HomeMy WebLinkAboutPR 18680: ALLCO, LLC FOR 24 INCH WATERLINE FROM 19TH ST TO SABINE NECHES CANAL MEMORANDUM
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: John A. Comeaux P.E., City Manager
FROM: John A. Tomplait, Assistant Director of Utility Operations
DATE: October 24, 2014
RE: Proposed Resolution No. 18680
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 18680 authorizing
the execution of Change Order No. 6 for the 24" Waterline from 19th Street to the
Sabine Neches Canal Project with ALLCO, L.L.C., of Beaumont, Texas. This change
order is for the relocation of an existing 12" waterline at Railroad Ave. in the amount of
$52,659.00. The Relocation will provide sufficient room between the 12" waterline and
the existing structure to avoid potential issues in the future. Also, included is a time
extension of eight (8) days due to inclement weather.
BACKGROUND
This project will extend a 24" water transmission main from the old Water Purification
Plant to W. 7th Street and SH 82.
BUDGET/FISCAL EFFECT
Pursuant to Resolution No. 12-597, funding for this project will be charged through a
City Account No. 429-1258-532.59-00, and Project No. WSI003.
SUMMARY
I recommend that the City Council approve Proposed Resolution No.18680.
P. R. No. 18680
10/24/14 jt
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE CHANGE ORDER NO. 6 BETWEEN THE
CITY OF PORT ARTHUR AND ALLCO, L.L.C.; FOR
THE 24" WATERLINE FROM 19TH STREET TO THE
SABINE NECHES CANAL, IN AN AMOUNT NOT-TO-
EXCEED $52,659.00, INCREASING THE CONTRACT
AMOUNT TO $3,251,297.00, AND A TIME EXTENSION
OF EIGHT (8) DAYS, INCREASING THE CONTRACT
TIME TO 391 DAYS. UTILITY OPERATIONS
ACCOUNT NO. 429-1258-532.59-00, PROJECT NO
WSI003.
WHEREAS, per Resolution No. 13-503, the City entered into a contract for the
installation of a Waterline from 19t Street to the Sabine Neches Canal, in the amount of
$3,114,960.00,with a contract term of 365 calendar days; and
WHEREAS, per Resolution No. 14-210, Change Order 1 authorized an additional
$40,486.00 to add storm water pollution prevention measures required by the City of Port Arthur
that was not included in the original contract, bringing the contract price for the project to
$3,155,446.00 accepted by Allco; and
WHEREAS, per Resolution No. 14-300, Change Order 2 authorized a credit of
$21,980.00 for the use of 24" Certa-Loc restrained joint C900 pvc pipe in lieu of the 24" cement
lined restrained joint gasket ductile iron pipe in the original bid to a new contract total of
$3,133,466 and a time extension of six (6) days due to inclement weather bring the date of
completion to January 25,2015; and
WHEREAS, per Resolution No. 14-342, Change Order 3 authorized an additional
$12,072.00 for the relocation of an existing 6"waterline that was discovered during construction
on Charleston Ave, the re-route of the 24" waterline to miss an existing storm sewer, and one
foot of extra cover added to the 24" waterline approx. 2,100 L.F. to ensure protection of the line
during the 18th Street construction project to a new contract total of$3,145,538.00, and a time
P. R. No. 18680
10/24/14 jt
Page 2 of 4
extension of six (6) days due to inclement weather, bringing the date of completion to January
31, 2015; and,
WHEREAS, per Resolution No. 14-389, Change Order 4, authorized a time extension
of 3 days due to weather delays,to a new completion date of February 3, 2015; and,
WHEREAS,per Resolution No. 14-449, Change Order 5, authorized the relocation of
the proposed 24"waterline to avoid an existing structure at the intersection of 18th Street and
Railroad Ave. in the amount not to exceed$53,100.00 to a new contract total of$3,198,638.00
and a time extension of three(3) days due to inclement weather bring the date of completion to
February 6, 2015; and,
WHEREAS,Allco LLC. is requesting Change Order 6, for the relocation of
an existing 12"waterline at Railroad Ave. in the amount not to exceed$52,659.00,and a time
extension of eight(8) days due to inclement weather; and,
WHEREAS, relocation will provide sufficient room between the 12"waterline and the
existing structure to avoid potential issues in the future; and,
WHEREAS, Arceneaux Wilson & Cole LLC, has requested and recommended Change
Order No. 6 increasing the time by eight(8)days for a new contract time of 391 days with a new
completion date of February 14, 2015, and increasing the contract price to $3,251,297.00; this
change order has been evaluated by Arceneaux Wilson & Cole LLC, and the Utility Operations
Department(attached hereto as Exhibit"A"); NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to
execute, on behalf of the City of Port Arthur, Change Order No. 6 between the City of Port
P. R. No. 18680
10/24/14 jt
Page 3 of 4
Arthur and Allco L.L.C., for the increased time extension of eight (8) days for a new contract
time of 391 days, with a new completion date of February 14,2015, and increasing the contract
price by $52,659.00 to a new contract price of$3,251,297.00, attached hereto as Exhibit "A";
and,
THAT a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ, ADOPTED AND APPROVED THIS day of , 2014
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince
Mayor
ATTEST: APPROVED AS TO FORM:
0 411.
