HomeMy WebLinkAboutUntitled (2) ,
i
i
li
II
//� ,
!I
Arceneaux V ,l,on $ „• ARCF 1 FAUX WILSON & COLE LLC
&WCEngineering • Surveying • Planning
October 21, 2014
Mr. John Tomplait
Assistant Director of Water Utilities
City of Port Arthur
444 Fourth Street
Port Arthur, Texas 77640
RE: PROPOSAL FOR CHANGE ORDER NO, 6
24”WATERLINE FROM 19TH STREET TO THE SAB/NE-NECHES CANAL
Job No. CPA-650
Dear Mr. Tomplait:
Attached is Change Order No. 6 for the 24" Waterline from 19th Street to the Sabine-Neches
Canal. This change order is for the relocation of existing 12" waterline at Railroad Avenue. The
. relocation will provide sufficient room between the 12" waterline and the existing structure to
avoid potential issues in the future. Also, included in this change order is a time extension of 8
days due to weather delays. I recommend that the City of Port Arthur authorize this change to
the contract. I have attached Change Order No. 6 which modifies the contract to reflect this
change for your consideration and action. Should you have any questions or require additional
information, please contact our office.
Very truly yours,
Arceneaux Wilson & Cole LLC
TEXAS REGISTERED ENGINEERING FIRM F-16194
.•7— '.t<t -';'
Keestan Cole, PE
Vice-President
•
(409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642
www.awceng.com