HomeMy WebLinkAboutPR 19301: STREET AND DRAINAGE SYSTEM IMPROVEMENTS ON COLLINS AVENUE FROM HWY 365 SOUTHWARD I I (2 Energy City of ; -- cin - /al\\� ' )' ort rthur Texas INTEROFFICE MEMORANDUM PUBLIC WORKS DEPARTMENT-ADMINISTRATION DIV. Date: February 2, 2016 To: Brian McDougal, City Manager From: Rawetts Baaheth, Sr., Acting Director of Public Works RE: Proposed Resolution No. 19301 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 19301 accepting the street and drainage system improvements on Collins Avenue from Highway 365 southward approximately 475 feet, and authorizing the City Manager to sign the Certificate of Acceptance on behalf of the City of Port Arthur, Texas. BACKGROUND Amoebia - Collins, began construction at the now identified right-of-way Collins Avenue in early 2015 in conjunction with the Tractor Supply Developement project. Work is now complete on the street and drainage system improvements and they are ready for acceptance by the City. Amoebia - Collins has submitted all required paperwork for acceptance of the street and drainage improvements. Per Resolution No. 16-026, on January 8, 2016, the City Utilities Department accepted the installation of the water and sanitary sewer system within the utility easement for the Tractor Supply Company facility. BUDGET/FISCAL EFFECT The street and drainage systems improvements will add additional infrastructure to be maintained by City forces. "Remember we are here to serve the Citizens of Port Arthur" P.R. No. 19301 2/2/16 rtb RESOLUTION NO. A RESOLUTION ACCEPTING THE STREET AND DRAINAGE SYSTEM IMPROVEMENTS ON COLLINS AVENUE FROM HIGHWAY 365 SOUTHWARD APPROXIMATELY 475 FEET, AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS. WHEREAS, Amoebia — Collins of Wooster, Ohio, has constructed the street and drainage system improvements for Collins Avenue from Highway 365 southward approximately 475 feet, and has constructed the Tractor Supply Store adjacent to said street; and, WHEREAS, representatives of the Public Works Department have inspected the completed street and drainage system improvements; and, WHEREAS, the City has received street and drainage system improvements and the Engineer's Certificate of Completion, dated December 11, 2015 from Jeremy Mitchell, P.E. of Soutex Surveyor and Engineers, (attached as Exhibit "A"), a Contractor's Certificate and Release, dated February 2, 2016 from Amoebia - Collins, (attached as Exhibit "B"), a Contractor's Certificate of Guarantee, dated February 2, 2016 from Amoebia - Collins, (attached as Exhibit "C"), certifying that the street and drainage system improvements have been completed for Collins Avenue; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS, THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to execute on behalf of the City of Port Arthur, a Certificate of Acceptance to Amoebia - Collins, for the street and drainage system improvements constructed within the right-of-way of Collins Avenue (attached as Exhibit"D"); and, P.R.No. 19301 2/2/16 rtb THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this day of , A.D. 2016 at a meeting of the City Council of the City of Port Arthur, Texas by the following vote: Ayes: Mayor Councilmembers: Noes: Debris "Bobbie" Prince Mayor ATTEST: APPROVED AS TO FORM: Adempairmir, Sherri Bellard, City Secretary Val izeno, City/rney APPROVED FOR ADMINISTRATION: i , , Brian McDougal ' <-tts T. Baaheth, Sr. City anager I Brim Director of Public Works , 44* ,f,dh Hassan Shomalza , P.E. City Engineer EXHIBIT A TBPE Firm No. F-5755 i TBPLS Firm No.10123800 LA EF.0005711 ,Mt OUTE -- '777".74- 7 --f 3737 Doctors Drive Port Arthur,Texas 77642 SURVEYORS&ENGINEERS S Office(409)9832004 Fax(409)983.2005 February 1, 2016 City of Port Arthur 444 4th Street Port Arthur, Texas 77640 Attn: Mr. Rawetts Baaheth, Sr. Interim Public Works Director Re: 31' Wide, 475 LF of Roadway perpendicular to HWY 365, City of Port Arthur,Texas Soutex# 15-0522 Dear Rawetts: Please find enclosed four (3) originals of the following Close-Out Documents for the above referenced Subdivision: • Engineer's Certificate of Completion — noting substantial completion as of December 11, 2015 • Contractor's Certificate and Release—indicating that nothing is owed on the project • Contractor's Certificate of Guarantee—indication of a one year guarantee for the labor and materials on roadway. These documents are for your use in making a resolution for acceptance by Council action. Also enclosed are copies of the backup information relative to the project.This information consists of: • Subgrade and Concrete Test • As-Built Respectfully submitted, Wr r_emY Mitchell, P.E., S.I.T. Project Engineer Enclosures Tractor Supply-City of Port Arthur 1 ENGINEER'S CERTIFICATE OF COMPLETION Project: CONSTRUCTION OF A 31' WIDE, 475 LF OF ROADWAY PERPENDICULAR TO HIGHWAY 365 TO SERVE TRACTOR SUPPLY PER CITY APPROVED PLANSET IN THE CITY OF PORT ARTHUR,TEXAS Date of Issuance: DECEMBER 11, 2015 Owner(s): CITY OF PORT ARTHUR Owner's Project No.: NA Soutex# 15-0522 Engineer: SOUTEX SURVEYORS&ENGINEERS Contractor: AMOEBIA I COLLINS, 2869 CLEVELAND ROAD,WOOSTER, OHIO,44691 330-275-3966 OFFICE 330-236-3882 FAX -- This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: TO CITY OF PORT ARTHUR (OWNER) AND TO AMOEBIA I COLLINS (CONTRACTOR) The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on December 11,2015 T ‘1 ................ .�til DATE OF SUBSTANTIAL COMPLETION S * * »y« / JEREMY J.MITCHELL Executed by Engineer on ,2015 116941 'crib `.� ler my itched• E. SO 0 EX S RVEYO &ENGINEERS 1/1 EXHIBIT B CONTRACTOR'S CERTIFICATE AND RELEASE FROM: AMOEBIA I COLLINS (NAME OF CONTRACTOR) TO: The City of Port Arthur (OWNER) REFERENCE CONTRACT NO. SOUTEX 12-0522 ENTERED INTO THE DAY OF AND NO FORMAL CONTRACT EXISTS BETWEEN CONTACTOR AND OWNER (NAME OF CONTRACTOR) OF Cir, (STATE) FOR THE: CONSTRUCTION OF A 31'WIDE,475 LF OF ROADWAY PERPENDICULAR SO HIGHWAY 365 TO SERVE TRACTOR SUPPLY PER PLANSET (NAME OF PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. The undersigned