Loading...
HomeMy WebLinkAboutPR 18816: ACCEPTANCE OF THE ENGINEER'S CERTIFICATE OF COMPLETION MEMORANDUM CITY OF PORT ARTHUR PUBLIC WORKS - ENGINEERING DIVISION TO: Brian McDougal, City Manager FROM: Susan Polka, P.E., Public Works Director/City Engineer DATE: February 10, 2015 RE: Proposed Resolution No. 18816 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 18816 accepting certain contract documents from BDS Constructors, LLC, dba MK Constructors, for the 66-inch storm sewer repairs on Shreveport Avenue between Procter Street and 5th Street, authorizing the City Manager to sign the Certificate of Acceptance for the project, and making final payment to the Contractor. BACKGROUND On April 29, 2014, the City Council approved Resolution No. 14-395, authorizing a contract with BDS Constructors, LLC, dba MK Constructors, of Vidor, Texas, for the repair of the 66-inch reinforced concrete storm sewer in Shreveport Avenue, in the total amount of $167,419.00. Work on the project was complete on January 26, 2015. BDS Constructors, LLC, dba MK Constructors and Soutex Surveyors & Engineers have submitted all necessary documents to close the project out, including final payment of $146,118.80. The final payment is less than the original contract amount due to savings realized during construction of the project. BUDGET/FISCAL EFFECT Funding for this particular project is provided in Capital Project No. GO-805, Account Number 301-1601-591.84-00. SUMMARY I recommend that the City Council approve Proposed Resolution No. 18816. P.R. No. 18816 2/11/15 sjp RESOLUTION NO. A RESOLUTION AUTHORIZING ACCEPTANCE OF THE ENGINEER'S CERTIFICATE OF COMPLETION, CONTRACTOR'S CERTIFICATE AND RELEASE, AND CONTRACTOR'S CERTIFICATE OF GUARANTEE FOR THE 66-INCH STORM SEWER REPAIRS ON SHREVEPORT AVENUE AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS, AND TO MAKE FINAL PAYMENT TO THE CONTRACTOR. CAPITAL PROJECT NO. GO-805, ACCOUNT NO. 301-1601-591.84-00. WHEREAS, the City of Port Arthur has received for the 66-inch storm sewer repairs on Shreveport Avenue an Engineer's Certificate of Completion dated January 26, 2015, from Stanley G. Newsome, P.E., of Soutex Surveyors & Engineers (attached as Exhibit "A"); a Contractor's Certificate and Release dated February 2, 2015, from BDS Constructors, LLC, dba MK Constructors (attached as Exhibit "B"); a Contractor's Certificate of Guarantee dated February 2, 2015, from Excavators and Constructors, LTD (attached as Exhibit "C") all certifying that the 66-inch storm sewer repairs on Shreveport Avenue have been completed; and, WHEREAS, Exhibit "C" shows a FINAL balance due to BDS Constructor, LLC, dba MK Constructors in the amount of$146,118.80; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: P.R. No. 18816 2/11/15 sjp Page 2 of 3 THAT, the City Manager is hereby authorized to execute, on behalf of the City of Port Arthur, a Certificate of Acceptance for BDS Constructors, LLC, dba MK Constructors for the 66-inch storm sewer repairs on Shreveport Avenue, attached as Exhibit"D"; and THAT, payment shall be made to BDS Constructors, LLC, dba MK Constructors in the amount of$146,118.80; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of 2015 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor P.R. No. 18816 2/11/15 sjp Page 3 of 3 ATTEST: APPROVED AS TO FORM: GVH :144D Sherri Bellard Valecia Tize City Secretary City Attorney APPROVED FOR ADMINISTRATION: LLABrian McDougal Shawna Tubbs, CPPO, CPPB City Manager Purchasing Manager �w - o t E. `--Stisan Polka, .E. Director of Public Works/City Engineer ineer APPROVED AS TO AVAILABILTIY OF FUNDS: de/A44dr-reitVg' Deborah Echols Director of Finance Capital Project No. GO-805,Account