HomeMy WebLinkAboutPR 18967: ARCENEAUX WILSON & COLE LLC, CONSTRUCITON PHASE FOR THE 24 INCH WATER LINE City of ort rthu r�� Texas INTEROFFICE MEMORANDUM Office of UTILITY OPERATIONS-ADMINISTRATION Date: April 22, 2015 To: Brian McDougal, City Manager From: Jimmie Johnson, Ph.D., Director of Utility Operation RE: Proposed Resolution No. 18967 Nature of the Request: The City Council authorized an agreement with Sabine Pass Liquefaction, LLC for the construction of various water system improvements. Arceneaux Wilson & Cole LLC began Construction Phase Services for the 24 Inch Water Line from 19th Street to Sabine-Neches Canal. Arceneaux Wilson & Cole LLC has requested an extension of their professional services contract on the 24 Inch Water Line from 19th Street to the Sabine-Neches Canal project, to be extended an additional 270 days to August 28, 2015, for completion and testing of the project. StaffAnalysis, Considerations: Existing staff will monitor the contractor's performance. Recommendation: I recommend that the City Council approve Proposed Resolution No. 18967 authorizing the contract between the City of Port Arthur and Arceneaux Wilson & Cole LLC, of Port Arthur, Texas, for construction Phase Services for the 24 Inch Water Line from 19th Street to Sabine-Neches Canal, be extended an additional 270 days to August 28, 2015. Budget Considerations: None. "Remember we are here to serve the Citizens of Port Arthur" P.O. BOX 1089—PORT ARTHUR, TEXAS 77641-1089—409/983-8101 —FAX 409/982-6743 P.R. No. 18967 4-22-15 JJ RESOLUTION NO. A RESOLUTION AUTHORIZING AN AMENDMENT TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND ARCENEAUX WILSON & COLE LLC, OF PORT ARTHUR, TEXAS, FOR CONSTRUCTION PHASE SERVICES FOR THE 24 INCH WATER LINE FROM 19TH STREET TO SABINE-NECHES CANAL INCREASING THE TERM BY 270 DAYS. WHEREAS, the City of Port Arthur has committed to the construction of various water system improvements; and, WHEREAS, in Resolution 13-394, the City Council of the City of Port Arthur authorized Arceneaux Wilson & Cole LLC, to begin Construction Phase Services for the 24 Inch Water Line from 19th Street to Sabine-Neches Canal in the not to exceed amount of $401,160.00; and, WHEREAS, Arceneaux Wilson & Cole LLC has requested an extension of their professional services contract on the 24 Inch Waterline from 19th St. to the Sabine Neches Canal project; and, WHEREAS, Arceneaux Wilson & Cole LLC has requested that their agreement be extended an additional 270 days to August 28, 2015; and, WHEREAS, the extension of contract time will be necessary for the completion and testing of the project; and, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, P.R. No. 18967 4-22-15 JJ Page 2 of 3 THAT, the extension request of an additional 270 days to August 28, 2015 from Arceneaux Wilson & Cole LLC, of Port Arthur, Texas, is attached hereto as Exhibit "A"; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , A.D. 2015 at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: NOES: Mayor ATTEST: Sherri Bellard City Secretary P.R. No. 18967 4-22-15 JJ Page 3 of 3 APPROVEDDAS TO FORM: 1- r, APIlir 4r_ Va ecia Tize o City Attorney APPROVED FOR ADMINISTRATION: Brian McDougal City Manager AIM Deborah Echols, C.P.A. Director of Finance Jimmie Johnson, Ph.D. Director of Utility Operations Shawna Tubbs, CPPB, CPPO Purchasing Manager P.R. No. 18967 4-22-15 JJ EXHIBIT A {Request for Contract Extension Letter} ARCENEAUX WILSON & COLE LLC Arcencaux Wilson & Cole--- AWCEngineering • Surveying • Planning April 20, 2015 Dr. Jimmie Johnson Director of Water Utilities PO Box 1089 Port Arthur, TX 77641 RE: Request for Contract Extension City of Port Arthur Port, 24 Inch Waterline from 19th St. to the Sabine Neches Canal Dear Jimmie, We are requesting an extension of our professional services contract or the 24 Inch Waterline from 19th St. to the Sabine Neches Canal project (CPA-651). This contract was approved by City Council on September 3, 2013, Resolution 13-394, (attached) with a notice to proceed issued on September 9, 2013. This was a Construction Phase Services contract with a duration of 450 days and expired on December 1, 2014. This this contract was originally issued to Arceneaux and Gates Consulting Engineers Inc. but was assigned to Arceneaux Wilson and Cole LLC by Resolution 14-481 (attached). We are requesting that this agreement be extended an additional 270 days to August 28, 2015. This extension of contract time will be necessary for the completion and testing of the project. Thank you for your consideration in this matter and should have any questions or require additional information please do not hesitate to contact me. Sincerely, Joe M Alison Jr., PE President Attachments: Resolution 14-123 Resolution 14-481 (409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642 www.awceng.com Registered Engineering Firm F-16194 Registered Survey Firm 10194049 ARCENEAUX WILSON & COLE LLC Ar<eneau• Wilson 6 Cole--- AWCEngineering • Surveying • Planning April 20, 2015 Dr. Jimmie Johnson Director of Water Utilities PO Box 1089 Port Arthur, TX 77641 RE: Request for Contract Extension City of Port Arthur Port, 24 Inch Waterline from 19th St. to the Sabine Neches Canal Dear Jimmie, We are requesting an extension of our professional services contract or the 24 Inch Waterline from 19th St. to the Sabine Neches Canal project (CPA-651). This contract was approved by City Council on September 3, 2013, Resolution 13-394, (attached) with a notice to proceed issued on September 9, 2013. This was a Construction Phase Services contract with a duration of 450 days and expired on December 1, 2014. This this contract was originally issued to Arceneaux and Gates Consulting Engineers Inc. but was assigned to Arceneaux Wilson and Cole LLC by Resolution 14-481 (attached). We are requesting that this agreement be extended an additional 270 days to August 28, 2015. This extension of contract time will be necessary for the completion and testing of the project. Thank you for your consideration in this matter and should have any questions or require additional information please do not hesitate to contact me. Sincerely, Joe M ilson Jr., PE President Attachments: Resolution 14-123 Resolution 14-481 (409) 724-7888 • 2901 Turtle Creek Drive • Suite 320 • Port Arthur, Texas 77642 www.awceng.corn Registered Engineering Firm F-16194 Registered Survey Firm 10194049