HomeMy WebLinkAboutPR 18997: EDC INSTALLATION OF A PROJECTION SCREEN FOR THE 501 PROCTER BUILDING DELORIS"BOBBIE"PRINCE,MAYOR BRIAN MCDOUGAL
KAPRINA RICHARDSON FRANK,MAYOR PRO TEMCtry of .: CITY MANAGER
COUNCIL MEMBERS: c _ SHERRI BELLARD,TMRC
RAYMOND SCOTT ort r t h a1 CITY SECRETARY
TIFFANY HAMILTON
MORRIS ALBRIGHT l�'+«5' VAL TIZENO
STEPHEN A.MOSELY CITY ATTORNEY
WILLIE"BAE"LEWIS,JR.
OSMAN SWATI
DERRICK FREEMAN
Date: November 4, 2015
To: Mayor and Council
From: Brian McDougal, City Manager
RE: EDC Movie Screen
Nature of the request:
Several improvements are planned in the area on Procter St. between Austin and Waco
Avenues. Design and engineering on these projects are currently underway. Under
separate approval the EDC Board approved the purchase and installation of a move
screen so that movies can be projected onto the east side of the EDC building while
attendees to the movie sit in Peoples Park to watch the featured movies.
StaffAnalysis, Considerations:
Staff is very supportive of the EDC's investment in our downtown especially with this
initiative. It will bring people back downtown and give families a place to congregate for
great events. It will showcase our downtown to the Golden Triangle.
Recommendation:
Placing this screen on the east side of the building is probably the best option for this
initiative. However, the City does not have control of the property immediately east of
the EDC parking lot owned by a private property owner. Staffs concern, is that if the
property owner builds on this property, it could limit the visibility of the screen for those
who wish to enjoy the movies from the newly renovated Peoples Park. In other words
visibility of the screen could, at some point in the future be blocked.
P.O BOX 1089•PORT ARTHUR,TEXAS 77641-1089 409/983-8101 www.portarthur.net
Option 1 (Best Option): The EDC or the City need to purchase the property between
the park and the EDC parking lot from the private property owner. This would ensure
the long term viability of the project usage.
Option 2: Install the screen on the building without purchasing the property. This
option although not ideal, may require moving the screen at some point to another
location.
Option g: Incorporate the installation of the movie screen into the renovation of the
pavilion. Additional accommodations would need to be made such as closing the street
during showings and finding a new location to install the projector; however, it could
serve as a permanent location for the screen while still using the newly renovated
Peoples Park.
Budget Considerations:
None. The Screen is being purchased by with EDC funds.
P.O BOX 1089• PORT ARTHUR.TEXAS 77641-1089 409/983-8101 •www.portarthur.net
P.R. No. 18997
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY OF PORT
ARTHUR SECTION 4A ECONOMIC DEVELOPMENT
CORPORATION TO SOLICIT PROPOSALS FOR THE
INSTALLATION OF A PROJECTION SCREEN ON THE
EAST WALL OF THE 501 PROCTER BUILDING AT A
PRICE NOT TO EXCEED $50,000
WHEREAS, it is deemed in the best interest of the citizens of Port Arthur to enhance the
appearance of the downtown area and to create an environment that promotes business and
entertainment activities for the community; and
WHEREAS, per Resolution No. 12-641, the Port Arthur City Council authorized the
City of Port Arthur Section 4A Economic Development Corporation (the "PAEDC") to pursue
the building development plan to retrofit the building located at 501 Procter Street (the
"Building"); and
WHEREAS, per Resolution No. 14-428, the City Council approved PAEDC's use of
PAEDC funds in an amount not to exceed $234,791.50 for the remaining cost of the
improvements which include a projection screen; and
WHEREAS, at the PAEDC Board meeting on August 3, 2015, the Board of Directors
approved proceeding with the installation of the projection screen and soliciting proposals for the
installation of a projection screen on the east wall of 501 Procter at a cost not to exceed $50,000
to be funded from the $234,791.50 funds set aside for improvements previously authorized by
City Council.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That PAEDC is hereby authorized to proceed with soliciting proposals for
installation of a projection screen on the east wall of 501 Procter at a cost not to exceed $50,000.
