HomeMy WebLinkAboutPR 18651: MK CONSTRUCTORS CHANGE ORDER NO. 6 MEMORANDUM CITY OF PORT ARTHUR Utility Operations Department TO: John A. Comeaux, P.E., Interim City Manager FROM: John A. Tomplait, Assistant Director Utility Operations DATE: October 15, 2014 RE: Proposed Resolution No. 18651 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18651 authorizing the City Manager to execute Change Order No. 6 to the contract for the Gulf Storage Tanks Project with MK Constructors of Vidor, Texas. This change order is a request to increase the contract time by 34 days due to weather delays. BACKGROUND A Hurricane Recovery Grant administered by the Texas General Land Office is funding the majority of this project to replace one GST and construct a second GST & Pump Station at our existing Gulf GST & PS facility on South Gulfway Drive near the Gulf Copper docks. This project is a major milestone in improving the reliability and capabilities of the public water system serving the Sabine Pass area. It will increase pumping and storage capacity, and provide for an emergency generator to keep water flowing during power outages. This Change Order is for a time extension of 34 days. BUDGET/FISCAL EFFECT None, Project No. 1121 GST, 144-1201-532.85-00. SUMMARY I recommend that the City Council approve the execution of Proposed Resolution No. 18651. P.R. No. 18651 P.R. No. 18651 10/15/14 jt RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 6 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR, MK CONSTRUCTORS, OF VIDOR, TEXAS, AND GLO FOR THE GULF STORAGE TANK PROJECT INCREASING THE CONTRACT TIME BY 34 DAYS, TO A NEW CONTRACT TIME OF 494 DAYS. PROJECT NO. I21GST,ACCOUNT NO. 144-1201-532.85-00. WHEREAS, per Resolution No. 13-340, the City Council awarded a contract for the Gulf Storage Tanks Project to MK Constructors,of Vidor, Texas; and, WHEREAS, per Resolution No. 13-569, Change Order No. 1 authorized the removal of 100 L.F. of abandoned 6" steel pipe, increasing the total amount by $3,900.00; and, WHEREAS,per Resolution No. 14-125, Change Order No. 2 authorized the removal and plugging of two (2) abandoned 6" oil pipelines that were discovered at the project site and removal and disposal of 3,600 gallons of residual petroleum increasing the contract by $27,650.00; and, WHEREAS, per Resolution No. 14-116, Change Order No. 3 authorized increasing the amount by$6,908.57 to a total of$1,963,358.57 for the substitutions on certain valves requested by the Water Utilities Department for technical reasons; and, WHEREAS,per Resolution No. 14-351, Change Order 4 authorized the relocation of the existing access driveway was needed along with the relocation of existing electrical service, conduit and wiring to provide power to four motor operated valves and a Mag Meter, also for the installation of four remote control stations for the motor operated valves, and to re-construct the steel platform for the additional electrical panels that were missing from the design drawings, this Change Order included an increase by $36,095.00 and a 76 day contract time extension to a P.R.No. 18651 10/15/14 jt Page 2 of 4 new completion date to November 30,2014; and, WHEREAS,per Resolution No. 14-387, Change Order 5 authorized a time extension of 19 days due to weather delays and delays due to electrical service not installed by Entergy; and, WHEREAS, MK Constructors of Vidor, Texas has requested a Change Order for a time extension of 34 days due to weather delays and delays due to an electrical service not installed by Entergy; and, WHEREAS, the project engineer, Arceneaux Wilson & Cole LLC, recommends proposed Change Order No. 6 for a time extension of 34 days, attached as Exhibit "A", to accomplish this work; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 6 (attached as Exhibit "A") to the contract between the City of Port Arthur and MK Constructors for an increased time extension of 34 days, bringing the total contract time to 494 days with a new completion date of January 22, 2015 and, THAT, Change Order No. 6 requires no funding by the Project No. I21GST, 144-1201- 532.85-00; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. P.R.No. 18651 10/15/14 jt Page 3 of 4 READ, ADOPTED AND APPROVED THIS day of , 2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers: NOES: Debris Prince Mayor ATTEST: APPROVED AS TO FORM: SL:i'd A Sherri Bellard Valecia Tize,jf City Secretary City Attorney P.R.No. 18651 10/15/14 jt Page 4 of 4 APPROVED FOR ADMINISTRATION: /1. John A. Comeaux, P.E. Shawna Tubbs, CPPB Interim City Manager Purchasing Manager Jo' . To 'plait Assi,tant Director of Utilities APPROVED AS TO AVAILABILITY OF FUNDS: Deborah Echols Director of Finance Account No. 144-1201-532.85-00 Project No. IGST Exhibit "A" (A&G Change Order No. 6) (GLO Change Order No. 6) ARCENEAUX WILSON & COLE LLC Arceneaux Wilson & Cole- -A-1-Y AWCEngineering • Surveying • Planning October 14, 2014 Mr. John Tomplait Assistant Director of Water Utilities City of Port Arthur 444 Fourth Street Port Arthur, Texas 77640 RE; PROPOSAL FOR CHANGE ORDER NO 6 Gulf Storage Tanks Job No CPA-800 Dear Mr. Tomplait: Attached is Change Order No. 6 for the Gulf Storage Tanks project. This change order is a request to increase the contract time by 34 days. The contractor has requested a time extension of 34 days due to weather delays and delays due to the electrical service not installed by Entergy. I recommend that the City of Port Arthur authorize this change to the contract. I have attached Change Order No. 6 which modifies the contract to reflect this change for your consideration and action. Should you have any questions or require additional information, please contact our office. Very truly yours, ARCENEAUX WILSON& COLE LLC TEXAS REGISTERED ENGINEERING FIRM F-16194 estan Cole, PE Vice President 2901 Turtle Creek Dr.,Suite 320 Port Arthur,TX 77642 Phone: 409/724-7888 Fax: 409/724-1447 ArCenoaux W11son & Cole•i.