Loading...
HomeMy WebLinkAboutPR 14297:EXCAVATORS & CONST.interoffice MEMORANDUM To~ From: Date: Subject: Mayor, City Council, City Manager Floyd Batiste, CEO July 26, 2007 P. R. No. 14297; Council Meeting of July 31, 2007 Attached is P. R. No. 14297 as it pertains to authorizing the City of Port Arthur Section 4A Economic Development Corporation's CEO to execute Change Order No. 1 to the contract between the City of Port Arthur Section 4A Economic Development Corporation and Excavators & Constructors, Ltd. for construction of the Jade Avenue Extension, increasing the contract amount by $835.49 to a new total of $246,295.34 and to execute a Certificate of Acceptance for the Jade Avenue Extension Project. This was approved by the PAEDC Board of Directors at their July 25, 2007 regular meeting. The streets in the Spur 93 Business Park have not yet been accepted by the City; however, we expect to have this resolution presented at the next Council Meeting. z.pr14297 P.R. No. 14297 7/27/2007 gt RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC DEVELOPMENT CORPORATION'S CEO TO EXECUTE CHANGE ORDER NO. 01 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC DEVELOPMENT CORPORATION AND EXCAVATORS & CONSTRUCTORS, LTD FOR CONSTRUCTION OF THE JADE AVENUE EXTENSION, INCREASING THE CONTRACT AMOUNT BY $835.49 TO A NEW TOTAL OF $246,295.34 AND TO EXECUTE A CERTIFICATE OF ACCEPTANCE WHEREAS, on April 5, 2007, the Port Arthur Section 4A Economic Development Corporation entered into a contract with Excavators & Constructors, Ltd, for construction of the Jade Avenue Extension inside the Business Park in the amount of $245,459.85; and WHEREAS, the Project Engineer has recommended the approval of Change Order No. 01 in the amount of $835.49 and for an extension of twenty-seven (27) days attached hereto as Exhibit "A", which increases the scope of work Excavators & Constructors, Ltd contracted for by adding a sanitary sewer manhole and sewer line at Triangle Waste Solutions and for steel pipe increase from delayed Notice To Proceed; and WHEREAS, the check in the amount of $10,688.17 from Triangle Waste Solutions attached hereto as Exhibit "B" for the construction of the sanitary sewer manhole and sewer line at Triangle Waste Solutions; and WHEREAS, approval of Change Order No. 01 in the amount of $835.49 and the extension of 27 days, increasing the contract to a new amount of $246,295.34 and to a new term of 87 days, is herein deemed an appropriate action; and z,pr14297 WHEREAS, Excavators & Constructors, Ltd, has completed the Jade Avenue Extension Project and desires that the Port Arthur Section 4A Economic Development Corporation accept the Jade Avenue Extension to the Spur 93 Business Park; and WHEREAS, the Port Arthur Section 4A Economic Development Corporation has received an Engineer's Certificate of Completion dated July 20, 2007 (attached hereto as Exhibit "C"), Contractor's Certificate of Guarantee (one year warranty) dated July 19, 2007 (attached hereto as Exhibit "D"), a Contractor's Certificate and Release (attached hereto as Exhibit "E") and Final Pay Estimate No. 4 (attached hereto as Exhibit "F") certifying that the project has been completed; and WHEREAS, representatives from the Public Works Department and Utility Operation's Depaxhnent have inspected the completed roadway and drainage; and WHEREAS, the EDC Board of Directors have approved the final payment and change order. