HomeMy WebLinkAboutPR 18536: PHASE III PERFORMANCE CONTRACTING AGMT. WITH SIEMENS INDUSTRY, INC. MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: John A. Comeaux P.E., Interim City Manager FROM: John A. Tomplait, Assistant Director of Utility Operations DATE: September 5, 2014 RE: Proposed Resolution No. 18536 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No.18536 authorizing the execution of a contract for a phase Ill water loss reduction, water meter improvements and a City wide fixed based automatic meter infrastructure, with Siemens Industry, Inc., of Houston, Texas, in the amount not to exceed $8,021,021.00. BACKGROUND This contract is to provide services for the following projects: 1) Reduction of water loss through the identification and repair of hydrant leaks. 2) Large meter replacements, and 3) Automatic metering system upgrades. Siemens has submitted a scope of work, payment schedules, performance assurance, and a performance contracting agreement. BUDGET/FISCAL EFFECT This project will be funded from the Utility Operations budget savings. SUMMARY I recommend that the City Council approve Proposed Resolution No. 18536. P. R. No. 18536 09/05/14 jt/vrt RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT FOR PHASE III OF A PERFORMANCE CONTRACTING AGREEMENT BETWEEN THE CITY OF PORT ARTHUR AND SIEMENS INDUSTRY, INC., BUILDING TECHNOLOGIES DIVISION, FOR THE REPLACEMENT OF FIRE HYDRANTS, LARGE WATER METER REPLACEMENTS, AND CITY-WIDE RETROFIT TO FIXED BASED SYSTEM, AND AUTOMATIC METER READING SYSTEM UPGRADE, IN AN AMOUNT NOT-TO-EXCEED $8,021,021.00 (FUNDING CONTINGENT UPON APPROVAL OF FINANCING). WHEREAS, the Water Utilities Department has extensively reviewed measures to improve its system infrastructure and operational efficiencies; and, WHEREAS, pursuant to Resolution Number 12-147, the City Council authorized the original Performance Contract Phase I for energy improvement and upgrades with Siemens; and, WHEREAS, pursuant to Resolution Number 13-393, the City Council authorized a Performance Contract Phase II for the Police Department's HVAC improvement and upgrades with Siemens; and, WHEREAS, Siemens Industry, Inc., Building Technologies Division has presented a Phase III proposal specifically addressing the City's water infrastructure WHEREAS, this contract will provide services for the following projects: 1) reduction of water loss through the identification and repair of hydrant leaks, 2) large meter replacements, and 3) automatic metering system upgrades; and, WHEREAS, Exhibit"A" includes a scope of work which indicates that 117 fire hydrants and 229 water meters that are three inches or larger will be replaced during this project; and, WHEREAS,transmitters will be installed for the new large meters and retrofitted for 18,706 existing smaller meters, which will facilitate a city-wide fixed based automatic meter infrastructure as specifically stated in Exhibit"A"; and, P. R. No. 18536 09/05/14 jt/vrt Page 2 WHEREAS, the payment schedules are attached as Exhibit "B" whereby the City will pay to Siemens Industry, Inc., Building Technologies Division $8,021,021.00 (plus taxes, if applicable) in ten monthly payments; and, WHEREAS, Performance Assurances are also attached as Exhibit"C"; and, WHEREAS, Siemens will complete the work no later than 360 calendar days from the day of commencement; and, WHEREAS, the proposed cost of said project is $8,021,021, which will be funded by the City of Port Arthur by a Tax Exempt Term Lease agreement, which is authorized pursuant to Chapter 302 of the Texas Local Government Code and will provide water and operational cost savings that can offset the cost of the project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, a contract between the City of Port Arthur and Siemens Industry, Inc. Building Technologies Division for Phase III project in an amount not to exceed $8,021,021.00, in substantially the same form as attached hereto as (Exhibit"D"). THAT said contract and financing is authorized pursuant to Chapter 302 of the Texas Local Government Code, which sets forth the parameters for Energy Savings Performance contracts for local governments. THAT execution of this contract is contingent upon the final approval of financing. THAT a copy of the caption of this resolution be spread upon the minutes of the City Council. P. R. No. 18536 09/05/14 jt/vrt Page 3 READ, ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Debris Prince Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Va ecia Tizeno City Secretary City Attorney APPROVED FOR ADMINISTRATION: John A. Comeaux P.E. Shawna Tubbs, CPPB Interim City Manager Purchasing Manager John A. Tomplait Assistant Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: POU-Olz _7142i Deborah Echols Director of Finance