INTEROFFICE MEMORANDUM
PUBLIC WORKS DEPARTMENT-ADMINISTRATION DIV.
To: Brian McDougal, City Manager
From: Rawetts Baaheth Sr., Interim Public Works Director 4 1C
Date: November 25, 2015
RE: P. R. 19234
RECOMMENDATION:
It is recommended that the City Council approve Proposed Resolution No. 19234, approving the second
year of a contract with the option to renew for one additional year with J. M Kaufman and Redwine
Enterprises, both of Port Arthur, Texas, and Mid County Materials & Construction of Nederland, Texas,
for excavating and hauling materials. This contract has a projected budgetary impact of $950,000 per
year. This service will be provided on an as needed basis.
STAFF ANALYSIS:
None.
BACKGROUND:
This an annual contract for excavating and hauling materials for the Public Works Department and other
City departments. Historically the City Landfill, Streets Division, and Parks Departments have been the
major users of this service. This is the second year of a three year renewal contract.
BUDGET CONSIDERATIONS:
Funds are available in Landfill Account#403-1274-533.59-02.
/aw
"Remember we are here to serve the Citizens of Port Arthur"
P. R. 19234
12/03/15
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE THE SECOND YEAR (1sT RENEWAL) OF THE
CONTRACTS WITH J. M. KAUFMAN AND REDWINE
ENTERPRISES, OF PORT ARTHUR, TEXAS, AND MID
COUNTY MATERIALS & CONSTRUCTION OF NEDERLAND,
TEXAS FOR THE HAULING OF MATERIALS WITH THE
OPTION OF RENEWAL FOR ONE ADDITIONAL YEAR WITH
PRICES BEING ADJUSTED ACCORDING TO THE
TRANSPORTATION CONSUMER PRICE INDEX, WITH A
PROJECTED BUDGETARY IMPACT OF $950,000.00 PER
YEAR. FUNDING AVAILABLE IN LANDFILL
CONSTRUCTION ACCOUNT 403-1274-533.59-02.
WHEREAS, the City requires the services of a contractor to provide for excavating and
hauling of materials for various projects within different departments; and,
WHEREAS, per Resolution No. 14-542, the City entered into an agreement with the
option to renew for two additional one year periods with J. M Kaufman and Redwine
Enterprises, of Port Arthur, Texas, and Mid County Materials Construction of Nederland, Texas,
for hauling of materials with the option of renewal for two additional one year periods; and,
WHEREAS, the City Council deems it is in the best interest of the City to renew the
contract for the second year(1St renewal); now therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT,the City Manager is hereby authorized to execute the second year(1st renewal) of
a contract for excavating and hauling of materials with a projected budgetary impact of
$950,000, with the option to renew for one additional year, with prices being adjusted according
to the Transportation Consumer Price Index, with J. M. Kaufman of Port Arthur, Texas (in
substantially the same form as attached as Exhibit "A"), Redwine Enterprises of Port Arthur,
P. R. 19234
Page 2
Texas (in substantially the same form as attached as Exhibit "B"), and Mid County Materials &
Construction of Nederland, Texas (in substantially the same form as attached as Exhibit"C").
THAT, funding is available in account various departments accounts.
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ,ADOPTED,AND APPROVED this the day of , A.D. 2015 at
a meeting of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
Noes:
Mayor
ATTEST:
Sherri Bellard
City Secretary
A: 'ROVE ) AS TO FORM: APPROVED AS TO AVAILABILITY
OF FUNDS
Valecia Ti if,
City Attorney / Je a e, CP• , GF OA gte4 aH16.4yhCd.
Interim Director of Finance Lytf
APPROVED FOR ADMINISTRATION:
Cli on Williams, CPPB
Brian McDougal Acting Purchasing Manager
Interim City Manager
Rawetts Baaheth, Sr.
Acting Director of Public Works
Exhibit A
P. R. 19234
12/03/15
RENEWAL CONTRACT FOR EXCAVATING AND HAULING OF MATERIALS
THIS AGREEMENT,made this the of , 2015,by and between the City of
Port Arthur, a municipal corporation organized under the laws of the State of Texas,hereinafter
called"OWNER"or "CITY", and J. M. Kaufman ,hereinafter called
"CONTRACTOR". WITNESSED: That for and in consideration of the payment terms,
conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. Pursuant to Resolution 14-542, the City entered into a one-year contract with the option
of renewal for two additional one year periods. The parties hereby agree to exercise said
option for the second year.