■
Sherri Bellard Valecia Tizeno
City Secretary City Attorney
P. R. No. 18680
10/24/14 jt
Page 4 of 4
APPROVED FOR ADMINISTRATION:
y /
!L-<: i L_iC /)
John A. Comeaux, PE awna Tubbs, CPPB
Interim City Manager Purchasing Manager
�Zr .LC
. .
John • . Tomplai I
• - tant Director of Utilities
APPROVED AS TO AVAILABILITY OF
FUNDS:
Deborah Echols
Director of Finance
Account No.: 429-1258-532.59-00
Project No.: WSI003
Exhibit "A"
(AW&C Change Order No.6)
, ARCENEAUX WILSON & COLE LLC
Arceaeaus Wilson & Cale-
AWC _ Engineering • Surveying • Planning
October 21, 2014
Mr. John Tomplait
Assistant Director of Water Utilities
City of Port Arthur
444 Fourth Street
Port Arthur, Texas 77640
RE: PROPOSAL FOR CHANGE ORDER NO. 6
24"WATERLINE FROM 19TH STREET TO THE SABINE NECHES CANAL
Job No, CPA-650
Dear Mr. Tomplait:
Attached is Change Order No. 6 for the 24" Waterline from 19th Street to the Sabine-Neches
Canal. This change order is for the relocation of existing 12" waterline at Railroad Avenue. The
relocation will provide sufficient room between the 12" waterline and the existing structure to
avoid potential issues in the future. Also, included in this change order is a time extension of 8
days due to weather delays. I recommend that the City of Port Arthur authorize this change to
the contract. I have attached Change Order No. 6 which modifies the contract to reflect this
change for your consideration and action. Should you have any questions or require additional
information, please contact our office.
Very truly yours,
Arceneaux Wilson & Cole LLC
TEXAS REGISTERED ENGINEERING FIRM F-16194
Keestan Cole, PE
Vice-President
(409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642
www.awceng.com
Lrceneaus Wilson R Cote-
AWC
CHANGE ORDER No 6
DATE: October 20, 2014 JOB NO. CPA-650
AGREEMENT DATE: November 5, 2013
NAME OF PROJECT: 24" Waterline from 19th Street to the Sabine-Neches Canal
OWNER: CITY of PORT ARTHUR
CONTRACTOR: ALLCO
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following Items to the Contract and Scope of Work:
a. Relocation of existing 12" waterline located at
Railroad Ave. Install approximately 100 L.F.
of 12" pipe, one (1) 12" Gate Valve, one (1) 12"
Gate Valve, one (1) 12" Tee, one (1) 12" Tee,
one (1) 12"x6" Tee and eight (8) 12" 45 Degree
Bends. Tie-in to the proposed 24" waterline.
($52,659.00/L.S.) [+] $ 52,659.00
b. Extend contract time by 8 days
TOTAL $ 52,659.00
CHANGE ORDER NO 6
Arccn cau: Wilson & Cole-':, October 20, 2014
ANVCJob No. CPA•$5O, Contract No, I
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $3,114,960.00
CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3,198,638.00
The CONTRACT PRICE due to this CHANGE ORDER will be [increased] [ted]
by: $52,659.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be $3,251,297.00
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 365 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 18 Calendar Days
CURRENT DATE OF COMPLETION: February 6, 2015
CONTRACT TIME due to this CHANGE ORDER will be increased by 8 Days
The New DATE OF COMPLETION: February 14,2015
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY ENGINEER: ACCEPTED BY:
ARCENEAUX WILSON & COLE LLC [CONTRACTOR,OFFICER OR OWNER{
ALLCO
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2