Loading...
HomeMy WebLinkAboutPR 18957: CHANGE ORDER NO. 2 SETEX CONSTRUCTION CORP., IMPROVEMENTS TO LINCOLN PARK, MONTROSE PARK, AND DYON'S PARK P. R. #18957 04/07/15 ca RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 (INCREASING THE TIME BY 11 DAYS) AND CHANGE ORDER NO. 3 (INCREASING THE TIME BY 21 DAYS) TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND SETEX CONSTRUCTION CORP. OF BEAUMONT, TEXAS DUE TO UNFORESEEN WEATHER CONDITIONS, TO A NEW TERM OF 147 DAYS, AT NO ADDITIONAL COST AND TO ACCEPT THE ARCHITECT'S CERTIFICATE OF SUBSTANTIAL COMPLETION FROM THE LABICHE ARCHITECTURAL GROUP, INC. FOR THE IMPROVEMENTS TO LINCOLN PARK, MONTROSE PARK AND LYON'S PARK WHEREAS, per Resolution No. 14-511, the City Council awarded a contract for the improvements to Lincoln Park, Montrose Park and Lyon's Park; and, WHEREAS, the improvements began on October 28, 2014, with a contract time of 85 calendar days and an ending date of February 14, 2015; and, WHEREAS, per Resolution No. 15-041, the City Council awarded Change Order No. 1 to increase the time of the contract by 30 days; WHEREAS, the purchase order issued for the project has a completion date of March 16, 2015; and, WHEREAS, SeTEX Construction Corp. has requested a time extension of 11 calendar days and an additional 21 days to their contract for a delay due to unforeseen weather conditions which caused the area to be muddy; and, the current contract will expire on April 18, 2015; and, WHEREAS, The LaBiche Architectural Group, Inc. has examined the request and recommends proposed Change Order No. 2 in the amount of 11 calendar days and Change Order No. 3 in the amount of 21 days to be added to the contract time for SeTEX Construction Corp., said Change Order No. 2 being attached as Exhibit "A" and Change Order No. 3 being attached as Exhibit"B"; and, P. R. #18957 04/07/15 ca WHEREAS, the new ending date for SeTEX Construction Corp.'s contract would be April 18, 2015; WHEREAS,the improvements to Lincoln Park, Montrose Park and Lyon's Park are now substantially complete/have met all of the required building codes, zoning requirements, inspections, etc., as delineated in the Code of Ordinances of the City of Port Arthur; and, WHEREAS, the City of Port Arthur has been presented a Certificate of Substantial Completion attached hereto as Exhibit"C"; and, WHEREAS, staff recommends to City Council that the City Manager be authorized to accept said Certificate of Substantial Completion as delineated herein; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 2, attached as Exhibit "A" in the amount of 11 calendar days and Change Order No. 3, attached as Exhibit "B" in the amount of 21 calendar days, to the contract between the City of Port Arthur and SeTEX Construction Corp., for the extension of said contract by 32 calendar days, with the new ending date of the contract being April 18, 2015 and execute the Certificate of Substantial Completion in a form approximate to that of Exhibit"C". Section 3. That prior to taking full and final possession of Lincoln Park, Montrose