hereby certifies that there is due from, and payable by, the Owner to the Contractor under the contract and duly approved Change Orders and modifications the balance of $0.00 2. The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: (a) None (b) None (c) None (d) None (ITEMIZE CLAIMS AND AMONTS DUE) (IF NONE,SO STATE) 3. The undersigned further certifies that all work required under this contract,including work required under Change Order(s)numbered NONE ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies, or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the Contractor were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above mentioned contract or any modifications or change thereof. 1 5. That in consideration of the payment of the amount stated in Paragraph 1 hereof, the undersigned does hereby release the Owner and Operator from any and all claims arising under or by virtue of this contract,except the amount listed in Paragraph 2 hereof due from the Owner;provided,however,that if for any reason the Owner does not pay in full the amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of any amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of said contract or modification thereof,and will execute such further releases or assurances as the Owner and Operator may request. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this a day ofe_v ,2014, (SEAL) AMOEBIA I COLLINS (CONTRACTOR) BY: (PRESIDEN C.W.COLLINS ,being first duly sworn on oath,deposes and says,first,that he is the OWNER of AMOEBIA I COLLINS. (PRESIDENT) (NAME OF COMPANY) second,that he has read the foregoing certificate by him subscribed as OWNER (OWNER) of AMOEBIA J COLLINS (NAME OF COMPANY) Affiant further states that the matters and things stated herein are true. (C.W.COLLINS) Subscribed and sworn to before me this day of •Ae_V ,20 $to My commission expires ,DP\- 1 'z1i^ MBECKY hAURp� 'may (DATE) , j'c:.rr' MY COMMISSION 12361222 i:. EXPIRES:Mar:.h 29 2017 (Nict4410 PUBLIC) 2 EXHIBIT C CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: AMOEBIA j COLLINS (NAME OF CONTRACTOR) TO: The City of Port Arthur (OWNER) REFERENCE CONTRACT NO. SOUTEX 12-0522 ENTERED INTO THE DAY OF AND NO FORMAL AGREEMENT EXISTS BETWEEN CONTRACTOR AND OWNER (NAME OF CONTRACTOR) OF (CITY) (STATE) FOR: CONSTRUCTION OF A 31'WIDE, 475 LF OF ROADWAY PERPENDICULAR TO HIGHWAY 365 TO SERVE TRACTOR SUPPLY PER PLANSET (NAME OF PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. AMOEBIA j COLLINS does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular,and free from improper workmanship,and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials,due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. 3. This Certificate is given in connection with the final payment under the contract between the Owner and NO FORMAL CONTRACT EXISTS and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. 1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this day of\.P Vj , 20 .