HomeMy WebLinkAboutPR 18506: BDS CONSTRUCTORS CONTRACT MEMORANDUM
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: John A. Comeaux, P.E. Interim City Manager
FROM: John Tomplait, Assistant. Director of Utility Operations
DATE: August 22, 2014
RE: Proposed Resolution No. 18506
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 18506 authorizing
the execution of a contract for the Water Storage Standpipe on 61st Street Project with
BDS Constructors LLC. dba MK Constructors, of Vidor, Texas, in the total amount of
$2,825,250.00.
BACKGROUND
A Hurricane Recovery Grant administered by the Texas General Land Office will fund
this project. The Water Storage Standpipe is located on 61st Street at the cross street of
Garnet Ave. The capacity of the standpipe will be 2.4 million gallons. This is a major
milestone in improving the reliability and capabilities of the public water system serving
the Port Acres area. It will increase storage capacity, and pressure for the area. The
following three bids were received on August 13, 2014, with the lowest responsive bid
was submitted by BDS Constructors.
Bidder Total Bid
BDS Constructors $2,825,250.00
Vidor, TX
Alico, LLC $3,064,862.00
Beaumont, TX
Caldwell Tanks, Inc. $3,086,000.00
Louisville, KY
BUDGET/FISCAL EFFECT
This project will be funded through the GLO Project no. I22SPW, 144-1201-532.59-00.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 18506.
P.R.No. 18506
08/22/14
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE AWARD OF BID
AND THE EXECUTION OF A CONTRACT FOR THE
WATER STORAGE STANDPIPE ON 61ST STREET
WITH BDS CONSTRUCTORS, DBA MK
CONSTRUCTORS, OF VIDOR, TEXAS, IN THE
AMOUNT OF $2,825,250.00, PROJECT NO. I22SPW, 144-
1201-532.59-00.
WHEREAS, the Texas General Land Office (GLO) has approved funding for the
construction of the Water Storage Standpipe on 61St Street; and,
WHEREAS, the Utility Operations Department, Arceneaux Wilson & Cole LLC
(formerly Arceneaux & Gates Consulting Engineers, Inc.), and the Purchasing Division have
solicited bids for this project; and,
WHEREAS,the bids have been evaluated by Arceneaux Wilson& Cole LLC the Utility
Operations Department and Purchasing (Recommendation& Bid Tabulation attached as Exhibit
"A"); and
WHEREAS, BDS Constructors LLC, dba MK Constructors of Vidor, Texas has
submitted the lowest responsive bid for this work;NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to
execute, on behalf of the City of Port Arthur, a contract (attached as Exhibit "B") between the
City of Port Arthur and BDS Constructors LLC, dba MK Constructors for the Water Storage
Standpipe on 61st Street in the total amount of$2,825,250.00; and,
THAT, this project will be funded by the TGLO, in project no. I22SPW, 144-1201-
532.59-00; and,
THAT a copy of the caption of this resolution be spread upon the minutes of the City
Council.
P. R. No. 18506
08/22/14
Page 2 of 3
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor ;
Councilmembers:
NOES:
Deloris Prince
Mayor
ATTEST: APPROVED AS TO FORM:
1i •_ 1,2 14-1--1-1°
Sherri Bellard Valecia Tizeno
City Secretary City Attorney
APPROVED FOR ADMINISTRATION:
/
ilfA_....._..,.......e4„ Alt a n_____-
John A. Comeaux P.E. Shawna Tubbs, CPPB
Interim City Manager Purchasing Manager
John ' . Tomplai
As ' tant Director of Utility Operations
P.R. No. 18506
08/22/14
Page 3 of 3
APPROVED AS TO AVAILABILITY OF
FUNDS:
411,07.8,11/
Deborah Echols
Director of Finance
Account No.: 144-1201-532.59-00
Project no.: I22SPW
Exhibit "A"
(AW&C Recommendation& Bid Tabulation)
ARCENEAUX WILSON & COLE LLC
Arceneaux Wilson & Cole
AWCEngineering • Surveying • Planning
August 20, 2014
Mr. John Tomplait
Assistant Director of Utility Operations
City of Port Arthur
444 Fourth Street
Port Arthur, Texas 77640
RE: RECOMMENDATION OF AWARD OF CONTRACT
Water Storage Standpipe on 61st Street
GLO Grant Award ID:DRS225054, A&G Job No, CPA-865
Dear Mr. Tomplait:
On August 13, 2014 the City of Port Arthur received three (3) sealed bids for Water Storage
Standpipe on 61st Street in Port Arthur, Texas. The bids were opened at 3:15 pm and the
results read aloud in the public bid opening. There were no alternates proposed for this project.