Section 3. That a copy of this Resolution shall be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED on this day of A.D., 2015,
at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES:
Mayor
Councilmembers
NOES:
Deloris "Bobbie" Prince,Mayor
ATTEST:
Sherri Bellard, City Secretary
APPROVED:
Floyd Batis e, PAEDC CEO
#1178237 Page 2
•
APPROVED AS TO • "RM:
Guy N. Goodson, PAEDC Atto
APPROVED AS TO FORM:
Ct'S IC) -0///1 Pir
ValeciWR. Tizeno, City Attorney
#1178237 Page 3
Exhibit "A"
Resolution 14-428
P.R. No. 18527
9/12/14 gg/vt
RESOLUTION NO. /7-4/28
A RESOLUTION AUTHORIZING THE CITY OF PORT ARTHUR
SECTION 4A ECONOMIC DEVELOPMENT CORPORATION TO
FINANCE NECESSARY IMPROVEMENTS INCLUDING ROUGH-IN
BUILD-OUT OF THE SECOND FLOOR AND ADDITIONAL
IMPROVEMENTS FOR THE BUILDING LOCATED AT 501 PROCTER
IN AN AMOUNT NOT TO EXCEED $390,386.00 ($234,791.50 PAEDC
FUND, ACCOUNT NUMBER 120-1429-582.59-01 AND THE REMAINING
BALANCE TO BE PAID BY THE CHASE MTC PAEDC INVESTMENT
FUND).
WHEREAS, it is deemed in the best interest of the citizens of Port Arthur to enhance the
appearance of the downtown area and to create an environment that promotes business and
entertainment activities for the community; and
WHEREAS, per Resolution No. 12-641, the City Council authorized the City of Port
Arthur Section 4A Economic Development Corporation (the "PAEDC") to pursue the building
development plan to retrofit the building located at 501 Procter Street (the `Building"); and
WHEREAS, the City Council authorized PAEDC to make a loan to CHASE NMTC
PAEDC Investment Fund, LLC of Three Million Seven Hundred Forty-One Thousand One
Hundred Dollars and 00/100 Dollars ($3,741,100.00) necessary to proceed with the
redevelopment, improvement and financing of the Building through New Market Tax Credit
Financing(the"CHASE Loan"); and
WHEREAS, the CHASE Loan included a construction contingency of$336,447 which
was not a part of the Construction Manager Guaranteed Maximum Price Agreement (the
"Agreement") between PAEDC and SpawGlass Construction Corporation ("Spaw"); and
WHEREAS, per Resolution No. 13-443, the City Council authorized PAEDC to enter
into the Agreement with Spaw for the retrofitting of the Building at a price to complete the work
not to exceed$3,554,000; and
WHEREAS, the second floor rough-in build-out in the amount of$282,886 as specified
on Exhibit"A" was not included in the Agreement with Spaw; and
WHEREAS, the additional improvements in the estimated amount of$107,500 specified
on Exhibit"B" also were not included in the Agreement with Spaw; and
WHEREAS, at a special Board Meeting on August 28, 2014, the PAEDC Board of
Directors approved the second floor rough-in build-out and the additional improvements as
shown in Exhibits "A" and "B" (collectively the "improvements") in the amount of
$390,386.00 to be funded through the release of construction contingency with the balance from
PAEDC Funds; and
WHEREAS, approximately seventy percent (70%) of the construction of the Building is
complete, and PAEDC requested a partial release of the construction contingency funds from
CHASE from the NMTC PAEDC Investment Fund to be applied to the to the costs of the rough-
in build-out of the second floor; and
WHEREAS, CHASE has agreed to release $155,594.50 from the construction
contingency for the rough-in of the second floor build-out; and
WHEREAS, the City Council of the City of Port Arthur approves PAEDC's use of
PAEDC Funds in an amount not to exceed $234,791.50 for the remaining costs of the
Improvements, subject to the approval of pay requests and change orders for the improvements
that are listed in Exhibits "A" and "B" by the PAEDC Board and the City Council of the City of
Port Arthur; and
#1107488 Page 2
WHEREAS, PAEDC further commits to reimburse the Development Fund from any
remaining funds in the construction contingency upon completion of the Building and the
authorization by CHASE to release said funds from construction contingency.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR,TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the PAEDC is herein authorized to contract for $390,386.00 for the
Improvements as shown in Exhibits "A" and "B".
Section 3. That the PAEDC is herein authorized to use PAEDC Funds in the amount of
$234,791.50 for such Improvements with remaining funds used from CHASE from the NMTC
PAEDC Investment Fund in the amount$155,594.50.
