is an exact duplicate of a City Standard Form contract except for the
changes (if any) shown in the Certificate of Standard Form Contract, a copy of which is attached
hereto as Exhibit "C", and said changes are hereby approved; and,
P.R. No. 14112
04-05-07
Page 2 of 3
THAT a copy of the caption of this Resolution be spread upon the Minutes of the City
Council; and,
READ, ADOPTED AND APPROVED THIS day of ,2007
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor ;
Councilmembers:
NOES: "
ATTEST:
Evangeline Green, City Secretary
APPROVED FOR ADMINISTRATION:
Stephen Fitzgibbons, City Manager
Ke 1/1 y//E l~d id g~e,':~D'i r~edrc~t or of Utility Operations
Rebecca Underhill, Director of Finance
Account No.: 427-1626-532.85-00
Project No.: 427602
Oscar Ortiz
Mayor
APPROVED AS TO FORM:
Mark Sokolowd, City Attorney
E~AS TO AVAILABILITY OF FUNDS:
EXHIBIT A
Copy Available in City Secretary's Office
EXHIBIT B
FROM :DSR& Rssoc FRX HO. :409 ?'22E~S96 Rp~. ~ 2007
Beaumont, TX 77705
OFFICE (409) 722-2242
FAX (409) 722'8596
E~IL rreichleSta~kdo~,com
Mr. Kelly Eldridge, Director Of Utilities
City of Port Arthur
P. O. Box 1089
Port Arthur, TX 77641-1089
Re:
Pioneer Park Elevated Water Tank
Recommendation For Contract Award
Our 4318-II
Dear Mr. Eldridge,
Bid Proposals for the praje~ "Repair & Painting Of Pioneer Park Elevated Water Tank"
were received and opened on March 7, 2007 at 3:00 PM, Three proposals were received
and all bid data is shown on the attached Bid Tabulation.
The low bidder is Diversified Coat~gs, Ltd at their total bid of $279,900.00. Their
quoted calendar day completion time is one hundred fifty (150) cml.endar days.
We requested and received the attached Diversified Coatings reference hsts. DaR &
Associatos have worked with Diversified on several similar past water tank projects,
They have the qualifications and experience to handle this City of Port Arthur project.
We recommend that the City award the contract to Diversified Coatings, Ltd. at their
total bid of $279,900.00 and one hundred fifty (150) calemtar day completion time.
At your direction, we will provide the Notice of Award, assemble the required contract
documents and forward to the contractor for thmr action and execut/on.
Please contact our office if you have any questions.
ice-President
Project Manager
cc: Mr. Charles Shajari, City of Port Arthur
FROM :DSR & Assoc FAX I~lO. ~40=] ?~21S15~6 Apr.. 05 ~007 02. ~PM P~
I
I
EXHIBIT C
(City of Port Arthur)
(Law Department)
(Required Form)
(7~8~88)
(10/5/89)
(3/15/90)
(9-8-94)
(p.2 Revised 9/18/90)
CERTIFICATE OF STANDARD FORM CONTRACT FOR LAW
DEPARTMENT REVIEW AND CITY COUNCIL AGENDA
I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City
Council Resolution No 14112 is an exact duplicate of an applicable standard form contract (the title of
which is shown below) previously approved by the Law department and adopted as a standard form by City
Council Resolution, except for the blanks that have been filled in with all necessary information and except
for the changes described below.
The title of the applicable standard form contract is:
[ ] Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94
[X] Non-Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94
[ ] Federal - Professional Services - Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8);
10/89; 2/91 (§8)
[ ] Non-Federal - Professional Services - Engineering Contract, Revised 1/5/88, 5/89(§10),
7/89(§8), 10/89; 2/91 (§8)
[ ] CDBG - Professional Services - Engineering Contract, Revised 1/5/88, 5/89 (§10), 7/89(§8),
10/89; 2/91 (§8)
[ ] Federal - Professional Services -
Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8)
[ ] Non-Federal - Professional Services -
Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8)
[ ] CDBG ~ Professional services -
Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8)
[ ] Other Standard Form Contract, described as follows:
The changes are as follows: (Put an "X" in the appropriate [ ])
[ ] None.
[ ] The following described provisions at the indicated page, section, etc. of the standard form
have been deleted from said contract:
Page 1 of 3
(p.2 Revised 9 ! 18/90)
(Certificate of Standard Form Contract, page 2)
DELETIONS
Pase Number
Where
Deleted Provision
Is
Found On Standard Form
None.
Section or Paragraph No.
and Caption
Which
Contains Provision
Deleted From Form
Subsection or
Subparagrabh No.
and Caption
Which Contains Provision
Deleted From Form
Description of
Provision Deleted
[ ] The fol[owin8 described provisions at the indicated page, section, etc. of the standard form
have been altered, modified, replaced or otherv~se changed:
ALTERATIONS, MODIFICATIONS, REPLACEMENTS, ETC.
Sub § or Sub ¶ No.
Page No. § or ¶ No. [t E Caption Description
Where Caption of of of
Provision Found Standard Form Standard Form Provision
On which which in
Standard Form Contains Provision Contains Provision Standard Form
Page § [t caption
sub § 8: caption, etc.
of said contract
which contains
altered, etc. provision;
Description of
Alteration etc.
Page 2 of 3
p.3 Revised 9/18/90)
(Certificate of Standard Form Contract, page 3)
[ ] The following provisions have been added to Said Contract:
Page, Section and Caption
Subsection and Caption, etc. of Said Contract Which
Contains the Added Provision and Description Thereof
I further certify that said attached proposed City Council Resolution contains the fo[lowing
provision:
"That said contract is an exact dup[icate of a City Standard Form Contract except for the changes
described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit
"C" and is hereby incorporated by reference, and said changes are hereby approved."
I understand that this certificate will be relied on by the Law Department in reviewing and
approving (or rejecting) as to form and by the City Council in reviewing and adopting (or rejecting) said
Resolution and Contract.
Signedthis ~.~.t~ dayof .~/,~,? _,2007.
Departmen~t Head
Page 3 of 3