Park and Lyon's Park, all items indicated in the Punch List (incorporated in the Certificate of Substantial Completion) shall be completed by the Contractor, SeTEX Construction Corp. P. R. #18957 04/07/15 ca Section 4. That an authorized representative of SeTEX Construction Corp. shall sign a copy of the resolution agreeing to the terms thereof Section 5. That prior to the release of project retainage monies, the Director of Parks and Recreation must certify to the City Manager that the park improvements are complete and all items listed in the Punch List(incorporated in the Certificate of Substantial Completion) have been finished and the Director of Parks and Recreation must be in receipt of all warranties related to the parks. Section 6. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of A.D., 2015, at a Regular Meeting of the City Council of the City of Port Arthur, by the following vote: AYES:(Mayor) Councilmember: NOES: Deloris "Bobbie" Prince Mayor ATTEST: Sherri Bellard City Secretary P. R. #18957 04/07/15 ca APPROVED AS TO FORM: Val Tizeno, Esq. City Attorney APPROVED AS TO ADMINISTRATION: Brian McDougal City Manager Albert T. Thigpen, CPRP, IPMA-CP, CAS, CPS Director of Parks and Recreation Pk", CL[ ) Shawna Tubbs, CPPO, CPPB Purchasing Manager AGREED TO: SETEX CONSTRUCTION CORP. By: Print Name: Title: EXHIBIT "A" CHANGE ORDER PROJECT: City of Port Arthur Park CHANGE ORDER NO: 2 Improvements (Lincoln, Montrose, & Lion's) CONTRACTOR: SeTEX Construction Corp. DATE: 03.05.15 1660 S. 23rd Street ARCHITECT'S PROJECT NO.: 13049 Beaumont, Texas 77707 CONTRACT DATE: 11.06.14 CONTRACT FOR: Improvements The Contract is changed as follows: Time Extension due to rain/weather (month of February) Total Days: 11 **See attached Contract Time Statement Report#4 from SeTEX** Not valid until signed by the Owner, Architect, and Contractor. The original Contract Sum was $410,000.00 Net change by previously authorized Change Orders $0.00 The Contract Sum prior to this Change Order was $410,000.00 The Contract sum will be increased by this Change Order in the amount of $0.00 The new Contract Sum including this Change Order will be $410,000.00 The Contract Time will be increased by eleven (11) days. The date of Substantial Completion as of the date of this Change Order therefore is March 27, 2015. NOTE: The summary does not reflect changes in the Contract Sum or Contract Time which have been authorized by Construction Change Directive. The LaBiche Architectural Group SeTEX Construction City of Port Arthur 7999 Gladys Avenue, uite 101 1660 S. 23rd Street P.O. Box 1089 Beaumont, x.,s 7 06 Beaumont, Texas 77707 Port Arthur, Texas 77641 By. / ! / J By: 7/k612____ By: Date: /s Date: SI S I ) Date: I co ��Ar N. La.