\ . (CORPORATE SEAL) AMOEBIA I COLLINS (CONTRACTOR) BY: /111111/7//// (C.W.COLLINS,Owner) C.W.COLLINS ,being first duly sworn on oath,deposes and says,first,that he is the (OWNER) OWNER of AMOEBIA I COLLINS (TITLE) (NAME OF COMPANY) second, that he has read the foregoing certificate by him subscribed as OWNER (TITLE) of AMOEBIA ( COLLINS (NAME OF COMPANY) Affiant further states that the matters and things stated hereinna/ar, true. (C.W.COLLINS) Subscribed and sworn to before me this day of ` 'C\i") , 20 t My commission expires (DATE) EECY,Y MU'F(cP'sY ry MY 4COMMISSION' +2001222 : EYF Inca hiaL,h S,2017 Green,county (NOTA 4'UBLIC) ycs^...wt%•-:a a��=:.-z•-aax-..=.-++saz.zmsraxc>--�_w� ZD xo I b a a- A b/ s1 a Zs x 3sa� � V aP '1 2- alInfillinahn 2-1 I , !I _ 41 11 o a J 1 ;LI a b wt Q Z N 3 .$ :Apk., g IRS A 9 $ p� gs' $3� 'p '" it 3�,� J O V N'',, E Z : :: ::: : gi6 : :: --0 i 1 , :11 1 gh 01 ;1 t ii 'it! i _i i. 0 0=6 I! g l$ a i ; a€ i t $ 48 g 1 §i l a4: rzi M' `l IA g (d�S Q a O p ;:a'"3 ;bo i., C6 q gid Y,3 !if SYSM 8 l t I" a II o ? ;1ii G it 11 t eg c ya §i A '444E1 Z s`n9 �g�y+R 3 --. aYamJe wMoae ilmAtle �•. ` F 9 0 W b'i { a la , L i „,' ii cc i I .,_ s.11: I W l: o H m a Y 0 a V ilk Z ill.- wW 4 EJvaa11 3 j :emar.rrro� — Itt IV 1s , e ca i g I o 1 iiE 3�R va x b$` e E 'a' I gill gh R L as 'ii' !1b a lUtI!! "34.: " a d w` t @ as e.d a sfii a k'I !I!gig11 i 0;Ill iRm@ . it g gd § , : ilgiso Iloigx illi is li In inii $ i @ in! Ym LI! 1 '. 00 O O O O oe® ®�J- ® %1 U = - - ti . ! z „ • g m d S 1 aE' ti_W hbWgiig 4 ;15'.:111 c WEIN/ - 4 .9Z1114 " i§ iio € 4E441; 1! 11ewoi ai C @3 1 ,w a a 0 gi li } 3 or, 1i� : II@z -q34 Y Ilib xt li i6L$ a 1 i $ I a a Ili lm k, ! , <p Ei a2 ii a i n k pig; 4 . g S z a as/r 315 1,011 g80,4"- b g � 1 f qsPl fir@ x :gs2 M y i imb p ii A A —1 ��5����� b I N�I� k�8g6� $ i lilil w%x €� b � a 8'9 i�`� x: i929i i4!tI!H VI ; ig I'!'P a eii.aBi s o a a$ �m �a �� i ��'m � Si x5yb2g :I !-I $ N Ii:1 gI zg : ari@§ rim k imp , $ ; @£ a g@ a"� a ^a ',it; :.*._'1 _,$1'i /1 4 � a e /a 64.a i 6 + L // .nm __._ DC 4 o i_ 7 �E_ s T` +Ina1m Lied.Md. fil m r y I ",p ro• :I I. '.I 1 1 '' - s 1�, 7 3 MU o ?', , ,i,, , - r . 1 JT t 4 ' ri v' 7 gi..--„ . , ,,,„, _ „\ \ .-im •r�I1 i CLL41 -i-, .re 1A Nj iT�t' i a i moi ,'4 Q- tv� mw 44 1 I ' a P � , Qumi' 1 ei CJI I ' 4 I ].SII as ii x --_ -. _ I 1 i . i aQ H .1 1 li - (i! r: ��'� it 3Ng Illi i d a ` } �. 0 j n ,:�, ,- 6: ;s a i? i ti Q 11,1'11 �. `3 i 11.. 42 lig W 03H5 - I I III , ..i 12- s 3�JVL Off _.._.I=.11_ ay 1 'a- _ --. I 1 o . ----- a 1. V1 - /( ray - — - I I ' 1 " i di si 1 e I i I i1c 111110 ��yy1 ttj� rry� {�t�yy Tolunay-Wong Engineers,Inc. V 1111!! T- ll 2455 W.Cardinal Drive,Suite A Beaumont,Texas 77705 ng 1*�' T��i Ph:(409)840-4214 Fax:(409)840-4259 ginee REPORT OF IN-PLACE DENSITY CLIENT: Amoebia - Collins PAGE 1 OF 2 Attn: C. W. Collins 2869 Cleveland Road PROJECTNO.: 15.21.178 Wooster OH 44691 76199 REPORT NO.: DATE OF SERVICE: 10/09/2015 PROJECT: PO No. 2049-PATX AUTHORIZATION: Tim 615-788-9562 Tractor Supply REPORT DATE: 10/13/2015 Port