HomeMy WebLinkAboutPR 18826: CHANGE ORDER NO. 9, ALLCO, L.L.C.; 24" WATERLINE MEMORANDUM
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: Brian McDougal, City Manager
FROM: Jimmie Johnson, Director of Utility Operations
DATE: February 17, 2015
RE: Proposed Resolution No. 18826
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 18826 authorizing
the execution of Change Order No. 9 for the 24" Waterline from 19th Street to the
Sabine Neches Canal Project with ALLCO, L.L.C., of Beaumont, Texas. This change
order is for the installation of two 24" tees, 24" valves, foster adapters and solid sleeves
to serve the proposed Terminal Road Elevated Storage tank project. This change order
will allow there to be water service available for the supply water to the proposed
storage tank once it is constructed. In addition this change order is to remove and
replace an existing fence along Terminal Road in order to install the proposed 24"
waterline. Also, included in this change order is a time extension of 30 days due to this
work not being a part of the original contract. The total cost for this change order will
increase the contract amount $72,972.00.
BACKGROUND
This project will extend a 24" water transmission main from the old Water Purification
Plant to W. 7th Street and SH 82.
BUDGET/FISCAL EFFECT
Pursuant to Resolution No. 12-597, funding for this project will be charged through a
City Account No. 429-1258-532.59-00, Project No. WSI003.
SUMMARY
I recommend that the City Council approve Proposed Resolution No.18826.
P. R. No. 18826
02/17/15 jj
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE CHANGE ORDER NO. 9 BETWEEN THE
CITY OF PORT ARTHUR AND ALLCO, L.L.C.; FOR
THE 24" WATERLINE FROM 19TH STREET TO THE
SABINE NECHES CANAL, IN AN AMOUNT NOT-TO-
EXCEED $72,972.00, INCREASING THE CONTRACT
AMOUNT TO $3,518,973.40, AND A TIME EXTENSION
OF THIRTY (30) DAYS, INCREASING THE CONTRACT
TIME TO 429 DAYS. UTILITY OPERATIONS
ACCOUNT NO. 429-1258-532.59-00, PROJECT NO.
WSI003.
WHEREAS, per Resolution No. 13-503, the City entered into a contract for the
installation of a Waterline from 19th Street to the Sabine Neches Canal, in the amount of
$3,114,960.00,with a contract term of 365 calendar days; and
WHEREAS, per Resolution No. 14-210, Change Order 1 authorized an additional
$40,486.00 to add storm water pollution prevention measures required by the City of Port Arthur
that was not included in the original contract, bringing the contract price for the project to
$3,155,446.00 accepted by Allco; and
WHEREAS, per Resolution No. 14-300, Change Order 2 authorized a credit of
$21,980.00 for the use of 24" Certa-Loc restrained joint C900 PVC pipe in lieu of the 24"
cement lined restrained joint gasket ductile iron pipe in the original bid to a new contract total of
$3,133,466, and a time extension of six (6) days due to inclement weather bring the date of
completion to January 25,2015; and
WHEREAS, per Resolution No. 14-342, Change Order 3 authorized an additional
$12,072.00 for the relocation of an existing 6" waterline that was discovered during construction
on Charleston Ave, the re-route of the 24" waterline to miss an existing storm sewer, and one
foot of extra cover added to the 24" waterline approx. 2,100 L.F. to ensure protection of the line
during the 18th Street construction project to a new contract total of$3,145,538.00, and a time
P. R. No. 18826
02/17/15jj
Page 2 of 4
extension of six (6) days due to inclement weather, bringing the date of completion to January
31, 2015; and,
WHEREAS, per Resolution No. 14-389, Change Order 4, authorized a time extension
of 3 days due to weather delays,to a new completion date of February 3,2015; and,
WHEREAS, per Resolution No. 14-449, Change Order 5, authorized the relocation of
the proposed 24"waterline to avoid an existing structure at the intersection of 18th Street and
Railroad Ave. in the amount not to exceed $53,100.00 to a new contract total of$3,198,638.00
and a time extension of three (3) days due to inclement weather bring the date of completion to
February 6, 2015; and,
WHEREAS,per Resolution No. 14-554, Change Order 6, authorized the relocation of
an existing 12"waterline at Railroad Ave. in the amount not to exceed$52,659.00,and a time
extension of eight(8)days due to inclement weather; and,
WHEREAS, per Resolution No. 14-607, Change Order 7, authorized the performing a
20-inch hot tap on an existing 20-inch waterline on Atlanta Street and an additional 250 feet of
30-inch, DR-11 HDPE of directional drilling in an amount not to exceed$141,090.00, and a time
extension of four(4)days due to inclement weather; and,
WHEREAS,per Resolution No. 14-645, Change Order 8, authorized a time extension of
four (4) days due to weather delays to a new contract time of 399 days and a contract price
increase of$53,614.40 for additional HDPE footage needed to clear the existing underground
structure that was unknown;
WHEREAS, Arceneaux Wilson & Cole LLC, has requested and recommended Change
Order No. 9 increasing the time by thirty (30) days for a new contract time of 429 days with a
new completion date of March 24, 2015, and increasing the contract price to $3,518,973.40 for
the installation of two 24" tees, 24" valves, foster adapters and solid sleeves to serve the
proposed Terminal Road Elevated Storage tank project. This change order will allow there to be
P. R. No. 18826
02/17/15jj
Page 3 of 4
water service available for the supply water to the proposed storage tank once it is constructed.
