HomeMy WebLinkAboutPR 18968: THE ENGINEER'S CERTIFICATE OF COMPLETION, FOR KAPRINA FRANK DRIVE MEMORANDUM
CITY OF PORT ARTHUR
PUBLIC WORKS - ENGINEERING DIVISION
TO: Brian McDougal, City Manager p
FROM: Susan Polka, P.E., Public Works Director/City Engineer,\
DATE: April 21, 2015
RE: Proposed Resolution No. 18968
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 18968 accepting
certain contract documents from Excavators and Constructors, LTD, for the Water,
Sanitary Sewer, Paving, Drainage Facilities and Site Grading to serve "Kaprina Frank
Drive", authorizing the City Manager to sign the Certificate of Acceptance for the project,
and making final payment to the Contractor.
BACKGROUND
On July 7, 2014, the Port Arthur Economic Development Commission (PAEDC) Board of
Directors approved a contract with Excavators and Constructors, LTD, of Port Arthur,
Texas, for the installation of sanitary sewer, paving, drainage facilities and site grading
to serve "Kaprina Frank Drive" in the amount of $482,717.95. A change order was
approved increasing the final contract amount to $490,058.35. Work on the project was
completed on March 6, 2014 with the exception of street lights which are provided
under a contract with Entergy. Excavators and Constructors, LTD and Arceneaux Wilson
& Cole LLC have submitted all necessary documents to close the project out, including
final payment of$24,502.91.
BUDGET/FISCAL EFFECT
Funding for this particular project is provided in Economic Development Corporation
Projects Account No. 120-1429-582.86-00.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 18968.
P.R. No. 18968
4/21/15 sjp
RESOLUTION NO.
A RESOLUTION AUTHORIZING ACCEPTANCE OF THE
ENGINEER'S CERTIFICATE OF COMPLETION,
CONTRACTOR'S CERTIFICATE AND RELEASE, AND
CONTRACTOR'S CERTIFICATE OF GUARANTEE FOR THE
WATER, SANITARY SEWER, PAVING, DRAINAGE FACILITIES
AND SITE GRADING FOR KAPRINA FRANK DRIVE AND
AUTHORIZING THE CITY MANAGER TO SIGN THE
CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY
OF PORT ARTHUR, TEXAS, AND TO MAKE FINAL PAYMENT
TO THE CONTRACTOR, EDC ACCOUNT NUMBER 120-1429-
582.86-00.
WHEREAS, the City of Port Arthur has received for the Kaprina Frank Drive
Improvements an Engineer's Certificate of Completion dated March 9, 2015, from
Keestan Cole, P.E., of Arceneaux Wilson & Cole LLC (attached as Exhibit "A"); a
Contractor's Certificate and Release dated March 9, 2015, from Excavators and
Constructors, LTD (attached as Exhibit "B"); a Contractor's Certificate of Guarantee
dated March 9, 2015, from Excavators and Constructors, LTD (attached as Exhibit"C")
all certifying that the Kaprina Frank Drive Improvements have been completed; and,
WHEREAS, Exhibit "B" shows a FINAL balance due to Excavators and
Constructors, LTD in the amount of$24,502.92; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
P.R. No. 18968
4/21/15 sjp
Page 2 of 3
THAT, the City Manager is hereby authorized to execute, on behalf of the City
of Port Arthur, a Certificate of Acceptance for Excavators and Constructors, LTD
Contractors for the Kaprina Frank Drive Improvements, attached as Exhibit"D"; and
THAT, payment shall be made to Excavators and Constructors, LTD in the
amount of$24,502.92; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of
the City Council.
READ, ADOPTED AND APPROVED THIS day of
2015 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the
following vote:
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince
Mayor
P.R. No. 18968
4/21/15 sjp
Page 3 of 3
ATTEST: APPROVED AS TO FORM:
��-�- ./i
Sherri Bellard Valecia Tiz"o
City Secretary City Attorney
APPROVED FOR ADMINISTRATION:
rl
Brian McDougal Shawna Tubbs, CPPO, CPPB
City Manager Purchasing Manager
• san Polka, P.E.