Arthur, Texas SERVICES: To perform moisture and density tests at the project site according to the frequency and requirements set forth in the project documents. PROJECT DATA CONTRACTOR: Amoebia - Collins GAUGE: Humboldt DENSITY _ MOISTURE GAUGE SERIAL NO.: 40 97 METHOD OF TEST: ASTM D6938-10 ASTM D6938-10 STANDARD COUNTS SPECIFICATION: 95 ± 3% MOISTURE-CURRENT: 482 PREVIOUS: 480 DENSITY-CURRENT: 2895 PREVIOUS: 2892 TEST MODE: Direct Transmission PROBE DEPTH: 6 MOISTURE/DENSITY RELATIONS OPTIMUM MAXIMUM REFERENCE M/D# TEST OF MATERIALS MOISTURE% DENSITY pcf REPORT 1. CLAY Fill Brown w/Tan Fat CLAY 26.2 93.3 74679 REPORT OF TESTS TEST FIELD OPTIMUM FIELD DENSITY MAXIMUM PROBE LIFT/ M/D MOISTURE MOISTURE (pcf) DENSITY DENSITY NO LOCATION DEPTH ELEV NO (%) (%) WET DRY (pcf) (%max) 1. Access Road 6 Final 1 20.1 * 26.2 111.7 93.0 93.3 99.7 Edge of Road See Attached Drawing 2. Access Road 6 Final 1 20.9 * 26.2 108.3 89.6 93.3 96.0 Near Fence See Attached Drawing 3. Access Road 6 Final 1 20.9 * 26.2 110.7 91.6 93.3 98.2 Edge of Road See Attached Drawing Report of Tests continued on page 2 Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1007SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. Tolunav-Wong REPORT NO.:76199 Engineers,Inc. REPORT OF TESTS (continued) PAGE 2 OF 2 PROJECTNO.: 15.21.178 Amoebia — Collins DATE OF SERVICE: 10/09/2015 FIELD OPTIMUM FIELD DENSITY MAXIMUM TEST PROBE LIFT/ M/D MOISTURE MOISTURE (pcf) DENSITY DENSITY NO LOCATION DEPTH ELEV NO (%) (%) WET DRY (pcf) (%max) 4. Access Road 6 Final 1 20.0 * 26.2 107.9 89.9 93.3 96.4 Near Fence See Attached Drawing 5. Access Road 6 Final 1 19.9 * 26.2 108.1 90.2 93.3 96.7 Edge of Road See Attached Drawing 6. Access Road 6 Final 1 20.5 * 26.2 107.6 89.3 93.3 95.7 Near Fence See Attached Drawing An asterisk (*) appears next to test results which do NOT meet the project specifications as noted above. ADDITIONAL COMMENTS: Technician: James West, Fied Technician TOLUNAY-WONG ENGINEERS, INC. Report Distribution: (1)Amoebic-Collins (1)C.W.Collins �;NVD �•N`�.� Liana Collier CMT Department Manager Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1007SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. C I los • U gp bsla eg !! p m a gigs . e= p 71 � sg f s-lg6 il . i 1! gi1 g r 1! !4 1 1 : w IJ \ g V .. g r, J ggUI1!! Jllb ll il i 11 ii!;il $ ':1 111 4 14 3e> 46 1411 ilia i i gx i I€ > z o 1 P 1511 o iii N lel ar al. x I j _ `, O ®, ss® ®G O l8 p- Lil 7 S -- H H f.n R g U 12-2 0 181 1aril Pg3 ti 1 xd! 0 81 411x 1r na ig = W>CC "" u sr gb n az x E$ e i'.-: „ ' ti i m W b rx3 i Y & x i�� A`$' Is .$ !! a 2p gig , a d G in RC ir"gi Iv '” 13 S N:B & Q d oY a z 3 'ayg �' PIPE; a tltl ttttt ?d iLg§$a,, sigagg a 040 bg ¢iggsg gif4S g0 ai° ye 1 ! rid r 1 Y 8_$a Y` a d e re6 �+ '''( -(1 z 4;411° 11111` In xla >F a$ g ;t 1 11141. $� ; Pi! W !� o I bpap g ae la r1 sa �6-xe g s {/Dq g@ o. .p. 1 s gyrg LL I yt $Y$liro b p. II }+ g!D i 0,1 Yg . r �il #1 yy ;gp 3g .0 pbl li g _ x§ qi Ez `l'Er Ega gg !ii:I @ m.a y g e y b4 zo ° a^` r3 !: 3 _a a @@a r v $gpr I R gg3f Ii gg ' 3- xx 3 fi .r xa$ A � $" 33_3 3a $ < xpig : ---- .. . .. ^ . z ' 3 v 1 2 Q I . f niZeaF , l • , .