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct. THAT, the final payment and Change Order No. 01 is herein approved and the City of Port Arthur Section 4A Economic Development Corporation's CEO is authorized to execute Change Order No. 01. THAT, the City of Port Arthur Section 4A Economic Development Corporation's CEO is hereby authorized to execute a Certificate of Acceptance as denoted in Exhibit "G" for ownership and maintenance of the street and drainage structures in the Jade Avenue Extension Project, and is authorized to issue final payment. THAT, a copy of the caption of this Resolution be spread upon the Minute of the City Council. z.pr14297 READ, ADOPTED AND APPROVED ON THE __ day of A.D. 2007, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor City Council: NOES: DELORIS "BOBBLE" PR1NCE, MAYOR Attest: EVANGELINE GREEN, CITY SECRETARY APPR_OV~D AS TO F~RM: MARK T' S OKOL/O~ ~J~RN~E~ ~ APPROVED AS TO THE AVAILABILITY OF FUNDS: REBECCA UNDERHILL DIRECTOR OF FINANCE z.prl4297 EXHIBIT ~'A~ Excavators & Cottstractors, Ltd. 8869 S. tlwy 69 Port Arthur; TX 77640 I'hmte: (409.) 721-6030 Ira.v: (409} 721-6037 May 14, 2007 Arceneaux & Gates 3501 Turtle Creek Drive, Suite 102 Port Arthur, TX 776zl2 All,l: Mr. Joe Wilson~ I'.E. Ref: .,lade Average Extensio,t Dear Mr. Wilson, As previously discussed, due to delays fi'om bid date to notice to proceed, we have been notified that some material costs bare increased. Original quotations R>r paving baskets, and ,'e-info,'ce, nent, were effective for 60 days Ii'mn bid date, Febrnary 6, 2007, and subject to change thereafter. Enclosed m:e copies of quotes that reflect an increuse ot'$951.73 in cnst. Ao additional mark-up ot' 15%, as allowed, generates a total of $1,094.49. l'lease prepare, and approve, a change order lo cover lhis addilion. Sincerely, //. M.~ton C4wner CHANGE ORDER NO. 1 July 19, 2007 Job No. EDC-030, Contract No. t CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $245.459.8fi CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $245.459.~5 The CONTRACT PRICE due to this CHANGE ORDER will be [increased] by: $855.49 Dollars The new CONTRACT PRICE, including this CHANGE ORDER, will be $246.295.34 CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 60 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 60 Calendar Days CURRENT DATE OF COMPLETION: June 28.2007 . CONTRACT TIME due to this CHANGE ORDER will be increased by :~? O~YI~ The New DATE OF COMPLETION: dulv 25. 2007 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY ENGINEER: ACCEPTED BY: Excavators & Constructore, Ltd. ACCEPTED BY: PORT ARTHUR ECONOMIC DEVELOPMENT CORP. 2 of 2 CHANGE ORDER No. 1 DATE: July 20, 2007 JOB NO. EDC-030, Cona'act No. I AGREEMENT DATE: Avril 5. 2007 NAME OF PROJECT: JADE AVENUE EXTENSION OWNER: PORT ARTHUR ECONOMIC DEVELOPMENT CORP. CONTRACTOR: .EXCAVATORS & CONSTRUCTORS, LTD. The following changes are hereby made to the CONTRACT DOCUMENTS: I. Adjust the following Base Bid Items to reflect actual quantities used. a. Bid Item No. 3, decrease quantity by 0.3 STA. [-] $ (728.40) b. Bid Item No. 4, decrease quantity by 183 S,Y. [-] $ ¢8.170.95) c. Bid Item No. 5 decrease quantity by 136 S.Y. [-] ~ (136.00) d. Bid Item No. 6 decrease quantity by 136 S.Y.. [-] $ ¢544.00) e, Bid Ilem No. 7 decrease quantity by 5,45 TON [-] $ (784.80) f. Bid Item No. 8 increase quantity by 60 L.F. [+] $ 231.00 g. Bid Item No. 9 decrease quantity by 28 L.F. [-] ~ (107.80) h. Bid Item No. t0 decrease quantity by 23 S.Y. [-] $ (747.