Public Works Director/City Engineer
APPROVED AS TO AVAILABILTIY OF FUNDS:
Od
2aL
Deborah Echols
Director of Finance
Account No. 120-1429-582.86-00
EXHIBIT "A"
P.R. No. 18968
ENGINEER'S CERTIFICATE OF COMPLETION
Project: Water, Sanitary Sewer, Paving, Drainage Facilities and Site Grading to Serve
Proposed "Kaprina Frank Drive"
Date of Issuance: February 11,2015
Owner: City of Port Arthur
Owner's Project No. EDC-180, Contract No. 1
Engineer: Arceneaux Wilson& Cole LLC
Contractor: Excavators and Constructors, LTD
This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to
the following specified parts thereof:
TO City of Port Arthur
[OWNER]
AND TO Excavators and Constructors, LTD
[CONTRACTOR]
The Work to which this Certificate applies has been inspected by authorized representatives of
Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance
with the Contract Documents on
1't6mor /7, 7e/„5"--
DATE O
/SDATED COMPLETION +u.
Executed by Engineer on March 9,2015 .:r�p'1..••••••...4. 2�
*r /\ t **
•KEESTAN.X..COLE r
¢9Q\ 114225 •JQ
BY: t$ j IN . max•..
tttdtv� ...
RCENEAUX WILSON & COLE, LLC [SEAL]
1;l
EXHIBIT "B"
P.R. No. 18968
CONTRACTOR'S CERTIFICATE AND RELEASE
FROM: EXCAVATORS AND CONSTRUCTORS, LTD.
(Name of Contractor)
TO: CITY OF PORT ARTHUR
(Owner)
REFERENCE CONTRACT NO. EDC-180, CONTRACT NO. 1 ENTERED INTO THE 22ND
DAY OF JULY, 2014 , BETWEEN THE CITY OF PORT ARTHUR
AND EXCAVATORS AND CONSTRUCTORS, LTD.
(Name of Contractor)
OF PORT ARTHUR, TEXAS
(City) (State)
FOR THE Water, Sanitary Sewer, Paving, Drainage Facilities and Site Grading to Serve Propose
Kaprina Frank Drive"
(Name of Project)
KNOW ALL MEN BY THESE PRESENTS:
1. The undersigned hereby certifies that there is due from, and payable by, the Owner to the
Contractor under the contract and duly approved Change Orders and modifications the balance of
Twenty Four Thousand Five Hundred Two Dollars and Ninety Two Cents ($ 24,502.92 )
2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1, there are
outstanding and unsettled the following items which he claims are just and due and owing by the
Owner to the Contractor:
(a)
(b)
(Itemize claims and amounts due) (If none,so state)
3. The undersigned further certifies that all work required under this contract, including work required
under Change Order(s)numbered I , has been performed in accordance with the terms
thereof, and that there are no unpaid claims for materials, supplies, or equipment and no claims of
laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the
wage rates paid by the Contractor were in conformity with the contract provisions relating to said
wage rates.
4. Except for the amounts stated under Paragraphs 1 and 2 hereof, the undersigned has received from
the Owner all sums of money payable to the undersigned under, or pursuant to, the above
mentioned contract or any modifications or change thereof.
1
5. That in consideration of the payment of the amount stated in Paragraph 1 hereof, the undersigned
does hereby release the Owner and Operator from any and all claims arising under or by virtue of
this contract, except the amount listed in Paragraph 2 hereof due from the Owner; provided,
however, that if for any reason the Owner does not pay in full the amount stated in Paragraph 1
hereof, said deduction shall not affect the validity of this release, but the amount so deducted shall
be automatically included under Paragraph 2 as an amount which the Contractor has not released
but will release upon payment thereof. The Contractor further certifies that upon the payment of the
amount listed in Paragraph 2 hereof, and of any amount which may be deducted from Paragraph 1
hereof, he will release the Owner and Operator from any and all claims of any nature whatsoever
arising out of said contract or modification thereof, and will execute such further releases or
assurances as the Owner and Operator may request.
IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this a day
of 'Galan ,2015.
[SEAL] EXCAVATORS AND CONSTRUCTORS, LTD.