In addition this change order is to remove and replace an existing fence along Terminal Road in
order to install the proposed 24" waterline; this change order has been evaluated by Arceneaux
Wilson & Cole LLC,and the Utility Operations Department(attached hereto as Exhibit"A").
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to
execute, on behalf of the City of Port Arthur, Change Order No. 9 between the City of Port
Arthur and Allco L.L.C., for the increased time extension of thirty (30) days for a new contract
time of 429 days, with a new completion date of March 24, 2015, and increasing the contract
price by $72,972.00 to a new contract price of$3,518,973.40, attached hereto as Exhibit "A";
and,
THAT a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ,ADOPTED AND APPROVED THIS day of , 2015
at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince
Mayor
P. R. No. 18826
02/17/15jj
Page 4 of 4
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Valecia Tizeno
City Secretary City Attorney
APPROVED FOR ADMINISTRATION:
Brian McDougal Shawna Tubbs, CPPB
City . ager Purchasing Manager
410_
Ji ie Johnson, PhD.
Director of Utilities
APPROVED AS TO AVAILABILITY OF
FUNDS:
AlaitetkZ
Deborah Echols
Director of Finance
Account No.: 429-1258-532.59-00
Project No.: WSI003
Exhibit "A"
(AW&C Change Order No.9)
A
ARCENEAUX WILSON & COLE LLC
Arcencaux Wilson & Cole .F.
AWCEngineering • Surveying • Planning
January 26, 2015
Dr. Jimmie Johnson
Director of Water Utilities
City of Port Arthur
444 Fourth Street
Port Arthur, Texas 77640
RE; PROPOSAL FOR CHANGE ORDER NO. 9
24"WATERLINE FROM 19TH STREET TO THE SABINE-NECHES CANAL
Job No, CPA-650
Dear Mr. Johnson:
Attached is Change Order No. 9 for the 24" Waterline from 19th Street to the Sabine-Neches
Canal. This change order is for the installation of two 24" tees, 24" valves, foster adapters and
solid sleeves to serve the proposed Terminal Road Elevated Storage tank project. This change
order will allow there to be water service available for the supply water to the proposed storage
tank once it is constructed. In addition this change order is to remove and replace an existing
fence along Terminal Road in order to install the proposed 24" waterline. Also, included in this
change order is a time extension of 30 days due to this work not being a part of the original
contract. The total cost for this change order will increase the contract amount $72,972.00. I
recommend that the City of Port Arthur authorize this change to the contract. I have attached
Change Order No. 9 which modifies the contract to reflect this change for your consideration
and action. Should you have any questions or require additional information, please contact our
office.
Very truly yours,
Arceneaux Wilson & Cole LLC
TEXAS REGISTERED ENGINEERING FIRM F-16194
Keestan Cole, PE
Vice-President
(409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642
www.awceng.com
AWC
CHANGE ORDER No. 9
DATE: January 26, 2015 JOB NO. CPA-650
AGREEMENT DATE: November 5, 2013
NAME OF PROJECT: 24" Waterline from 19th Street to the Sabine-Neches Canal
OWNER: CITY of PORT ARTHUR
CONTRACTOR: ALLCO
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following Items to the Contract and Scope of Work:
a. Install 24" Tees, Valves, Foster Adapters, Solid
Sleeve and Caps for the Tie-In at Terminal Road.
