HomeMy WebLinkAboutPR 18761: CHANGE ORDER NO. 1, REPAIR OF THE 66" RCP STORM SEWER ON SHREVEPORT AVE. MEMORANDUM
CITY OF PORT ARTHUR
PUBLIC WORKS - ENGINEERING DIVISION
TO: John A. Comeaux, P.E., Interim City Manager
FROM: Susan Polka, P.E., Director of Public Works/City Engineer
DATE: December 2, 2014
RE: Proposed Resolution No. 18761
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 18761 that would
authorize the City Manager to execute Change Order No. 1 to the contract with BDS
Constructors, LLC, dba MK Constructors, for repair of the 66" RCP storm sewer on
Shreveport Avenue, increasing the amount of the contract by $5,500.00.
BACKGROUND
By Resolution 14-395 dated September 2, 2014, the City Council awarded a contract to
BDS Constructors, LLC, dba MK Constructors, of Vidor, Texas, in the amount of
$167,419.00 for removing and replacing an existing 66" storm sewer pipe, constructing
two junction boxes, water line replacement, and street reconstruction/resurfacing on
Shreveport Avenue, between Procter Street and 5th Street. Change Order No. 1 to the
contract is an increase of $5,500.00 for the unanticipated removal and replacement of
an existing 8"water line, including concrete removal, backfill and surface replacement.
BUDGET/FISCAL EFFECT
There is currently sufficient funding for this project provided in Project No. GO-805,
Account No. 301-1601-591.84-00, including the funding of $5,500.00 for Change Order
No. 1. A budget adjustment will be necessary to establish Account No. 301-1601-
591.84-00 at $172,919.00.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 18761 that would
authorize the City Manager to execute Change Order No. 1 to the construction contract
with BDS Constructors, LLC, dba MK Constructors, increasing the contract amount by
$5,500.00.
P.R. No. 18761
12/2/14 sjp
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT
BETWEEN THE CITY OF PORT ARTHUR AND BDS
CONSTRUCTORS, LLC, DBA MK CONSTRUCTORS, OF
VIDOR, TEXAS, FOR THE REPAIR OF THE 66" RCP
STORM SEWER ON SHREVEPORT AVENUE BETWEEN
PROCTER STREET AND 5TH STREET, INCREASING THE
CONTRACT AMOUNT BY $5,500.00 TO A NEW CONTACT
AMOUNT OF $172,919.00. PROJECT NO. GO-805,
ACCOUNT NO. 301-1601-591.84-00.
WHEREAS, on September 2, 2014, per Resolution 14-395, the City Council
awarded a contract for the repair of the 66" storm sewer on Shreveport Avenue between
Procter Street and 5th Street; and,
WHEREAS, during construction of the project, it was determined that an
existing 8"water line had to be relocated; and,
WHEREAS, BDS Constructors, LLC, dba MK Constructors, has submitted
Change Order No. 1 for the project, and the Public Works Director/City Engineer and
the Project Engineer recommend approval of Change Order No. 1 in the amount of
$5,500.00, attached as Exhibit "A" to accomplish this additional work; NOW
THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
P.R. No. 18761
12/2/14 sjp
Page 2 of 3
THAT, the City Manager of the City of Port Arthur is hereby authorized and
directed to execute, on behalf of the City of Port Arthur, Change Order No. 1 (attached
as Exhibit "A") to the contract between the City of Port Arthur and BDS Constructors,
LLC, dba MK Constructors, for the work described therein, increasing the total contract
amount by $5,500.00; and,
THAT, Change Order No. 1 increases the contract amount to a new total of
$172,919.00; and,
THAT, the Change Order No. 1 will be funded by Project No. GO-805,
Account No. 301-1601-591.84-00, subject to a budget adjustment; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of
the City Council.
READ, ADOPTED AND APPROVED THIS day of
2014 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the
following vote:
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince
Mayor
P.R. No. 18761
12/2/14 sjp
Page 3 of 3
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Valecia Tizey./
City Secretary City Attorney
APPROVED FOR ADMINISTRATION:
CM1 (id
John A. Comeaux, P.E. Shawna Tubbs, CPPO, CPPB
Interim City Manager Purchasing Manager
an Polka, .E.
Director of Public Works/City Engineer
APPROVED AS TO AVAILABILTIY OF FUNDS:
AL,,./aLg,
Deborah Echols, CPA
Director of Finance
Project No. GO-805
Account No. 301-1601-591.84-00
EXHIBIT "A"
P.R. No. 18761
yr
SOUTEX
SURVEYORS£rENGINEERS
CHANGE ORDER No. 1
DATE: November 19,2014 SOUTEX PROJECT NO. 13-0646
AGREEMENT DATE: September 2, 2014
NAME OF PROJECT: Repair of 66"Diameter Storm Sewer on Shreveport Avenue
Between Procter Street and 5th Street,Port Arthur,Texas
OWNER: CITY of PORT ARTHUR
CONTRACTOR: BDS Constructors LLC dba MK Constructors
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following items to the Contract and Scope of Work:
• Remove approximately 25'of old cast iron 8"water line in alley between
Procter and 5th Streets west of Shreveport.
• Make tie-in to existing 8" cast iron water line.
• Install new fittings,valve with valve box and cover,restraints on all mechanical
joints,install approximately 25'of new 8"PVC C-900 water line and make tie-
in to the new 8"water line that is part of this project. Work includes concrete
sawed, concrete removal,back fill and surface replacement.
• This work is done under the direction of the City of Port Arthur water
department.
Total $5,500.00
1 of 2
1
CHANGE ORDER No.
OUTEX SOUTEX PROJECT 19, 2014
ROJECT No. 13-0646
SURVEYORS&ENGINEERS
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $167,419.00
CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $167,419.00
The CONTRACT PRICE due to this CHANGE ORDER will be(increased/decreased)by:
$5,500.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be: $172,919.00
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 120 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 120 Calendar Days
CURRENT DATE OF COMPLETION: March 2, 2015
CONTRACT TIME due to this CHANGE ORDER will be increased by: 0 Days
The New DATE OF COMPLETION: March 2,2015
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY SO UTEX: ACCEPTED BY:
e
�atl�u��,_
"` SO SURVEY*RS& ENGIN E" DBS CONSTRUCTORS LLC
DBA MK CONSTRUCTORS
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2