2. The term of this Agreement shall be from November 17, 2015 through November 16.
2016, unless sooner terminated under the provision hereof. The City can terminate this
contract at its convenience which includes, but is not limited to, funding not being
available in any budget cycle within thirty (30) days written notice. It shall be renewable
by mutual agreement for one (1) additional year. Prices quoted shall be indexed for the
next year using the Consumer Price Index category "Transportation". Each subsequent
yearly contract renewal shall require approval of the City Council.
3. During the term of this Contract, the CONTRACTOR will furnish at his own expense all
of the materials, supplies, tools, equipment, labor, and other services necessary to
connection therewith, excepting those supplies specifically not required on
CONTRACTOR in the Specifications.
4. The CON TRACTOR agrees to perform all the work described in the Specifications and
contract documents and comply with the terms therein for unit prices as stated below:
Delivered within the City of Port Arthur
Items Unit Cost
Fill Sand $7.28/CY
60/40 $7.28/CY
Top Soil $10.18/CY
Picked up at Plant Location
Items Unit Cost
Fill Sand $3.06/CY
60/40 $3.06/CY
Clay $2.55/CY
Top Soil $8.15/CY
P. R. 19234
12/03/15
Hauling Materials—Full Load
Items Unit Cost
Limestone $6.11/TON
HMAC Type Material $6.11/TON
Cement Stabilized Sand $6.11/TON
Concrete Debris $10.18/TON
Hauling Materials—Partial load
Items Unit Cost
Limestone $12.22/TON
HMAC Type Material $12.22/TON
Cement Stabilized Sand $12.22/TON
Concrete Debris $20.36/TON
5. The term"Contract Documents"means and includes the following:
1) Agreement
2) Advertisement to Bids*
3) General Information*
4) Specifications *
5) Bid*
6) Bidder's Information Sheet*
*These items were attached to the original letting contract. The agreement only is
included for this renewal.
6. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
7. IN WITNESS WHEREOF,the parties here to have executed, or caused to be executed by
their duly authorized officials,this Agreement in two (2)copies, each of which shall be
deemed an original of the date first written above.
OWNER CONTRACTOR
City of Port Arthur J. M. Kaufman
BY: BY:
Brian McDougal Representative
City Manager
Exhibit B
P. R. 19234
12/03/15
RENEWAL CONTRACT FOR EXCAVATING AND HAULING OF MATERIALS
THIS AGREEMENT,made this the of , 2015,by and between the City of
Port Arthur, a municipal corporation organized under the laws of the State of Texas,hereinafter
called"OWNER"or "CITY', and Redwine Enterprises ,hereinafter called
"CONTRACTOR". WITNESSED: That for and in consideration of the payment terms,
conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. Pursuant to Resolution 14-542,the City entered into a one-year contract with the option
of renewal for two additional one year periods. The parties hereby agree to exercise said
option for the second year.
2. The term of this Agreement shall be from November 17, 2015 through November 16,
2016, unless sooner terminated under the provision hereof. The City can terminate this
contract at its convenience which includes, but is not limited to, funding not being
available in any budget cycle within thirty (30) days written notice. It shall be renewable
by mutual agreement for one (1) additional year. Prices quoted shall be indexed for the
next year using the Consumer Price Index category "Transportation". Each subsequent
yearly contract renewal shall require approval of the City Council.
3. During the term of this Contract,the CONTRACTOR will furnish at his own expense all
of the materials, supplies, tools, equipment, labor, and other services necessary to
connection therewith, excepting those supplies specifically not required on
CON TRACTOR in the Specifications.
4. The CONTRACTOR agrees to perform all the work described in the Specifications and
contract documents and comply with the terms therein for unit prices as stated below:
Delivered within the City of Port Arthur
Items Unit Cost
Fill Sand $7.58/CY
60/40 $5.56/CY
Clay $4.21/CY
Top Soil $13.23/CY
Picked up at Plant Location
Items Unit Cost
Fill Sand $4.07/CY
60/40 $4.07/CY
Clay $3.05/CY
Top Soil $10.18/CY
P. R. 19234
12/03/15
Hauling Materials—Full Load
Items Unit Cost
Limestone No Bid
HMAC Type Material No Bid
Cement Stabilized Sand No Bid
Concrete Debris No Bid
Hauling Materials—Partial load
Items Unit Cost
Limestone No Bid
HMAC Type Material No Bid
Cement Stabilized Sand No Bid
Concrete Debris No Bid
5. The term"Contract Documents"means and includes the following:
1) Agreement
2) Advertisement to Bids*
3) General Information*
4) Specifications *
5) Bid*
6) Bidder's Information Sheet*
*These items were attached to the original letting contract. The agreement only is
included for this renewal.
6. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
7. IN WITNESS WHEREOF,the parties here to have executed,or caused to be executed by
their duly authorized officials,this Agreement in two (2) copies, each of which shall be
deemed an original of the date first written above.
OWNER CONTRACTOR
City of Port Arthur Redwine Enterprises
BY: BY:
Brian McDougal Representative
City Manager
P. R. 19234
12/03/15
RENEWAL CONTRACT FOR EXCAVATING AND HAULING OF MATERIALS
THIS AGREEMENT, made this the of , 2015, by and between the City of
Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter
called"OWNER"or "CITY", and Mid County Materials & Construction,hereinafter called
"CONTRACTOR". WITNESSED: That for and in consideration of the payment terms,
conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. Pursuant to Resolution 14-542,the City entered into a one-year contract with the option
of renewal for two additional one year periods. The parties hereby agree to exercise said
option for the second year.
2. The term of this Agreement shall be from November 17, 2015 through November 16,
2016, unless sooner terminated under the provision hereof. The City can terminate this
contract at its convenience which includes, but is not limited to, funding not being
available in any budget cycle within thirty(30) days written notice. It shall be renewable
by mutual agreement for one (1) additional year. Prices quoted shall be indexed for the
next year using the Consumer Price Index category "Transportation". Each subsequent
yearly contract renewal shall require approval of the City Council.
3. During the term of this Contract, the CON IRACTOR will furnish at his own expense all
of the materials, supplies, tools, equipment, labor, and other services necessary to
connection therewith, excepting those supplies specifically not required on
CONTRACTOR in the Specifications.
4. The CONTRACTOR agrees to perform all the work described in the Specifications and
contract documents and comply with the terms therein for unit prices as stated below:
Delivered within the City of Port Arthur
Items Unit Cost
Clay $4.92/CY
5. The term"Contract Documents"means and includes the following:
1) Agreement
2) Advertisement to Bids*
3) General Information*
4) Specifications *
5) Bid*
6) Bidder's Information Sheet*
*These items were attached to the original letting contract. The agreement only is
included for this renewal.
P. R. 19234
12/03/15
6. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
7. IN WITNESS WHEREOF, the parties here to have executed, or caused to be executed by
their duly authorized officials,this Agreement in two (2) copies, each of which shall be
deemed an original of the date first written above.
OWNER CONTRACTOR
City of Port Arthur Mid County Materials&Construction
BY: BY:
Brian McDougal Representative
Exhibit C
>
'Z.: l' agigCE 0 al .g. rn RI, -n r czi o o 2. 4,
ag ,.. Aar, r, , BI ,T.- g. ... ..‘ a. a 3
pogo ‹ 3 os`Z - o - 0 a' : - —
� � jam = - -
CT VI 3
CD to 0 0 ror In Cu
2 ,e- ...,, g 0 - 0 = ,,,,
.11
RCO
ag d Q :
0
6
-Aix c
ia . �� �L • cti (fl
,t, -• i i La (4 G3 bin . igo i4, b. �a
z
46111111.1•91.. n
I 4 II —1* ." 0 ti:l all. I 0 (11`C fig g
.1'4;4 h.3 14i (.Ii #t t'J + C= hJ C "4,1 i U 4i io !tis
0
• ■ II , j43COi 0 C.111 e C
i+4 co ca ns LI i4 ID j '1•4 iws IN its c.,
C
cz (]
y..i �y _..p �. . -'x . . �y� i` cm ZA ' e h
`Y # .Y j W bb !lY j ' L W .1 LA 6 ` �`� — i4 vm
! 9 a7
cot
_ii, i� l A C
a .• ilt CP
6caksLi kit i b .a La, k {.? inji7-+ oNc.9 ►07 -di
z
co
-. WW14) !til--. G is)is) ill -11• ;It. b £:r3 -4to i
6 R
-h.) Le .V im W ii',..) .R/ .y.s+ . y/ i'0 a1.1. 1.11. 1i
6
Ilr - ) a.
N.
• • -r i { tti? {*,1
6kofY co 1YT -% -4 ie«6 tr. W W Y+ — io d Y+ rY �.