HomeMy WebLinkAboutPR 18581: CHANGE ORDER NO. 5 ALLCO, L.L.C.; 24" WATERLINE 19TH STREET MEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: John A. Comeaux P.E., City Manager FROM: John A. Tomplait, Assistant Director of Utility Operations c / DATE: September 16, 2014 RE: Proposed Resolution No. 18581 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18581 authorizing the execution of Change Order No.5 for the 24" Waterline from 19th Street to the Sabine Neches Canal Project with ALLCO, L.L.C., of Beaumont, Texas, this change order for the relocation of the proposed 24" waterline to avoid an existing structure at the intersection of 18th Street and Railroad Ave. in the amount of $53,100.00. The Relocation and new alignment will provide sufficient room between the 24" waterline and the existing structure to avoid potential issues in the future. Also, included is a time extension of three (3) days due to inclement weather. BACKGROUND This project will extend a 24" water transmission main from the old Water Purification Plant to W. 7th Street and SH 82. BUDGET/FISCAL EFFECT Pursuant to Resolution No. 12-597, funding for this project will be charged through a City Account No. 429-1258-532.59-00, and Project No. WSI003. SUMMARY I recommend that the City Council approve Proposed Resolution No.18581. P. R. No. 18581 09/16/14 jt RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 5 BETWEEN THE CITY OF PORT ARTHUR AND ALLCO, L.L.C.; FOR THE 24" WATERLINE FROM 19TH STREET TO THE SABINE NECHES CANAL, IN AN AMOUNT NOT TO EXCEED $53,100.00 INCREASING THE CONTRACT AMOUNT TO $3,198,638.00 AND A TIME EXTENSION OF THREE (3) DAYS, INCREASING THE CONTRACT TIME TO 383 DAYS,UTILITY OPERATIONS ACCOUNT NO. 429-1258-532.59-00,PROJECT NO WSI003. WHEREAS, per Resolution No. 13-503, the City entered into a contract for the installation of a Waterline from 19th Street to the Sabine Neches Canal, in the amount of $3,114,960.00, with a contract term of 365 calendar days; and WHEREAS, per Resolution No. 14-210, Change Order 1 authorized an additional $40,486.00 to add storm water pollution prevention measures required by the City of Port Arthur that was not included in the original contract, bringing the contract price for the project to $3,1 55,446.00 accepted by Allco; and WHEREAS, per Resolution No. 14-300, Change Order 2 authorized a credit of $21,980.00 for the use of 24" Certa-Loc restrained joint C900 pvc pipe in lieu of the 24" cement lined restrained joint gasket ductile iron pipe in the original bid to a new contract total of $3,133,466, and a time extension of six (6) days due to inclement weather bring the date of completion to January 25,2015; and WHEREAS, per Resolution No. 14-342, Change Order 3 authorized an additional $12,072.00 for the relocation of an existing 6"waterline that was discovered during construction on Charleston Ave, the re-route of the 24" waterline to miss an existing storm sewer, and one foot of extra cover added to the 24" waterline approx. 2,100 L.F. to ensure protection of the line during the 18th Street construction project to a new contract total of$3,145,538.00, and a time P. R. No. 18581 09/16/14 jt Page 2 of 4 extension of six (6) days due to inclement weather bringing the date of completion to January 31, 2015; and, WHEREAS, per Resolution No. 14-389, Change Order 4, authorized a time extension of 3 days due to weather delays to a new completion date of February 3,2015; and, WHEREAS,Allco, Inc. is requesting Change Order 5, for the relocation of the proposed 24"waterline to avoid an existing structure at the intersection of 18t Street and Railroad Ave. in the amount not to exceed$53,100.00 and a time extension of three(3)days due to inclement weather; and, WHEREAS, relocation and new alignment will provide sufficient room between the 24" waterline and the existing structure to avoid potential issues in the future; and, WHEREAS, Arceneaux Wilson & Cole LLC, has requested and recommended Change Order No. 5 increasing the time extension of three (3) days for a new contract time of 383 days with a new completion date of February 6, 2015, and increasing the contract price to $3,198,638.00 this change order has been evaluated by Arceneaux Wilson & Cole LLC, and the Utility Operations Department(attached hereto as Exhibit"A"); NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 5 between the City of Port Arthur and Allco L.L.C., for the increased time extension of three (3) days for a new contract time of 383 days with a new completion date of February 6, 2015, and increasing the contract price by $53,100.00 to a new contract price of $3,198,638.00 attached hereto as Exhibit "A"; and, P. R. No. 18581 09/16/14 jt Page 3 of 4 THAT a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: aJL �/�ALA. Sherri Bellard Valecia Tize'. , City Secretary City Attorney APPROVED FOR ADMINISTRATION: .fA _ John A. Comeaux, PE Shawna Tubbs, CPPB Interim City Manager Purchasing Manager P. R. No. 18581 09/16/14 jt Page 4 of 4 /f. Jo • Tomplait A.si t Director of Utilities APPROVED AS TO AVAILABILITY OF FUNDS: orah Echols Director of Finance Account No.: 429-1258-532.59-00 Project No.: WSI003 Exhibit "A" (AW&C Change Order No.5) ARCENEAUX WILSON & COLE LLC Arceneaux Wilson & Cole _- AWCEngineering • Surveying • Planning September 11, 2014 Mr. John Tomplait Assistant Director of Water Utilities City of Port Arthur 444 Fourth Street Port Arthur, Texas 77640 RE; PROPOSAL FOR CHANGE ORDER NO 5 24"WATERLINE FROM 19TH STREET TO THE SABINE-NECHES CANAL Job No, CPA-650 Dear Mr. Tomplait: Attached is Change Order No. 5 for the 24" Waterline from 19th Street to the Sabine-Neches Canal. This change order is for the relocation of the proposed 24" waterline to avoid an existing structure. The relocation and new alignment will provide sufficient room between the 24" waterline and the existing structure to avoid potential issues in the future. Also, included in this change order is a time extension of 3 days due to weather delays. I recommend that the City of Port Arthur authorize this change to the contract. I have attached Change Order No. 5 which modifies the contract to reflect this change for your consideration and action. Should you have any questions or require additional information, please contact our office. Very truly yours, Arceneaux Wilson & Cole LLC TEXAS REGISTERED ENGINEERING FIRM F-16194 Keestan Cole, PE Vice-President (409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642 www.awceng.com