&/00.It .y�I,,� �w:Q �� mn (5);,....1 11592 P ,����OF`:� SETS -44.44.1 CONSTRUCTION CORP. "Strength in Construction" Mailing Address: P.O.Box 20678 Beaumont,Texas 77720-0678 March 3, 2015 Physical Address: 1660 S.23rd Street Beaumont, Texas 77707 Mr. Dohn LaBiche O (409)842-8181 LaBiche Architectural Group, Inc. (409)842-2274 7999 Gladys,Ste., 101 ® setex@setexconstruction.com Beaumont, TX 77706 yr setexconstruction.com General Contracting Project: City of Port Arthur Parks Improvements(Lincoln, Montrose& Lion's Parks) Construction Management Subject: "Contract Time Statement—February 2015" Design-Build Dear Dohn: Job Order Contracting In respect to the above stated project, I have attached our Contract Time Statement for February 2015. We are requesting 11 days time extension for your approval. Please issue a change order as soon as possible. Facilities Maintenance We trust the above meets with your approval accordingly. Commercial Thank you, Industrial SeTEX Construction Corp. Government Nathan Rivers Healthcare President cc: Danny Woods—SeTEX Infrastructure Corporate 21436-Time Stmt 4 Education Performing Arts Historical Established 1990 • PORT ARTHUR PARKS IMPROVEMENTS-LINCOLN,MONTROSE&LION'S PARKS CONTRACT TIME STATEMENT PROJECT City of Port Arthur Parks Improvements REPORT NO. 4 PROJECT NO. 21436 LOCATION Lincoln,Montrose&Lion's Parks CONTRACTOR SeTEX Construction Corp. DATE WORK BEGAN: November 21,2014 DATE TIME COMPUTED FROM 2-1-15 to 2-28-15 DATE DAY LOST REASON FOR EXTENDED DAYS February 1,2015 1 Rain February 2,2015 0 February 3,2015 1 Rain&Too Muddy to Work February 4,2015 1 Rain&Too Muddy to Work February 5,2015 0 February 6,2015 0 February 7,2015 0 February 8,2015 0 February 9,2015 0 February 10,2015 0 February 11,2015 0 February 12,2015 0 February 13,2015 0 February 14,2015 0 February 15,2015 1 Rain February 16,2015 1 Rain&Too Muddy to Work February 17,2015 1 Rain&Too Muddy to Work February 18,2015 0 February 19,2015 0 February 20,2015 0 February 21,2015 1 Rain February 22,2015 0 February 23,2015 1 Rain&Too Muddy to Work February 24,2015 1 Rain&Too Muddy to Work February 25,2015 1 Rain&Too Muddy to Work February 26,2015 0 February 27,2015 0 February 28,2015 1 Rain NUMBER EXTENDED DAYS: 11 NEW COMPLETION DATE: March 27,2015 RECOMMENDED AND APPROVED: OWNER'S REPRESENTATIVE ARCHITECT/ENGINEER re Sruary' Weather for Beaumont, TX I Weather Underground Page 1 of 1 0 Today 0 Forecast February Stets:Precipitation Actual month total 0.99 in Normal Month Total:3.58 in Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 r,,, 2 Q 3 Fill/ 4 ,,,,,, 5 6 cr 7 (r hili /Hi/ dill Actual: 79°153° Actual: 53° 37° Forecast: 46°I 41° Actual: 57°143° Actual: 54°144° Actual: 56°I 41° Actual: 71°I 39° 0.02 in 0.00 in 0.10 in 0.30 in 0.00 in 0.00 in 0.00 in Average: 63°I 44° Average: 63°I 44° Average: 63°I 45° Average: 64°I 45° Average: 64°145° Average: 64° I 45° Average: 64°145° 0.15 in 0.14 in 0.13 in 0.14 in 0.12 in 0.13 in 013 in 8 Cre,) 9 `r' `j 10 �,.,` 11 4.