No. 301-1601-591.84-00 EXHIBIT "A" P.R. No. 18816 ENGINEER'S CERTIFICATE OF COMPLETION Project: REPAIR OF 66" DIAMETER STORM SEWER ON SHREVEPORT AVENUE BETWEEN PROCTER STREET AND 5TH STREET Date of Issuance: JANUARY 26, 2015 Owner(s): CITY OF PORT ARTHUR Owner's Project No.: Engineer: SOUTEX SURVEYORS &ENGINEERS Contractor: BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO CITY OF PORT ARTHUR (OWNER) AND TO BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (CONTRACTOR) The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on JANUARY 26,2015 DATE OF SUBSTANTIAL COMPLETION Executed by Engineer on / 2' , 2015 •1 • s i► 'fit+ ,NsS ,,,,,,,,,,, N. _„,_ se• 6.1 4.4 oft, 4,00,4131k 0 STA j . NEWS° E,JR., P.E., RRLS . 0 SOU EX SURVEYORS& ENGINEERS 0 1/1 EXHIBIT "B" P.R. No. 18816 CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (NAME OF CONTRACTOR) TO: CITY OF PORT ARTHUR (OWNER) REFERENCE CONTRACT NO. SOUTEX 13-0646 ENTERED INTO THE 2nd DAY OF SEPTEMBER 2014, BETWEEN THE CITY OF PORT ARTHUR AND BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (NAME OF CONTRACTOR) OF VIDOR, TEXAS (CITY) (STATE) FOR: REPAIR OF 66" DIAMETER STORM SEWER ON SHREVEPORT AVENUE BETWEEN PROCTER STREET AND 5TH STREET (NAME OF PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. BDS CONSTRUCTORS, LLC, dba MK CONSTRUCTORS does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free from improper workmanship, and against injury from proper and usual wear;and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials,due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract,as evidenced by the Engineer's Certificate of Completion. 3. This Certificate is given in connection with the final payment under the contract between the Owner and BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. 1 j IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this day of `4,Qfyi,i_a , 20/.S. (CORPORATE SEAL) BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (CONTRACTOR) BYI L-- th (MICHAEL BROWN,VICE PRESIDENT) MICHAEL BROWN ,being first duly sworn on oath,deposes and says,first,that he is the (MICHAEL BROWN) VICE-PRESIDENT of BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (VICE-PRESIDENT) (NAME OF COMPANY) second,that he has read the foregoing certificate by him subscribed as VICE-PRESIDENT (VICE-PRESIDENT) of BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (NAME OF COMPANY) Affiant further states that the matters and things stated herein are true. (MICHAEL BROWN) Subscribed and sworn to before me this td'day of�_P .0_4y , 20/5— . My commission expires S tA42,. ,� o2D/7 U (DATE) ... " ° CONNIE SEAL R STATE aOF TEXAS Poly Comm.Exp.June 22,21117 (NOTARY PUBLIC) 1 .. 2 EXHIBIT "C" P.R. No. 18816 CONTRACTOR'S CERTIFICATE AND RELEASE FROM: BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (NAME OF CONTRACTOR) TO: CITY OF PORT ARTHUR (OWNER) REFERENCE CONTRACT NO. SOUTEX 13-0646 ENTERED INTO THE 2nd DAY OF SEPTEMER, 2014 BETWEEN THE CITY OF PORT ARTHUR AND BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (NAME OF CONTRACTOR) OF VIDOR, TEXAS (CITY) (STATE) REPAIR OF 66" DIAMETER STORM SEWER ON SHREVEPORT AVENUE FOR THE BETWEEN PROCTER STREET AND 5TH STREET (NAME OF PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that there is due from, and payable by, the Owner to the Contractor under the contract and duly approved Change Orders and modifications the balance of $146,118.80 2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: (a) None (b) None (c) None (d) None (ITEMIZE CLAIMS AND AMONTS DUE) (IF NONE,SO STATE) 3. The undersigned further certifies that all work required under this contract, including work required under Change Order(s) numbered ONE , has been performed in accordance with the terms thereof, and that there are no unpaid claims for materials, supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above mentioned contract or any modifications or change thereof. 