~0) i. Bid Item No. 13 decrease quantity by 3 L.F. [-] $ (206.85) j. Bid Item No. 18 decrease quantity by 1 L.S. [-] $ (450.00) 2. Adjust the following Supplemental Items to reflect actual quantities. a. Bid Item No. 19 decrease quantity by 500 LB. b. Bid Item No. 20 decrease quantity by 2,5 C.Y. c. Bid Item No. 21 increase quantity by 64,3 C,Y. Add the following Items. a. Sanitary sewer manhole and sewer line at Triangle Waste I EA. b. Steel price increase from delayed Notice To Proceed 1 L.S. [-] $ (375.00) [-] $ {375.00) [+] $ 2.636.30 [+] $ 9.500.00 [+] ~ 1,094,49 TOTAL ~ 835.49 Triangle Waste Manhole Jade Ave Extn. Manhole Estimate Detail Provide sanitary sewer Mahole to Trian, lewaste 1000 South Bus. ITEM DESCRIPTION Unit Cluanti~ Unit Price .Total ' SDR-26 Pine 4" LF 0.76 0.00 8" LF 2.72 0.00 10" LF 5.00 0.00 12" LF 5.64 0.00 18" LF 11.14 0.00 6" C900 FM LF 1.99 0.00 Manhole - 4' EA 668.80 0.00 Manhole - 6' EA 840.70 0.00 Manhole - 8' EA 876.60 0.00 Manhole - 10' EA 1025.50 0.00 Manhole- 12' EA 1 1013.00 1,013.00 Ring & cover EA 1 175.71 175.71 DDT ditch bore LS Hwy bore LS Lift Station LS Average depth FT Backfill - pipe zone LF 4.00 0.00 Backfill - street LF -7.50 0.00 Backfill - open area LF -1.11 0.00 'Asphalt Pavement SY 25.00 0.00 C..._oncrete Pavement SY 50.00 0.00 4" Sewer Tap EA 300.00 0.0( Material Total $1~188.71 Rental equipment Labor & Eq. (Excavator) Days 1 9500.00 9,500.00 Subtotal $10,688.71 Contingencies 10% 0.00 Engineering 12% 10,688.71 0.00 Grand Total $10,688.71 I page 30-May-07 ,~?~v'~ ?;z~ .... , EXHIBIT '7/15/2007' PAY TO THE $ 10,688. ORDEROF Ecoi~OmicDevelopmentCenter ' **' 71 Ei Ei brand 711100 ........................... ~ ..... * ............................* ...... DOLLARS Ten Thousand Six Hundred ghty- g Economic Development: Center MEMO TRIANGLE WASTE SOLUTIONS LP Economic Development Center 1875. Triangle Waste Properties Provide Sanitary Sewer Manhole 7/15/2007 12636 10,688.71 Texas State Bank 10,688.71 EXHIBIT & GATES ARCENEAUX & GATES Consulting Engineers, Inc. Engineers * Surveyors · Planners Mr. Floyd Batiste, CEO PORT ARTHUR E.D.C. P.O. Box 3934 Port Arthur, Texas 77641 July 20, 2007 RECOMMENDATION for FINAl. PA YMBNT ;nd REI. EA~E of RETAINAGE JADE AVENUE EXTENSION TO SERVE THE CITY OF PORT ARTHUR Job No. EDC.030 Dear Mr. Batiste: Attached for your records are the project completion documents for the Jade Avenue Exension Project. These documents include the Engineer's Certificate of Completion, Contractor's Certificate of Guarantee and the Contractor's Certificate of Release. These documents were executed showing a balance due the Contractor from the Port Arthur Economic Development Corp. This balance is the retainage withheld from the monthly estimates as well *as any .payments due from completion of work. As stipulated in the contract documents the retainage for this project is five percent (5%) of the work completed and billed. It is our recommendation that the. retainage held by the Port Arthur Economic Development Corp. be released to the Contractor and final payment made. This will result in a final payment to EXCAVATORS & CONSTRUCTORS, LTD. from the Port Arthur Economic Development Corp. in the amount of TWENTY THREE THOUSAND FOUR HUNDRED FIFTY THREE Dollars and Ninety Eight Cents ($23,453.98). Should you have any questions or require further information please do not hesitate to contact me at 409-724- 7888. Sincerely, One Turtle Creek Saua~e 3501 Turtle Creek Dr., Suite 102 Port Arthur, TX 77642 409/724-7888 FAX 409/724-1447 CONTRACT FOR CONSTRUCTION OF JADE AVENUE EXTENSION TO SERVE PORT ARTHUR ECOMONIC DEVELOPMENT CORPORATION OWNER: Port Arthur EDC 4173 39th Street P.O. Box 3934 Port Arthur, Texas 77641 CONTRACTOR: Excavators & Constructors, Ltd. 8869 S. Hwy 69 Port Arthur, Texas 77640 A&G Job No. A&G Construction Phase NO. Monthly Estimate No. Contract Amount Change Order No. 1 Total Contract Amount to Date: Amount Pieced to