`ti 12 tr'y 13 14 Cf�.. Actual: 76°I 54° Actual: 82°I 55° Actual: 73°I 48° Actual: 74°144° Actual: 67°I 45° Actual: 62°I 40° Actual: 78°I 42° 0.00 in 0.00 in 0.00 in 0.00 in 0.00 in 0.00 in 0.00 in Average: 64°I 45° Average: 64°I 45° Average: 64°I 46° Average: 65°I 46° Average: 65°I 46° Average: 65°146° Average: 65°I 46° 0.14 in 0.13 in 0.13 in 0.13 in 0.13 in 0.13 in 0.13 in 15 r�. .,i 16 N 17 18 19 �20 (f21 (f Actual: 75°I 53° Actual: 70°I 39° Actual: 53°I 33° Actual: 63° I 32° Actual: 59°138° Actual: 70°I 52° Actual: 71° I 65° T in 0.40 in 0.03 in 0.00 in 0.00 in 0.00 in 0.01 in Average: 65°I 47° Average: 65°I 47° Average: 66°I 47° Average: 66°I 47° Average: 66°147° Average: 66°148° Average: 66°I 48° 0.13 in 0.13 in 0.14 in 0.13 in 0.12 in 0.12 in 0.12 in 22 (� `,) 23 24 25 26 27 ( 28 .._ ii Hi,/illii lull hili //iii ii ur /WI Actual: 81°I 45° Actual: 45°I 34° Actual: 46°134° Actual: 48°I 39° Actual: 57°138° Actual: 53°I 37° Actual: 60°139° 0.00 in 0.02 in 0.01 in 0.10 in 0.00 in 0.00 in Tin Average: 67°I 48° Average: 67°I 48° Average: 67°148° Average: 67°I 49° Average: 68°I 49° Average: 68°149° Average: 68°149° 0.12 in 0.12 in 0.12 in 0.12 in 0.11 in 0.12 in 0.12 in Calendar Legend Sunny r-.. Mostly Cloudy Partly Cloudycr,,,ICloudy c- Rain ( Snow zr Clear C ///// *;•: crNN)Hail Flurries c' ` ThunderstormsHazy (Sleet (/` '?'denotes Unknown #.* ;, ' Fog ;;;, ,1/4/2 'chance of http://www.wunderground.com/history/airport/KBPT/2015/2/3/MonthlyCalendar.html?req_city=Port Arthur... 3/3/2015 EXHIBIT "B" CHANGE ORDER PROJECT: City of Port Arthur Park CHANGE ORDER NO: 3 Improvements (Lincoln,Montrose,& Lion's) CONTRACTOR: SeTEX Construction Corp. DATE: 04.06.15 1660 S. 23f'Street ARCHITECT'S PROJECT NO.: 13049 Beaumont,Texas 77707 CONTRACT DATE: 11.06.14 CONTRACT FOR: Improvements The Contract is changed as follows: Time Extension due to rain/weather(month of March) Total Days:21 **See attached Contract Time Statement Report#5 from SeTEX** Not valid until signed by the Owner,Architect,and Contractor. The original Contract Sum was $410,000.00 Net change by previously authorized Change Orders $0.00 The Contract Sum prior to this Change Order was $410,000.00 The Contract sum will be increased by this Change Order in the amount of $0.00 The new Contract Sum including this Change Order will be $410,000.00 The Contract Time will be increased by twenty-one(21) days. The date of Substantial Completion as of the date of this Change Order therefore is April 18, 2015. NOTE: The summary does not reflect changes in the Contract Sum or Contract Time which have been authorized by Construction Change Directive. The LaBiche Architectural Group SeTEX Construction City of Port Arthur 7999 Glad s Ave•u-., •uite 101 1660 S.23`d Street P.O. Box 1089 Beaumon, x. 7 0• Beaumont, Texas 77707 Port Arthur,Texas 77641 By: 1/11141/11 By: ./il .,--/--- - By: Date: ..1Z ,,, /,5. Date: zil j i t 5 Date: l QED 4R .+ EC).c�sa sm 0. 0w '� m " I:e 1592� �+' . I 1 O 1 OF .�� 6 - "Quiiiiiim SETE CONSTRUCTION CORP. "Strength in Construction" Mailing Address: P.O.Box 20678 Beaumont, Texas 77720-0678 March 31, 2015 Physical Address: 1660 S.23's Street Beaumont,Texas 77707 Mr. Dohn LaBiche O (409)842-8181 LaBiche Architectural Group, Inc. di (409)842-2274 7999 Gladys,Ste., 101 A setex@setexconstruction.com ,sa Beaumont,TX 77706 'vim setexconstruction.com General Contracting Project: City of Port Arthur Parks Improvements(Lincoln, Montrose&Lion's