•3•R•1 .*.-�'-]!� AWC Engineering Surveying Planning CHANGE ORDER No. 6 DATE: September 22, 2014 JOB NO. CPA-800 AGREEMENT DATE: August 7, 2013 NAME OF PROJECT: Gulf Storage Tanks OWNER: CITY of PORT ARTHUR CONTRACTOR: BDS Constructors LLC dba MK Constructors The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Add the following Items to the Contract and Scope of Work: a. Extend contract time by 34 days CHANGE ORDER NO. 6 September 22, 2014 Job No. CPA-800, Contract No. 1 Awc Engineenrrg Surveyrng Planning CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $1,924,900.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $1,999,453.57 The CONTRACT PRICE due to this CHANGE ORDER will be [greased-} [decreased] by: $0.00 Dollars The new CONTRACT PRICE, including this CHANGE ORDER, will be $1,999,453.57 CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 365 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 95 Calendar Days CURRENT DATE OF COMPLETION: December 19, 2014 CONTRACT TIME due to this CHANGE ORDER will be increased by 34 Days The New DATE OF COMPLETION: January 22, 2015 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY ENGINEER: ACCEPTED BY: - -. - - , I I ARCENEAUX WILSON & COLE LLC [CONTRACTOR,OFFICER OR OWNER] DBS CONSTRUCTORS LLC DBA MK CONSTRUCTORS ACCEPTED BY: CITY of PORT ARTHUR 2 of 2 okAL L,4 1,,,::001 ° Texas General Land Office w \l'a- n Disaster Recovery {- r lt.: nt FS>• $36 oi.is HEo — Construction Contract Change Order Request Form Engineer: Owner (Contractor Locality): Contractor: BDS Constructors LLC dba MK Aceneaux&Gates Engineers, Inc., City of Port Arthur Constructors A Burrow Global Company 444 4th Street 2485 North Street 2901 Turtle Creek Dr., Suite 320 Port Arthur,TX 77642 Vidor,TX 77662 Port Arthur,TX 77642 Phone No.:409-983-8100 Phone No.: 409-724-7888 Agreement Date: August 7,2013 Phone No.:409-769-0089 Date: September 22, 2014 Contract For (Project Description): GLO Contract No.: Project Code No.: P21105 Gulf Storage Tanks 12-305-025-6542 Bid Package No.: 2 Change Order No.: 6 You are hereby requested to comply with the following changes from the contract plans and specifications: Item Description of Changes: Quantities, Units, Unit Prices, Decrease in Increase in No. Change in Completion Scheduled, Etc. Contract Price Contract Price Construction Contract Change Order Request Form Page 1 of 3 CDBG Disaster Recovery Program May 2012 Change in Contract Price Change in Contract Time (Calendar Days) Original Contract Price: $ 1,924,900.00 Original Contract Time: 365 days Previous Change Order(s): Net Change From Previous No. 1 to No. 6 $ 73,743.57 Change Orders: 95 days Contract Price Prior to Contract Time Prior to this Change Order: $ 1,999,453.57 this Change Order: 95 days Net lncreasc/Decrcasc of Net Increase/Devoe of this Change Order: $0.00 this Change Order: 34 days Contract Price With all Contract Time With all Approved Change Orders: $ 1,999,453.57 Change Orders: 494 days Cumulative Percent Change in Contract Price (+/-): Grantee Contract End Date: + 3.8 % (mm/dd/yy) 12 /31 /2015 Construction Contract Start Date: Construction Contract End Date: (mm/dd/yy) 9 /16/2013 (mm/dd/yy) 1 /22/2015 Reimbursements of costs included in this change order are subject to review by the GLO-DR program. * This document may be executed prior to submission for GLO-DR program review, but all parties involved will be held responsible if the change order or the amendment warranted as a result of this change order is not in compliance with CDBG or HUD requirements. RECOMMENDED: APPROVED: ACCEPTED: By: By: B : ENGINEER OWNER CONTRACTOR Date: ./V Date: Date: 10 Construction Contract Change Order Request Form Page 2 of 3 CDBG Disaster Recovery Program May 2012 JUSTIFICATION FOR CHANGE 1. Will this Change Order increase or decrease the number of beneficiaries? ❑ Increase ❑ Decrease El No Change If there is a change, how many beneficiaries will be affected? Total L/M 2. Effect of this change on scope of work: IJ Increase ❑ Decrease ❑ No Change 3. Effect on operation and maintenance costs: ❑ Increase ❑ Decrease El No Change 4. Are all prices in the change order dependent upon unit prices found in the original bid? El Yes ❑ No If"No", explain: 5. Has this change created new circumstances or environmental conditions which may affect the project's impact, such as concealed or unexpected conditions discovered during actual construction? ❑ Yes El No If"Yes", is an Environmental Re-assessment required? 6. Is the Texas Commission on Environmental Quality (TCEQ) clearance still valid? (if applicable) El Yes ❑ No 7. Is the TCEQ permit approval still valid? (sewer projects only) ❑ Yes ❑ No 8. Are the handicapped access requirements/approval still valid? (if applicable) ❑ Yes ❑ No 9. Are other Disaster Recovery contractual special condition clearance still valid? El Yes ❑ No (If no, specify): NOTE: * Generally, a cumulative change in the contract price in excess of 25% cannot be reviewed (18% decrease for counties). Construction Contract Change Order Request Form Page 3 of 3 CDBG Disaster Recovery Program May 2012