(Contractor)
BY:
(Signature.y.► ie of.ffic r)
Jay Braxton , being first duly sworn on oath, deposes and says, first, that
(Affiant)
he is the O NV, of EXCAVATORS AND CONSTRUCTORS, LTD.
(Title) (Name of Company)
second,that he has read the foregoing certificate by him subscribed as Ow ne✓
(Title)
of EXCAVATORS AND CONSTRUCTORS, LTD.
(Name of Company)
Affiant further states that the matters and things stated herein are true.
(Affiant)
Subscribed and sworn to before me this 9' day of �� 2015.
My commission expires // / /�
(Date)
;1�•, MELANIE A.THERIOT
;,r,c;1
r NOTARY PUBLIC
;.�1." ;,;•' Stats of Texas
Comm.Exp.11-042018
(Notary Public)
2
EXHIBIT "C"
P.R. No. 18968
CONTRACTOR'S CERTIFICATE OF GUARANTEE
FROM: EXCAVATORS AND CONSTRUCTORS, LTD.
(Name of Contractor)
TO: CITY OF PORT ARTHUR
REFERENCE CONTRACT NO. EDC-180 ENTERED INTO THE 22n1 DAY OF JULY, 2014 BETWEEN THE
CITY OF PORT ARTHUR AND EXCAVATORS AND CONSTRUCTORS, LTD.
OF PORT ARTHUR, TEXAS
(City) (State)
FOR THE Water, Sanitary Sewer, Paving, Drainage Facilities and Site Grading to Serve
Propose Kaprina Frank Drive"
KNOW ALL MEN BY THESE PRESENTS:
1. EXCAVATORS AND CONSTRUCTORS, LTD. does hereby guarantee all of the work done under the
above referenced contract to be free from faulty materials in every particular, and free from improper
workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without
cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good
all damage caused to other work or materials, due to such required replacement or re-execution.
2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this
Contract, as evidenced by the Engineer's Certificate of Completion.
3. This Certificate is given in connection of the final payment under the contract between the Owner and
EXCAVATORS AND CONSTRUCTORS, LTD. and with the knowledge that it will be relied upon in
making such payment and that such payment would not be made except upon the truth of the matter
contained in this affidavit.
IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this CIM day
of Wet 1d'dA , 2015.
[CORPORATE SEAL] EXCAVATORS AND CONSTRUCTORS, LTD.
(Contractor)
BY:
(SIGN o0: ND " LE F FFICER)
1/2
Jay Braxton being first duly sworn on oath, deposes and says, first
that (Affiant)
he is the 0 O S&V of EXCAVATORS AND CONSTRUCTORS, LTD.
(Title) (Name of Company)
second, that he has read the foregoing certificate by him subscribed as
(Title)
of EXCAVATORS AND CONSTRUCTORS, LTD.
(Name of Company)
Affiant further states that the matters and things stated herein are true.
Jay Braxton
(Affiant)
Subscribed and sworn to before me this 9 _day of p�� 2015.
My commission expires: //%7
(Date)
o`>?:A�.. MELANIE A.THERIOT
4), NOTARY PUBLIC
•Q;' State of Texas (Notary Public)
u..• Comm.Exp.11-04-2018
EXHIBIT "D"
P.R. No. 18968
CERTIFICATE OF ACCEPTANCE
FOR
COMPLETION OF WATER, SANITARY SEWER, PAVING,
AND DRAINAGE FACILITIES
TO SERVE KAPRINA FRANK DRIVE
IN THE CITY OF PORT ARTHUR, TEXAS
TO: Excavators and Constructors, LTD
This is to certify that the City of Port Arthur, Texas, accepts the completion
of the water, sanitary sewer, paving and drainage facilities to serve Kaprina
Frank Drive on the basis of the Engineer's Certificate of Completion from
Arceneaux Wilson & Cole LLC, the Contractor's Certificate and Release
and Contractor's Certificate of Guarantee from Excavators and Constructors,
LTD, and the Performance Bond provided to the City by Excavators and
Constructors, LTD.
Brian McDougal
City Manager
AT PEST:
Sherri Bellard, City Secretary