Parks) Construction Management Subject: "Contract Time Statement—March 2015" Design-Build Dear Dohn: Job Order Contracting In respect to the above stated project, I have attached our Contract Time Statement for March 2015. We are requesting 21 days time extension for your approval. Please issue a change order as soon as possible. Facilities Maintenance We trust the above meets with your approval accordingly. Commercial Thank you, Industrial SeTEX Construction Corp. fl.12.___ Government ' Nathan Rivers Healthcare President cc: Danny Woods—SeTEX Infrastructure Corporate 21436-Time Stmt 5 Education Performing Arts Historical Established 1990 PORT ARTHUR PARKS IMPROVEMENTS-LINCOLN, MONTROSE&LION'S PARKS CONTRACT TIME STATEMENT PROJECT City of Port Arthur Parks Improvements REPORT NO. 5 PROJECT NO. 21436 LOCATION Lincoln,Montrose&Lion's Parks CONTRACTOR SeTEX Construction Corp. DATE WORK BEGAN: November 21,2014 DATE TIME COMPUTED FROM 3-1-15 to 3-31-15 DATE DAY LOST REASON FOR EXTENDED DAYS March 1,2015 1 Rain March 2,2015 1 Rain&Too Muddy to Work March 3,2015 1 Too Muddy to Work March 4,2015 0 March 5,2015 1 Rain&Too Muddy to Work March 6,2015 1 Too Muddy to Work March 7,2015 0 March 8,2015 1 Rain All Day March 9,2015 1 Rain March 10,2015 1 Too Muddy to Work March 11,2015 1 Rain&Too Muddy to Work March 12,2015 1 Rain All Day March 13,2015 1 Rain&Too Muddy to Work March 14,2015 1 Too Muddy to Work March 15,2015 1 Too Muddy to Work March 16,2015 1 Too Muddy to Work March 17,2015 0 March 18,2015 0 March 19,2015 1 Rain March 20,2015 0 March 21,2015 1 Rain March 22,2015 1 Too Muddy to Work March 23,2015 1 Too Muddy to Work March 24,2015 1 Too Muddy to Work March 25,2015 0 March 26,2015 1 Rain March 27,2015 1 Too Muddy to Work March 28,2015 0 March 29,2015 0 March 30,2015 0 March 31,2015 0 NUMBER EXTENDED DAYS: 21 NEW COMPLETION DATE: April 18,2015 RECOMMENDED AND APPROVED: OWNER'S REPRESENTATIVE ARCHITECT/ENGINEER March Weather for Beaumont, TX I Weather Underground Page 1 of 2 Weather History tor KBPT March Stats:Precipitation Actual month total 8.12 in Normal Month Total:3.53 in ❑ Today ❑ Forecast Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 �4 s 2 C,,, 3 r��-..�,�'`�'j 4 5 6 7 ,, ii ///a //� /r,r/ ///// ////r //iii 72°I 67°I 80°I 81°I 57°I 56°I 63°I Forecast:57. Actual: 53° Actual: 57° Actual: 57° Actual: 36° Actual: 30° Actual: 33° 0.48 in 0.12 in Tin Tin 0.17 in 0.00 in 0.00in 8° 69°I 69°I 69° 69°I 70°I 70°I Average:64Average:50° Average:50° Average:50° Average: 50° Average: Average:Average:51° 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 8 //� /Am 9 4,,/ 10 11 '--rrrr 12 Lrr,-,2 13 (/,,,, 14 /I/// ///// /i/u 1)//1 ///// ///// /Ill, r//,i ///I, Actual: 56° Actual: 65°I 65°I 61°I 65°I Actual: 65°I Actual: 800 50° 52° Actual: 55° Actual: 54° Actual: 56° 580 50° 0.28 in 0.33 in 0.03 in 0.00 in T in 0.32 in 0.19 in 70°I70°I 71°I 71°I Average:51° Average: 51° Average:71°151° Average:71° 51° Average:71°151° Average:52° Average:52° 0.11 in 0.12 in 0.11 in 0.11 in 0.11 in 0.10 in 0.12 in 15 16 �,� 17 �`, 18 burr 19 n 20 r~- 21 yr` (_._.) ///// r//rr /Y%i nr/r ,„,, n // 78°I 81°I 82°I 79°I 81°I 84° I 71°I Actual: 53° Actual: 55° Actual: 59° Actual: 64° Actual: 63° Actual: 64° Actual: 65° 0.00 in 0.00 in 0.00 in 0.01 in T in 0.00 in 6.11 in 72° 72° I 72°I 72° 73°I 73°I 73°I Average:52° Average:52° Average:52° Average:53° Average:530 Average:53° Average:53° 0.11 in 0.11 in 0.10 in 0.11 in 0.11 in 0.11 in 0.11 in C 23 , 22 iir 24 25 rt 26 , 27 ; 28i ir/ it ...