Loading...
HomeMy WebLinkAbout(01) THOMAS BOULEVARDCITY OF PORT ARTHUR, TEXAS PUBLIC WORKS DEPARTMENT MEMORANDUM: TO: Steve Fitzgibbons, City Manager FROM: Leslie E. McMahen, P.E., Director of Public Works DATE: December 14, 2001 SUB.IECT: Thomas Boulevard Repairs In response to Council Member Chaisson's request regarding the status of repairs to Thomas Boulevard, the following is offered: In March and April, 1998 Street crews performed level-ups on extensive sections of Thomas, using Type "D" cold mix asphalt; In December, 1999 Street crews performed level-ups on the sections between 3rd Avenue and 5th Avenue, using Type "D" cold mix asphalt; In .lanuary and February, 2000 Street crews performed level-ups on additional sections of Thomas, using Type "D" cold mix asphalt. We have recently surveyed Thomas Boulevard from Houston Avenue to 9th Avenue and found seventeen (17) areas in which the cold mix asphalt has either become bumpy, or has broken off on the edges, or spalled. Each condition produces a bad ride over the areas in question. We plan to go to each area, saw cut be~;ond the patched areas, remove all asphalt surface material down to the concrete pavement, and overlay the areas with hot mix asphalt, using our HMAC contractor. This work can be done as long as the air and pavement temperature will allow us to do it, and we will make every effort to do it as soon as possible.