[+] $ 69,878.00
b. Install a 6' Wood Fence at residence on Terminal
Road, which was removed due to the 24" Waterline
[+] $ 3,094.00
c. Extend contract time by 30 days
TOTAL $ 72,972.00
�r CHANGE ORDER NO. 9
! - January 26, 2015
AIATCJob No. CPA-650, Contract No. 1
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $3,114,960.00
CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3,446,001.40
The CONTRACT PRICE due to this CHANGE ORDER will be [increased] [decreased]
by: $ 72,972.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be $ 3,518,973.40
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 365 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 34 Calendar Days
CURRENT DATE OF COMPLETION: February 22, 2015
CONTRACT TIME due to this CHANGE ORDER will be increased by 30 Days
The New DATE OF COMPLETION: March 24, 2015
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY ENGINEER: ACCEPTED BY:
ARCENEAUX WILSON & COLE LLC [CONTRACTOR,OFFICER OR'INNER]
ALLCO
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2
ARCENEAUX WILSON & COLE LLC
Arceneaux Wilson & Cole---
AWCEngineering • Surveying • Planning
January 26, 2015
Dr. Jimmie Johnson
Director of Water Utilities
City of Port Arthur
444 Fourth Street
Port Arthur, Texas 77640
RE: PROPOSAL FOR CHANGE ORDER NO, 9
24"WATERLINE FROM 19TH STREET TO THE SABINE-NECHES CANAL
Job No. CPA-650
Dear Mr. Johnson:
Attached is Change Order No. 9 for the 24" Waterline from 19th Street to the Sabine-Neches
Canal. This change order is for the installation of two 24" tees, 24" valves, foster adapters and
solid sleeves to serve the proposed Terminal Road Elevated Storage tank project. This change
order will allow there to be water service available for the supply water to the proposed storage
tank once it is constructed. In addition this change order is to remove and replace an existing
fence along Terminal Road in order to install the proposed 24" waterline. Also, included in this
change order is a time extension of 30 days due to this work not being a part of the original
contract. The total cost for this change order will increase the contract amount $72,972.00. I
recommend that the City of Port Arthur authorize this change to the contract. I have attached
Change Order No. 9 which modifies the contract to reflect this change for your consideration
and action. Should you have any questions or require additional information, please contact our
office.
Very truly yours,
Arceneaux Wilson & Cole LLC
TEXAS REGISTERED ENGINEERING FIRM F-16194
Keestan Cole, PE
Vice-President
(409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642
www.awceng.com
Arcen eauz Wilson & Cole——--
AWC
CHANGE ORDER No. 9
DATE: January 26, 2015 JOB NO. CPA-650
AGREEMENT DATE: November 5, 2013
NAME OF PROJECT: 24" Waterline from 19th Street to the Sabine-Neches Canal
OWNER: CITY of PORT ARTHUR
CONTRACTOR: ALLCO
The following changes are hereby made to the CONTRACT DOCUMENTS:
1. Add the following Items to the Contract and Scope of Work:
a. Install 24" Tees, Valves, Foster Adapters, Solid
Sleeve and Caps for the Tie-In at Terminal Road.
[+] $ 69,878.00
b. Install a 6' Wood Fence at residence on Terminal
Road, which was removed due to the 24" Waterline
[+] $ 3,094.00
c. Extend contract time by 30 days
TOTAL $ 72,972.00
CHANGE ORDER NO. 9
January 26, 2015
AWCJob No. CPA-650, Contract No. 1
CHANGE TO CONTRACT PRICE:
ORIGINAL CONTRACT PRICE: $3,114,960.00
CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $3,446,001.40
The CONTRACT PRICE due to this CHANGE ORDER will be [increased] [decreased]
by: $72,972.00 Dollars
The new CONTRACT PRICE, including this CHANGE ORDER, will be $ 3,518,973.40
CHANGE TO CONTRACT TIME:
ORIGINAL CONTRACT TIME: 365 Calendar Days
CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 34 Calendar Days
CURRENT DATE OF COMPLETION: February 22, 2015
CONTRACT TIME due to this CHANGE ORDER will be increased by 30 Days
The New DATE OF COMPLETION: March 24, 2015
No other Terms and Conditions of the Contract are changed as a result of this Change Order.
Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs
incurred by Contractor in his performance of the work covered by the Change Order.
RECOMMENDED BY ENGINEER: ACCEPTED BY:
ARCENEAUX WILSON & COLE LLC [CONTRACTOR,OFFICER OR OWN ]
ALLCO
ACCEPTED BY:
CITY of PORT ARTHUR
2 of 2