- .. ///// r // 78°I 78°I 77°I 79°I 72°I 79°I 80°I Actual: Actual: Actual: Actual: Actual: Actual: Actual: 60° 56° 53° 54° 55° 44° 50° Tin 0.00 in 0.00 in 0.00 in 0.08 in 0.00 in 0.00 in 73°I 73°I74° I 74°I 74°I 74°I 75°1 Average:53° Average:54. Average:54° Average:54° Average:54° Average:54° Average:55° 0.12 in 0.11 in 0.12 in 0.12 in 0.12 in 0.11 in 0.12 in 29 �/30 �� 31 (-`r,..1 0 0 0I Actual: 59° I Actual: 59° Actual: 6z° 0.00 in 0.00 in 0.00 in 0 0 0 Average:75 I Average 75 I Average:75° 55° 55° 55 0.11 in 0.11 in 0.11 in Calendar Legend http://www.wunderground.com/history/ailport/KBPT/2015/3/1/MonthlyCalendar.html?req_... 4/1/2015 March Weather for Beaumont, TX I Weather Underground. Page 1 of 2 Weather History tor KBPT March Stats:Precipitation Actual month total 8.12 in Normal Month Total:3.53 in D Today ❑ Forecast Sunday Monday Tuesday Wednesday Thursday Friday Saturday rrs-s1 ,,.,2 2 ,,,,, 3 4 ,iii 5 ,,,,, 6 7 cm 72°I 67°I 80° I 81°I 57°I 56°I 63°I Forecast: Actual: Actual: Actual: Actual: Actual: Actual: 57° 530 57° 57° 36° 30° 33° 0.48 in 0.12 in T in T in 0.17 in 0.00 in 0.00 in 68°I 69°I 69° I 69° 69°I 70°I 70°I Average:49° Average:SO° Average: 50° Average:SO° Average:50, Average:SO° Average:51° 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in Cr 1 -,I 14 8 ,u„ 9 ,,WW, 10 (n-rrm' 11 0777-1 12 (rr 13 n,,, „n, „u, ,,,,, ,u„ ,,,,, ,n„ 0 Actual: 56°I Actual: 65° 65° I 61°I 65° I Actual: 650 80°0 50° 52° Actual: 55° Actual: 54° Actual: 56° 58° 50° 0.28 in 0.33 in 0.03 in 0.00 in T in 0.32 in 0.19 in Average:70I Average:50°I1° Average:71°151° Average:71°151° Average:71°151° Average 7521°I Average 51 52°I 51° 51 0.11 in 0.12 in 0.11 in 0.11 in 0.11 in 0.10 in 0.12 in 1 ti �� 15 16 C 17 (��.'9 18 `ir7/ 19 C„„I 20 (' 21 78°I 81° I 82°I 79°I 81°I 84° I 71°I Actual: 53° Actual: 55° Actual: 59° Actual: 64° Actual: 63° Actual: 64° Actual: 65° 0.00 in 0.00 in 0.00 in 0.01 in Tin 0.00 in 6.11 in 72°I 72° 72°I 72°I 730 I 73°I 73°I Average:52° Average:52° Average:52° Average: 53° Average:53° Average:53° Average:53° 0.11 in 0.11 in 0.10 in 0.11 in 0.11 in 0.11 in 0.11 in 22 t?rrrii/,' 23 ��� 24 25 tT_ 26 > 27 28 78°I 78°I 77°I 79°I 72°I 79°I 80°I Actual: Actual: Actual: Actual: Actual: Actual: Actual: 60° 56° 530 54° 55° ° 50° T in 0.00 in 0.00 in 0.00 in 0.08 in 0.00 in 0.00 in 73°I 73°I74°I 74°I 74°I 74° I 75°I Average:53° Average:54. Average: 74° Average:54° Average:54° Average 54° Average: 55° 0.12 in 0.11 in 0.12 in 0.12 in 0.12 in 0.11 in 0.12 in 29 C 30 Cr,'7 31 (- 0 0 0I Actual: 59° I Actual: 59° Actual: 6z° 0.00 in 0.00 in 0.00 in 0 0 0 Average:55. 