Section 4. That a copy of the caption of this Resolution be spread upon the Minutes of
the City Council. ��j
READ, ADOPTED AND APPROVED on this /(oay of A.D.. 2014,
at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES:
Mayor ,
Councilmembers L"�''""1 i /v; `'/G�
aii,
,zt,,,,,JD
NOES: r/4a/tot .
12‘,.;/).4..........
eloris "Bobbie" Prince, Mayor
#1107488 page 3
ATTEST:
Sherri Bedard, City Secretary
APPROVED:
41111 .
i
Floyd Batiste, PAEDC CEO
APPRO _ I AS T• FORM:
Guy N. Goodso Attorney
APPROVED AS TO FORM:
see memo
Valecia R. Tizeno,City Attorney
41107488
Page 4
EXHIBIT "B"
Improvements Amount
Movie Screen $32,000
Interior Blinds 12,000
Monument Sign 5,000
Dedication Plaque 4,000
Eco-Mesh 5,000
Media Wall 27,000
Atrium Ceiling Fixtures 22,500
107,500
a 1107488 Page 5
Exhibit "A"
Renovation of the Port Arthur Savinas Buildlno(2nd Floor Buildout)-Port Arthur,Texas
CONCEPTUAL BUDGET
Project'Renovation of the Port Arthur Saving Building Estimate No.
Location:501 Procter Street Sheet No: 1
Architect:Haddon&Cowan Architects Collaborative Date: 5-Aug-14
RECAP
Total Unit
Description Cost Quantity Units Price _
DIVISION 01 5 - 6.200 SF $ -
DIVISION 02 5 - 6,200 SF 5 -
DIVISION 03 5 - 6,200 SF S •
DIVISION 04 $ - 6,200 SF 5
DIVISION 05 $ - 6,200, SF S -
DIVISION 06 $ - 6200 SF $ -
DIVISION 07 5 • 6,200 SF $ •
DIVISION 08 S 87,550 8,200 SF $ 14 12
DIVISION 09 S 20,000 6,200 SF S 3 23
DIVISION 10 S 2,480 8,200 SF $ 0 40
DIVISION 11 5 - 6.200 SF S -
DIVISION 12 S - 6.200 SF S -
DIVISION 14 S - 6.200 SF S -
DIVISIONs 21,22,8 23 S 15,250 6.200 SF $ 2.46
DIVISION 26 5 83,350 6,200 SF S 13 44
DIVISION 31832 5 - 6200 SF $ -
DIRECT TOTAL COST $ 208.630 6.200 SF 5 33.65
GENERAL CONDITIONS 9 50% 5 28,874 6,200 SF 5 4 33
CD COMPLETION CONTINGENCY 8 00% S 22,629 6,200 SF $ 3 65
BONDS I INSURANCE I WARRANTY S 5,658 6,200 SF 5 0.91
Builders Risk by Owner
Cost of Work Subtotal $ 263,791
FEE ___ 6.75% S 19,095 6.200, SF 5 3.08
TAX exempt $ - 5 •
PERMITS by owner S - S -
TOTAL ESTIMATED CONSTRUCTION COST II$ 282,886 11-00V-57"1 5F S 45.63
9rt0/2014 1 of 10
Renovation of the Port Arthur Savings Building(2nd Floor Buildout)-Port Arthur,Texas
DIVISION 01
Total Unit
Description Cost Quantity Units Pnce
GENERAL REQUIREMENTS
Not Applicable
DIVISION 02
Existing Conditions/Demolition
Not Applicable
Total Division 02 II$ - II I( II
9/10/2014
2 0l 10
Renovation of the Port Arthur Savings Buildingt2nd Floor Buildout)-Port Arthur,Texas
DIVISION 03
Total _® Unit
Description i Cost Quant i Price
CONCRETE WORK ®_�
Not Applicable
Total Division 03 ® _ S -
Renovation of the Port Arthur Savings Buildingl2nd Floor Buildout}-Port Arthur,Texas
DIVISION 04
E=====
Total ^f Unit
Description Cost Quantity Units I Price
MASONRY I
Not Applicable
�� -- Total Division 04 II S - 11 II I'
0/1012014 3 0!10
•
Renovation of the Port Arthur Savings Buildingl2nd Floor Buildout)-Port Arthur.Texas
DIVISION 05
Total Unit
Description Cost Quantity Units Price
METALS
Not Applicable
DIVISION 06
MILLWORK 5 -
Total Division 06 S
9/10/2014 40'10
Renovation of the Port Arthur Savings Building(2nd Floor B4ildo0t)-Port Arthur,Texas
