Loading...
HomeMy WebLinkAboutPR 18509: L & L TIME EXTENSION MEMORANDU.M CITY OF PORT ARTHUR Public Works Department — Eng'iri ering TO: John A. Comeaux,P.E.,Interim City Manager FROM: Leslie E.McMahen,P.E.,Engineering/Public Works Consultant DATE: August 27,2014 RE: Proposed Resolution No. 18509 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18509, which would authorize a requested time extension to the contract between the City and L&L General Contractors for the Tunnel Demolition, Backfill and Sidewalk Replacement project at 501 Procter Street in conjunction with the EDC building project at that location,with the requested extension being until November 15,2014. BACKGROUND The City contracted with L&L General Contractors for the aforementioned project on April 29, 2014, with a Notice to Proceed date of June 9, 2014. The project was for a construction time of sixty (60) calendar days with an expiration date of August 8, 2014. Due to complications and other activities from Spaw-Glass, the general contractor renovating 501 Procter, as well as other weather and concrete delivery issues, L&L's work was delayed; however L&L's work was completed as of July 23, 2014. By the time the final inspection was held,the contract time had expired. The final inspection revealed that about two- thirds of the sidewalk was not acceptable to our engineer or the contractor, and the contractor asked for a contract time extension to have the opportunity to remove and replace the sub-par sections of concrete sidewalk. L&L has officially requested this time extension by letter and our engineer, Arceneaux Wilson & Cole LLC,has recommended the time extension by letter. The recommended time extension would be until November 15, 2014 to allow time for L&L to do the necessary work, and to allow time for a final inspection and project close-out. BUDGET/FISCAL EFFECT There is no change in the contract amount as a result of the time extension of the ending date of this contract since the contractor will be responsible for all costs associated with the replacement of the sub- par concrete sidewalk sections. SUMMARY I recommend that the City Council approve Proposed Resolution No.18509 which would authorize a requested time extension to the contract between the City and L&L General Contractors for the Tunnel Demolition, Backfill and Sidewalk Replacement project at 501 Procter Street, with the requested extension being until November 15, 2014. There will be no additional cost to the City as a result of this time extension. P. R. No. 18509 08/27/14 tern Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING A REQUESTED TIME EXTENSION TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND L&L GENERAL CONTRACTORS OF BEAUMONT, TEXAS, FOR TUNNEL DEMOLITION, BACKFILL, AND SIDEWALK REPLACEMENT ADJACENT TO 501 PROCTER STREET, SAID TIME EXTENSION BEING UNTIL NOVEMBER 15,2014. WHEREAS, per Resolution No. 14-206 dated April 29, 2014, the City entered into a contract with L&L General Contractors ("L&L") of Beaumont, Texas, for the Tunnel Demolition, Backfill and Sidewalk Replacement adjacent to 501 Procter Street in the amount of $45,000.00 and a contract time of sixty (60) calendar days, with an expiration date of August 8, 2014 based on the Notice to Proceed date of June 9, 2014; and, WHEREAS, due to complications and other activities by Spaw-Glass, the EDC Building general contractor, and other weather and concrete delivery issues, L&L's work on the tunnel demolition was delayed, but L&L did complete the work on July 23, 2014; and, WHEREAS, by the time the final inspection was held, the original contract time had expired but the appearance of two-thirds of the sidewalk was not acceptable to our engineer or L&L, and L&L expressed a desire to remove and replace the sub-par sections of the concrete sidewalk; and, WHEREAS, L&L has by letter, attached as part of Exhibit "A", requested that the contract time be extended and our engineer, Arceneaux Wilson & Cole LLC, has by letter, attached as part of Exhibit "A", recommended that the contract be extended to November 15, 2014, to allow time for L&L to do the necessary work and to allow time for a final inspection and project close-out. P. R. No. 18509 08/27/14 lem Page 2 of 3 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council hereby authorizes a requested time extension to the contract between the City and L&L General Contractors for Tunnel Demolition, Backfill, and Sidewalk Replacement, as recommended by Arceneaux Wilson & Cole LLC, to a new ending date of November 15, 2014, to allow L&L to replace sub-par sections of the concrete sidewalk at their expense, and to allow a final inspection and project close-out; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ,ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor P. R. No. 18509 08/27/14 lem Page 3 of 3 ATTEST: APPROVED AS TO FORM: Sherri Bellard alecia Tizen. City Secretary City Attorney APPROVED FOR ADMINISTRATION: John A. Comeaux P.E. Shawna Tubbs, CPPO, CPPB Interim City Manager Purchasing Manager f\A Leslie E. McMahen, P.E. Sue McDermott, P.E. Engineering/Public Works Consultant Director of Public Works/City Engineer EXHIBIT "A" P.R. No. 18509 Two (2) Pages l� & , GENERAL CONTRliTi9e80;x13657715( 11j1j 301 Ssim x 781 Lit yld t TX78801 A 830-591-5903 409.736-1344-Fax 408-796-1341 McClain McDonald L&L General Contractors 11988 FM 365 West Beaumont,Texas 77705 August 25,2014 Mr.Joe Wilson President Arceneaux Wilson&Cole LLC - 2901 Turtle Creek Dr.,Suite 320 Port Arthur,TX 77642 Dear Mr.Joe Wilson,President Arceneaux Wilson&Cole LLC, The sidewalk was poured and completed on 7-14-2014,contract expired August 8,2014. Due to weather related material delays,concrete has been difficult to acquire. This materials delay combination with an unfamiliar,yet available,concrete crew. Is the main cause of this request. Due to the uncertainty of concrete, in combination with weather caused us to use a concrete company we weren't familiar with. There is a section of the concrete side walk we are not happy with. As a contractor who has a quality relationship with the City of Port Arthur. We did not like the appearance or condition of 2/3 of the sidewalk and would like the opportunity to remove and replace the bad sections of concrete. I would like to request an extension until November 15t11 for final completion and close-out of this contract. Sincerely, McClain McDonald L&L General Contractors ARCENEAUX WILSON & COLE LLC Arcencaua Wilson 6 Cole----r-t-F= AWCEngineering • Surveying • Planning August 26, 2014 -- Leslie McMahen, PE City of Port Arthur 444 Fourth Street Port Arthur, Texas 77640 RE: RECOMMENDATION FOR CONTRACT EXTENSION - Tunnel Demolition and Backfill;EDC-200 Dear Mr. McMahen, GADV Inc. dba L&L General Contractors was awarded the contract for the Tunnel Demolition and Backfill project on April 29, 2014 with a notice to proceed date of June 9, 2014 and sixty (60) days to completion. This project is located at 501 Procter St. where Spaw-Glass general contractors is renovating the existing building to become the new Port Arthur Economic Development Corporation offices. Due to complications and other activities from Spaw-Glass, L&L's work on the tunnel demolition project was delayed, however, as of July 23, 2014, the project was completed. Upon final inspection, after the August 8, 2014 contract expiration date, - the contractor and engineer did not like the appearance and condition of the sidewalk and would like the opportunity to remove and replace the sub-par sections of the concrete. We recommend the original contract be extended to November 15, 2014 to allow L&L General Contractors enough time to reconstruct the sidewalk. Very truly yours, Arceneaux Wilson & Cole, LLC Firm Registration 16194 i Joe M. Wi :o , P.E. Preside (409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642 www.awceng.com