Date: Material on Hand Not in Place: Subtotal: Less 0% Retainage: Balance: Less Amounts on [*] EDC-030 EDC-031 and FINAL $ 245,459.85 $ 835.49 246,295.34 246,295.34 246,295.34 246,295.34 Date: Estimate Period: Contract Date: Notice to Proceed: Contract Time: Approved Time Extensions: Revised Contract Time: Days to Date: Original Completion Date: Revised Completion Date: Percent Time Used: Percent Complete: Previous Estimates: TOTAL AMOUNT DUE THIS ESTIMATE Recommended for Approval: $ 222,841.36 $ 23,453.98 '~ /~/)~ -/-ZO-o7 July 20, 2007 7/13/2007 7/~0/2007 April 5, 2007 April 30, 2007 60 Calendar Days 27 Days 87 Calendar Days 82 Days June 28, 2007 July 25, 2007 94% 100% ENGINEER~8 CERTIFICATE OF COMPLETION Project: JADE AVENUE EXTENSION Date Of Issuance: Owner(s): JULY 20, 2007 PORT ARTHUR ECONOMIC DEVELOPMENT CORP. Owner's Project No.: Engineer: Contractor: EDC-030, Contract No. 1 ARCENEAUX & GATES CONSULTING ENGINEERS, [NC. EXCAVATORS & CONSTRUCTORS, [NC. This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO PORT, ARTHUR ECONOMIC DEVELOPMENT CORP. [OWNER] AND TO EXCAVATORS & CONSTRUCTORS, INC. [CON'~RACTOR] The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on Executed by Engineer on OATE OF CO/JPLETION '~o[~ 20 .2007 BY~R$, IllC, [S~L] 1/I EXHIBIT CONTRACTOR'8 CERTIFICATE OF GUARANTEE FROM: TO: EXCAVATORS & CONSTRUCTORS. LTD PORT ARTHUR ECONOMIC DEVELOPMENT CORP. FOR: JADE AVENUE EXTENSION REFERENCE CONTRACT NO. EDC-030, Contract No. I APRIL, 2007 AND OF FOR: ENTERED INTO THE 5TM DAY OF BETWEEN THE PORT ARTHUR ECONOMIC DEVELOPMENT CORP. EXCAVATORS & CONSTRUCTORS, LTD PORT ARTHUR, TEXAS JADE AVENUE EXTENSION KNOW ALL MEN BY THESE PRESENT~: 1. EXCAVATORS & CONSTRUCTORS. LTD. does hereby guarantee all of the work done under the above referenced contract to be fxee from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear; and agrees to replace or re- execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such required replacement or re-execution. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. This Certificate is given in connection of the final payment under the contract between the Owner and EXCAVATORS & CONSTRUCTORS, LTD and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the troth of the matter contained in this affidavit. 1/2 of IN WITNESS WHEREOF, the tmdersigned has signed and sealed this instrument this Iq day ~ l,, 20 07. / [CORPORATE SEAL] EXCAVATORS& CONSTRUCTORS, LTD (~ntmetor) BY: · being first duly sworn on oath, deposes and says, first that second, that he has read the foregoing certificate by him subscribed as Subscribed and swom to before me this 2o0~1 of EXCAVATORS & CONSTRUCTORS, LTD Affiant further states that the matters and tlfings stated herein are tree. Iq.g` day of ~q (Affiant) My commission expires (Not~ty Pub~) 2/2 EXHIBIT CONTRACTOR'S CERTIFICATE AND RELEASE FROM: EXCAVATORS & CONSTRUCTORS, LTD. (Name dCon~actoO TO: PORT ECONOMIC DEVELOPMENT CORPORATION REFERENCE CONTRACT NO. EDC-030. Contract No. 1 ENTERED INTO THE 5t~ DAY OF APRIL, 2007 , BETWEEN THE PORT ECONOMIC DEVELOPMENT CORPORATION EXCAVATORS & CONSTRUCTORS, LTD. (~m ~ con~otoO OF PORT ARTHUR, TEXAS (c~) (stm) FOR THE JADE AVENUE EXTENSION KNOW ALL MEN BY THESE PRESENTS: The undersigned hereby certifies that there is due t~om, and payable by, the Owner to the Contractor under the contract and duly approved Change Orders and modifications the balance of TWENTY-THREE THOUSAND FOUR HUNORED FIFTY THREE and 98/100 ($23.455.98~ The undersigned further certifies that in addition to the amount set forth in Paragraph 1, there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: (a) None (b) None None (d) None (ltemizo claims and amounts due) ~fnone, so s~te) The undersigned further certifies that all work required under this contract, including work required under ChangeOrder(s)numbered 1 , has been performed in accordance with the terms thereof, and that there are no unpaid claims for materials, supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising om of the performance of this contract, and that the wage rates paid by the Cuntractor were in conformity with the contract provisions relating to said wage rates. hereof, he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof, and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this I~ . day of ~l~ ,2007. [Or. ALl BY: EXCAVATORS & CONSTRUCTORS. LTD. (Con~ct~) (S~;n~r*a~iO~ce~' - he is the fftle) ~lanm of Company) second, that he has read the foregoing certificate by him subscribed as · being first duly sworn on oath, deposes and says, first, that of EXCAVATORS & CONSTRUCTORS, LTD . of EXCAVATORS & CONSTRUCTORS, LTD ~lmne of Company) Subscribed and sworn to before me this :ooq Affiant further states that lhe matters and things stated herein are true. My commission expkes (Date) EXHIBIT "F" MONTHLY ESTIMATE NO, 4 and FINAL JADE AVENUE EXTENSION A&G Job No. EDC-030 2007 Quantity Total Item Description of Bid Item Approx. Unit This Quanlity Unit Amount This Total Amount QTY Estimate To Date Price Estimate TO Date Base Bid Itema 1. Mobilization 1 L.S. I $ 9,000.00 $ $ 9,000.00 2. Clearing and Gabbing I L.S, 1 $ 12,200.00 $ $ 12,200,00 3. Reedway Excavation2 6 STA. 5 $ 2,428.00 $ $ 12,140.00 4. 8, Pavement:~ 2617 SY. 2617 $ 44.85 $ $ 116,849105 5. Coml3acied Subgrade z 2889 SY. 2889 $ 1.00 $ $ 2,889.00 6. Maniputatlon of Lime ~ 2889 SY. 2889 $ 4.00 $ $ 11,558.00 7. Urne for Ststfilizallon z 60.95 TON 60.8§ $ 144.00 $ $ 8,719.20 8. B, Curb2 935 LF. 60 935 $ 3.85 $ 231,00 $ 3,509.75 9, Laydl3wn Curbz 0 L.F. 0 $ 3.85 $ $ 10. 4-Sidewalkz 227 SY. 227 $ 32.50 $ $ 7,377.50 11, Type"C'Maobole 1 EA 1 $ t,650.00 $ $ t,650.00 12. Type"C" Inlet 2 EA 2 $ 2,040.00 $ $ 4,080.00 13. 24" Reinforced Con,ate Pipe 2 589 LF. 589 $ 68.95 $ $ 40,611.55 14. Demo 24" Relnfomed Concrete Pipe 125 LF. 125 $ 2.70 $ $ 337.60 15. Dema 8" Sanitary Sewer Svo. 1 EA 1 $ 256.00 $ $ 256.00 16. Extend Dralnege Swale 24 L.F. 24 $ 4.75 $ $ t14.00 t7. Seeding 1 L.S. 1 I $ 900.00 $ 900,00 $ 800.00 18. Relocate Electrical Conduit 2 0 L.S. 0 $ 450.00 $ $ 19. Ex'Ira Reinforcing Steel ~ 0 LB 0 $ 0.75 $ $ 20. Exlm Clas~"A" Concrete 1.2 2.5 C.Y. 2.5 ; $ 150.00 $ $ 375.00 21. Cement-q~,ht,~,~ Sand ~,z 74.3 C.Y. 74.3 $ 4t.00 $ $ 3,046.30 ~" ': c~""ge o~der~ 22. Change Order No. 1 Sanitary Sewer Manhole 1 EA I 1 $ 9,500.00 $ g,50D.00 $ 6,500.00 SteelPrlcelncmase t L$. I 1 $ 1,094.49 $ 1,094.49 $ 1,094.49 TOTAL $ 11,725,49 $ 246,295.34 ~. ~'his item wes/n~re~ by:Engineer due to relocalion of ex!sting water line. 2. i~m quantities modified bY CHANGE ORDER NO. ~t EXHIBIT CERTIFICATE OF ACCEPTANCE FOR Ownership of Street Improvements and Drainage Structures IN THE CITY OF PORT ARTHUR SECTION 4A ECONOMIC DEVELOPMENT CORPORATION TO: Excavators & Constructors, Ltd This is to certify that the City of Port Arthur Section 4A Economic Development Corporation, accepts the completion of Jade Avenue Street extension and drainage structures on the basis of the Engineer's Certificate of Completion as executed by Arceneaux & Gates Consulting Engineers, Inc.; and the Contractor's Certificate of Guarantee and Contractor's Certificate and Release, both as executed by M. J. Braxton of Excavators & Constructors, Ltd. FLOYD BATISTE CEO OF EDC Attest: City Secretary