DIVISION 07
r Total Unit
Description ' Cost Quantity Unita Price
THERMAL AND MOISTURE PROTECTION
Not Applicable
Total Division 07 3
9/10/2014 5of 10
•
•
•
Renovation of the Port Arthur Savings Buildinst2nd Floor Buildout)-Port Arthur,Texas
DIVISION 08
Total Unit
Desch•tion Cost QuantityUnits Price
DOORS AND WINDOWS
Door-Pro Doors,Hardware wl Installation $ 3.900
Tri-Star Glass 10terLor Dlaos Walls S 29.000
Glass ft Elevator Lobby $ 5,400
Gulf Coast Railing Glass Handrails $ 49,250
Total Division 08 s 87,55011 it 11 1
9/102014 6 0110
Renovation of the Port Arthur Savings Buitding(2nd Floor Buildout)-Port Arthur,Texas
DIVISION 9
Total Unit
Descrlptlon Cost Quantity Unils Price
FINISHES
Southeast Texas Drywall Frame,Drywall and Paint $ _
Porters Flooring Flooring-Tile S 7,000
Custom Flooring Flooring-Carpet i S 13,000
Total Division 9 II-s 20.006 11 II 11 I
Renovation of the Port Arthur Savings Building(2nd Floor Buildout)-Port Arthur,Texas
DIVISION 10
Total Unit
Description Cost Quanhty ® Price
_-
SPECIALTIES _-
Griesenbeck lode(Partitions and Accessories 0 1,980 _-
111111111.1
Kaiser Graphics Signage s 500 _
( Total Division 10 IIs 2,4801[ 11 11 I
9/102014 7 0110
•
•
•
Renovation of the Port Arthur Savings Building(2nd Floor Buildout)-Port Arthur,Texas
DIVISION 11
Total Unit
Description I Cost Quantity Units Pnce
EQUIPMENT -
Not Applicable --
Total Division 11
II
Renovation of the Port Arthur Savings Buildinq(2nd Floor Buildout)-Port Arthur,Texas
DIVISION 12
Total Unit
Description Cost Quantity Units Price
FURNISHINGS
Not Applicable
Total Division 12 11 s - II 11 11 J
Renovation of the Port Arthur Savings Building(2nd Floor Buildout)-Port Arthur.Texas
DIVISION 14
Total Unit
Description Cost Quantity Units Price
Conveying Equipment
Not Applicable
1 - - Total Division 14 1I
9/10/2014 8ol 10
•
•
•
•
Renovation of the Port Arthur Savings Buildina(2nd Floor Buildout)-Port Arthur,Texaf
DIVISIONs 21,22,&23
Total Unit
Description Cost Quantity Units Price
DIV.21 FIRE SUPRESSION
Coastal Sprinkler Fire Sprinkler S 1.750
DIV.22 PLUMBING
Hinole Plumbing Plumbing Fixtures and Piping S 11,000
DIV.23 HEATING,VENTILATING,AND AIR CONDITIONING
Associated Mech. HVAC Installation S 2.500
Total Divisions 21,22,&23 S 15.250 11 Imo_
Renovation of the Port Arthur Savings Buildinq(2nd Floor Buildoutl-Port Arthur,Texas
DIVISION 26
Total Unit 1
Description Cost Quantity Units Price
ELECTRICAL
GulfCoast Electric Electrical S 75,000
Maverick Comm. Data S 8,350
Texas Fire Alarm Fire Alarm(Included in Electrical) 5
Total Division 26
9/10/2014
9 01 10
Renovation of the Port Arthur Savings Building(2nd Floor Buildout)-Port Arthur,Texas
DIVISIONs 31,32,8 33
Total Unit
Description Cost Quantity Units Pnce
DIV.31 EARTHWORK
Not Applicable
DIV.32 EXTERIOR IMPROVEMENTS
Not Applicable
DIV.33 SITE UTILITIES
Not Applicable
Total Divisions 31 3 32 $ - If
9/102014 10 0110
•
EXHIBIT "B"
Improvements Amount
Movie Screen $32,000
Interior Blinds 12,000
Monument Sign 5,000
Dedication Plaque 4,000
Eco-Mesh 5,000
Media Wall 27,000
Atrium Ceiling Fixtures 22,500
107,500
4110748s
Page 5