1 J 5. That in consideration of the payment of the amount stated in Paragraph 1 hereof, the undersigned does hereby release the Owner and Operator from any and all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the Owner;provided,however,that if for any reason the Owner does not pay in full the amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of any amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof,and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this,&&'day of-�-120/5- (SEAL) BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (CONTRACTOR) B L (VICE,PRESIDENT) MICHAEL BROWN ,being first duly sworn on oath,deposes and says,first,that he is the (MICHAEL BROWN) VICE-PRESIDENT of BDS CONSTRUCTORS,LLC dba MK CONSTRUCTORS (VICE-PRESIDENT) (NAME OF COMPANY) second,that he has read the foregoing certificate by him subscribed as VICE-PRESIDENT (VICE-PRESIDENT) of BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS (NAME OF COMPANY) Affiant further states that the matters and things stated herein are true. (MICHAEL BROWN` - Subscribed and sworn to before me this ,nd day of d1Si'1iI/).e 20 LI. My commission expires c�Yr � 020/7 (DATE) ."ce aCONNIIE SEAL •7 ° STATE OF OF ry TEXAS . �i'iY1Lt- ;+ E+<- My Comm.Exp.June 22,2017 (NOTARY PUBLIC) 2 J EXHIBIT "D" P.R. No. 18816 CERTIFICATE OF ACCEPTANCE FOR Repair of 66" Diameter Storm Sewer on Shreveport Avenue Between Procter Street and 5th Street IN THE CITY OF PORT ARTHUR TO: BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS This is to certify that the City of Port Arthur, Texas, accepts the completion of the Repair of Repair of 66" Diameter Storm Sewer on Shreveport Avenue Between Procter Street and 5th Street, on the basis of the Engineer's Certificate of Completion as executed by Stanley G. Newsome, Jr., P.E.; and the Contractor's Certificate of Guarantee and Contractor's Certificate and Release, both executed by BDS Constructors, LLC dba MK Constructors. Brian McDougal, City Manager ATTEST: Sherri Bellard City Secretary 1/1 CERTIFICATE OF ACCEPTANCE FOR Repair of 66" Diameter Storm Sewer on Shreveport Avenue Between Procter Street and 5th Street IN THE CITY OF PORT ARTHUR TO: BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS This is to certify that the City of Port Arthur, Texas, accepts the completion of the Repair of Repair of 66" Diameter Storm Sewer on Shreveport Avenue Between Procter Street and 5th Street, on the basis of the Engineer's Certificate of Completion as executed by Stanley G. Newsome, Jr., P.E.; and the Contractor's Certificate of Guarantee and Contractor's Certificate and Release, both executed by BDS Constructors, LLC dba MK Constructors. Brian McDougal, City Manager ATTEST: Sherri Bellard City Secretary 1/1 CERTIFICATE OF ACCEPTANCE FOR Repair of 66" Diameter Storm Sewer on Shreveport Avenue Between Procter Street and 5th Street IN THE CITY OF PORT ARTHUR TO: BDS CONSTRUCTORS, LLC dba MK CONSTRUCTORS This is to certify that the City of Port Arthur, Texas, accepts the completion of the Repair of Repair of 66" Diameter Storm Sewer on Shreveport Avenue Between Procter Street and 5th Street, on the basis of the Engineer's Certificate of Completion as executed by Stanley G. Newsome, Jr., P.E.; and the Contractor's Certificate of Guarantee and Contractor's Certificate and Release, both executed by BDS Constructors, LLC dba MK Constructors. Brian McDougal, City Manager ATTEST: Sherri Bellard City Secretary 1/1