Loading...
HomeMy WebLinkAboutUntitled (2) , i i li II //� , !I Arceneaux V ,l,on $ „• ARCF 1 FAUX WILSON & COLE LLC &WCEngineering • Surveying • Planning October 21, 2014 Mr. John Tomplait Assistant Director of Water Utilities City of Port Arthur 444 Fourth Street Port Arthur, Texas 77640 RE: PROPOSAL FOR CHANGE ORDER NO, 6 24”WATERLINE FROM 19TH STREET TO THE SAB/NE-NECHES CANAL Job No. CPA-650 Dear Mr. Tomplait: Attached is Change Order No. 6 for the 24" Waterline from 19th Street to the Sabine-Neches Canal. This change order is for the relocation of existing 12" waterline at Railroad Avenue. The . relocation will provide sufficient room between the 12" waterline and the existing structure to avoid potential issues in the future. Also, included in this change order is a time extension of 8 days due to weather delays. I recommend that the City of Port Arthur authorize this change to the contract. I have attached Change Order No. 6 which modifies the contract to reflect this change for your consideration and action. Should you have any questions or require additional information, please contact our office. Very truly yours, Arceneaux Wilson & Cole LLC TEXAS REGISTERED ENGINEERING FIRM F-16194 .•7— '.t<t -';' Keestan Cole, PE Vice-President • (409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642 www.awceng.com