75 Average:75 ( Average:550 55 55° 0.11 in 0.11 in 0.11 in Calendar Legend http://www.wunderground.com/history/airport/KBPT/2015/3/1/MonthlyCalendar.html?req... 4/1/2015 • March Weather for Beaumont, TX I Weather Underground Page 1 of 2 Weather History for KBP1 March Stats:Precipitation Actual month total 8.12 in Normal Month Total:3.53 in ❑ Today 0 Forecast Sunday Monday f� Tuesday Wednesday Thursday�� Friday Saturday 1 , ,1 2 „`'? 3 c 4 iiT; 54r 6 �# 7 ) /1 ui,i ,u,, „/ii 72°I 67°I 80°I 81°I 57°1 56°I 63°I Forecast:57° Actual: 53° Actual: 570 Actual: 57° Actual: 36° Actual: 30° Actual: 330 0.48 in 0.12 in Tin Tin 0.17 in 0.00 in 0.00 in 68° 69°I 69°I 69°1 69°I 70°I 70°I Average:49° Average:50° Average:50° Average:50° Average:50° Average:50° Average: 51° 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 0.12 in 8 (rrrrr 9 ,-- '7-rid C'.',,._ (1--,--) 13 ,n-,1 14 cJ` „ ,- iii,, 11, 10 m-r' 11 `-7-rrn 12 ,,,,1 C_ n,,, ,1111 ,,,u 111,1 1111, uu, u„1 1,,,, //Ill Actual: 5601 Actual: 65°1 65°I 61°I 65°I Actual: 65°I Actual: 80°I 50° 52° Actual: 55° Actual: 54° Actual: 56° 58° 50° 0.28 in 0.33 in 0.03 in 0.00 in T in 0.32 in 0.19 in 0 ° 0 ° Average:51 I Average:51 I Average:71°151° Average:71°151° Average:71°151° Average:52° Average:52° 0.11 in 0.12 in 0.11 in 0.11 in 0.11 in 0.10 in 0.12 in r�-,_ 15 16 ,,- 17 (-1,:-.;-'- i 18 '- 19 11,1, „u, 20 21 1 t3, 111„ ,,,,, 76°1 81°I 82° I 79° I 81°I 84°1 71°I Actual: 53° Actual: 55° Actual: 59° Actual: 64° 63°63° Actual: 64° Actual: 65° 0.00 in 0.00 in 0.00 in 0.01 in T in 0.00 in 6.11 in 72°I 72° I 72°I72°1 73°I 73°I 73°I Average:52° Average:520 Average:52° Average: 53° Average:53° Average: 53° Average:53° 0.11 in 0.11 in 0.10 in 0.11 in 0.11 in 0.11 in 0.11 in 22 <'rcr 23 24 c-':`` 25 r_"- 26 27 28 u,,, „ n 78°I 78°I 77°I 79°I 72°I 79°I 80° Actual: Actual: Actual: Actual: Actual: Actual: Actual: 60° 56° 53° 54° 55° 44° 50° T in 0.00 in 0.00 in 0.00 in 0.08 in 0.00 in 0.00 in 73°1 73°I 74° 1 74°I 74°I 74° 75°I Average:53° Average:54° Average:54° Average:54° Average:54° Average:54° Average:55° 0.12 in 0.11 in 0.12 in 0.12 in 0.12 in 0.11 in 0.12 in 29 30 31 (Tc, 0 0 0 Actual: 59° I Actual: 59°1 Actual: 62° 0.00 in 0.00 in 0.00 in 0 0 Average:75° Average75Average:750 55 55° 55° 0.11 in 0.11 in 0.11 in Calendar Legend http://www.wunderground.com/history/airport/KBPT/2015/3/1/Month lyCalendar.html?req_... 4/1/2015 EXHIBIT "C" • • CERTIFICATE OF SUBSTANTIAL COMPLETION PROJECT: City of Port Arthur LINCOLN PARK PROJECT NO: 13049 ARCHITECT: The LaBiche Architectural Group, Inc. OWNER: City of Port Arthur CONTRACTOR: SeTEX Construction P.O. Box 1089 Port Arthur, Texas 77641 CONTRACT FOR: Renovations DATE OF ISSUANCE: March 23, 2015 CONTRACT DATE: November 06, 2014 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: ALL WORK The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as March 23, 2015 which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents. A list of items to be completed or corrected, prepared by the Contractor and ���mq% verified and amended by the Architect is attached hereto. The failure to