The bids were checked for errors and tabulated. All Bidders acknowledged receipt of
Addendum No.1 and Addendum No. 2. All Bidders also submitted proof of Bid Surety and
Statements of Bidders Qualifications with their bids as required. No substitutions were
submitted. It was found that BDS CONSTRUCTORS LLC dba MK CONSTRUCTORS of Vidor,
Texas submitted the lowest responsive Total Amount Bid in the amount of $2,825,250.00. A
copy of the certified Bid Tabulation is enclosed for your information.
We have worked with BDS CONSTRUCTORS LLC dba MK CONSTRUCTORS on projects in
the past and have been pleased with the quality of work performed by the contractor. Based on
our past working history with the contractor we recommend that the City of Port Arthur award
the contract for Water Storage Standpipe on 61st Street on the basis the lowest responsive
Total Amount Bid in the amount of $2,825,250.00. Should you have any questions or require
additional information, please contact our office.
Very truly yours,
ARCENEAUX WILSON& COLE LLC
TEXAS REGISTERED ENGINEERING FIRM F-16194
Paul M. White, PE
Staff Engineer
Attached: Bid Tabulation
(409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642
www.awceng.com
�/
Arcencauv Wilson 8 Cole .x-1-44
A f W /■T♦'y Engineering
Surveying
Planning BID TABULATION
For The
WATER STORAGE STANDPIPE ON 61ST STREET
To Serve
The City of Port Arthur
Job No.: CPA-865
BIDS OPENED: AUGUST 13,2014 at 3:15 P.M.
BDS CONSTRUCTORS LLC ALLCO,L.L.C. CALDWELL TANKS,INC.
dba MK CONSTRUCTORS BEAUMONT,TX LOUISVILLE,KY
VIDOR,TX
Base Bid Items QTY. Unit Price Amount Unit Price Amount Unit Price Amount
1. Mobilization 1 $ 162,900.00 $ 162,900.00 $ 150,639.00 $ 150,639.00 $ 150,000.00 $ 150,000.00
2. Foundation 1 $ 92,450.00 $ 92,450.00 $ 349,965.00 $ 349,965.00 $ 300,000.00 $ 300,000.00
3. Test Pile 16"Diameter x 80' 1 $ 4,000.00 $ 4,000.00 $ 59,458.00 $ 59,458.00 $ 18,000.00 $ 18,000.00
4. Production Piles 1 $ 241,150.00 $ 241,150.00 $ 312,807.00 $ 312,807.00 $ 200,000.00 $ 200,000.00
5 Design&Construction of 2,400,000 Gallon 1 $ 2,071,200.00 $ 2,071,200.00 $ 1,999,993.00 $ 1,999,993.00 $ 1,865,000.00 $ 1,865,000.00
coated steel Water Standpipe
6._Connection to existing 16"PVC Waterline 1 $ 16,100.00 $ 16,100.00 $ 10,547.00 $ 10,547.00 $ 18,000.00 $ 18,000.00
including 16-Inch,GV&B,16-Inch DI Tee
7 Manifold including all DI Piping,DI Fittings,all 1 $ 105,850.00 $ 105,850.00 $ 63,265.00 $ 63,265.00 $ 110,000.00 $ 110,000.00
GV&B,16-Inch Altitude Valve
8. Site Work 1 $ 80,200.00 $ 80,200.00 $ 63,708.00 $ 63,708.00 $ 75,000.00 $ 75,000.00
9. Painting 1 $ 5,000.00 $ 5,000.00 $ 2,261.00 $ 2,261.00 $ 300,000.00 $ 300,000.00
10. Disinfection of Standpipe and Piping 1 $ 5,000.00 $ 5,000.00 $ 3,066.00 $ 3,066.00 $ 3,000.00 $ 3,000.00
11. Electrical and Instrumentation 1 $ 16,900.00 $ 16,900.00 $ 27,155.00 $ 27,155.00 $ 25,000.00 $ 25,000.00
12. SCADA System 1 $ 18,000.00 $ 18,000.00 $ 18,000.30 $ 18,000.30 $ 18,000.00 $ 18,000.00
13. Stormsewer Prevention Pollution Plan 1 $ 5,500.00 $ 5,500.00 $ 3,147.70 $ 3,147.70 $ 3,000.00 $ 3,000.00
14. Design&Implementaion of Trench Saety System 1 $ 1,000.00 $ 1,000.00 $ 850.00 $ 850.00 $ 1,000.00 $ 1,000.00
TOTAL AMOUNT BID $ 2,825,250.00 $ 3,064,862.00 $ 3,086,000.00
ARCENEAUX WILSON&COLE LLC
TEXAS REGISTERED ENGINEERING FIRM F-16194
u?g.oF`T�" 8h
\-.."_._._..-- , A'; \ISINI
Paul M.White, PE PAUL M.WHITE
65488�~c AY
,03 vp.,k.,_..,..,,____....4100 L r-Or
-`4`1414.117A"'13 ttS 17-41 k.ts 11.4 .
Exhibit "B"
(Contract: A complete copy of Exhibit`B" is available for view in the
City Secretary's Office)