include A,9le I. any items on such list does not alter the responsibility of the Contractor to complete ��`�t N La AN all Work in accordance with the Contract Documents. The date of commencement off` C�'� � of warranties for items on the attached list wil se e date of final payment unless $who m'0 10 otherwise agreed to in writing. ce _ *• 44 The LaBiche Architectural Group, Inc. 3 �l�gj''�n.59 2fp ARCHITECT I • DAT /.S 1il1 moo`= The Contractor will complete or correct the Work on the list of items attached hereto within fifteen (15) days from the Date of Substantial Comp! tion. SeTEX Construction 3/7b// CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof at 8:00 a.m. on March 24, 2015. City of Port Arthur OWNER BY DATE The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Owner will assume responsibility for maintenance, security, and damage to the Work on the Date of Substantial Completion except for damage done by Contractor or Subcontractors during final completion. Owner assumes responsibility for insurance of the Project on March 24, 2015. The Contractor will submit to the Owner the executed warranties, maintenance agreements, inspection certificates, record documentation, maintenance manuals, tools, spare parts, keys and similar operational items by April 24, 2015. Dohn H. LaBiche,FAIA-Principal Greg Wall,AIA-Principal The LaBiche 7999 Gladys Avenue, Suite 101 Beaumont,Texas 77706 ARCHITECTURAL GROUP, INC. (409) 860-0197 •Fax(409) 860-0198 March 23, 2015 SETEX Construction, Inc. Mr. Nathan Rivers 1660 S. 23rd Street Beaumont, Texas 77707 Re: Lincoln Park Project# 13049 Dear Mr. Rivers, On Monday, March 23, 2015, an inspection was made of the above-mentioned project for the purpose of compiling a Punch List for Lincoln Park. The following persons were in attendance during the inspection: Dohn LaBiche, FAIA LaBiche Architectural Group, Inc.. Nathan Rivers & Danny Wood SETEX Construction, Inc. Dr Albert Thigpen City of Port Arthur Harriet Collins City of Port Arthur Punch List 1. Remove the security Fence and Port-o-let. 2. Install sod on south side of building where electrical underground was installed. 3. Install missing light poles. 4. Remove construction equipment and debris from site. 5. Add fill along curved sidewalk leading to street. 6. Install ground rods for light poles. 7. Re-stake trees as shown on construction documents. Stakes shall be installed below ground level as shown on landscape details. 8. Sod southeast corner of the site in bare dirt area. End of Punch List 1 of 2 Punch List for Lincoln Park Please correct the above-mentioned item of work by the earliest possible date and notify our office in writing upon their completion. We have established, March 23, 2015 as the Substantial Completion date. Also please submit the required Close-out Documents and Warranties along with Record Drawings and Specifications for approval and transmittal to the owner. If there are questions about any of the items listed please notify my office for clarifications. Sincerely, / , 'i Dohn H. LaBiche, FAIA 2 of 2