•'•7:1-t6.Z6.. 1•••••3( 4... 1;9-''-'.'4.'''''St'''''{ gab -a i 1 IN .ii 6' J BOO m L I �`�� { /180,0114:0.7 MOM W a m V 51 F O m c g r T - I m } i d - ,«,, { U I'<1gri i ,: Me -i°(1 .sac �' -i ' .0 b �� a�� l 0 < - rW k 'O�\• arP to • co„ C +� i Ca.4, .'iek.I(eWa W I,„ �> 'moi 1 , G i Fm w*-(ffV NJ �f z°°i as a\\ -w 1: g li Wr° md' t L i C 4: CII g $ • + __— <E . _ I 4 I F .Ig + -s I Y L r { $ t` 4 W 1, 1 ... O Li. �1 I\\` F 1-Q �j �� h yr` r f.,Ii. O L a ' t _Err- . w�"; ' _ }; I I1i a ;g , 14 zN— 1 _a�1 I a 4, iE 1 —: 4_„- inti W 3F]Ya O4 .;1er L ig j L, 4 L 1 ' CT Ab bill11 x,xtfltle nyaaom �l - 121 11 ! I ISI —- i ' , I . + rgw } k i j �'., ;gi r .= s� I T :.--- Pg.." 1 I ',—. Ilipw 8 F„, e � ' a yi `t ill i 5 f=x a t'' i ,a C g 111111 f il 11,1i I 1 ii s J !I i41 Ilpe. n Q ; y as s ' ss h 4. I 1 e ai= y @ ii i i 4 alhl1i i I i,i3 a asEes y S£ 4 go a k, c / E g a.,--,—,... „:. — . ss a ££ g 'p 9 €_ I y1 . 'l , J: a' 5 ' _ s �g. ggz ! 94. s 3§ ItIlli! s 5 251s a g3sia; a f i ;31 !RI g£ a s% ® 1� s € 3 qs £ � � �NI ° i 11441'4111 it ill36glig +.3€Y- 5 55e a 9s €ass b s/= B 1 !!I! I £ any 3sa as ys £/- I<3�� y £aen5 q ."€"ag 9 eg3ssY Els1a i'f ggiduii€ si$tl ill $'s.l ". _aI s sa3 £y __ ) mr.3 3: a= $ m i_ R 4 igi 'Y tsi i , r�`°i` `1r, -ia��_ "mo17 w 4 • F Y b i i ( — .v,.._ 4 J"1 ti! : : d it 191$33£ thin 31$:i6 = I ._\ ii [ Y i' ! ,� 1\, � t / `-111@4 1 l� ' 3 / 963E. \ 1 I /' ' gii.i I I WI;A Id€g .,T—s .:.is i '11 1 ( 11 `[ E l` '7 gS iia , "� o Iia "�I it rLL gygy5 1 \ I N\ 1111 ��� 114ire" A"-1, eI— D �s -- — . _ ( N j(r� _ 1 ' III N 1 :. Tolunay-Wong Engineers,Inc. Tolunav-Wong 2455 W.Cardinal Drive,Suite A Beaumont,Texas 77705 n cr l nee�_s, Inc. Ph:(409)840-4214 Fax:(409)840-4259 REPORT OF IN-PLACE DENSITY CLIENT: Amoebia - Collins PAGE 1 OF 2 Attn: C. W. Collins 2869 Cleveland Road PROJECT NO.: 15.21.178 Wooster OH 44691 76672 REPORT NO.: DATE OF SERVICE: 11/05/2015 PROJECT: PO No. 2049-PATX AUTHORIZATION: Tim 615-788-9562 Tractor Supply 11/09/2015 REPORT DATE: Port Arthur, Texas SERVICES: To perform moisture and density tests at the project site according to the frequency and requirements set forth in the project documents. PROJECT DATA CONTRACTOR: Amoebia - Collins GAUGE. Humboldt DENSITY MOISTURE GAUGE SERIAL NO.: 4435 METHOD OF TEST: ASTM D6938-10 ASTM D6938-10 STANDARD COUNTS SPECIFICATION: 95% ± 3 MOISTURE-CURRENT: 468 PREVIOUS: 468 DENSITY-CURRENT: 2804 PREVIOUS: 2804 TEST MODE: Direct Transmission PROBE DEPTH: 6 MOISTURE/DENSITY RELATIONS OPTIMUM MAXIMUM REFERENCE M/D# TEST OF MATERIALS MOISTURE% DENSITY pcf REPORT 1. CLAY Fill Brown w/Tan Fat CLAY 26.2 93.3 74679 REPORT OF TESTS TEST FIELD OPTIMUM FIELD DENSITY MAXIMUM PROBE LIFT/ M/D MOISTURE MOISTURE (pcf) DENSITY DENSITY NO LOCATION DEPTH ELEV NO (%) (%) WET DRY (pcf) (%max) 1. Driveway Paving 6 Final 1 26.4 26.2 118.4 93.7 93.3 100.4 See Attached Drawing 2. Driveway Paving 6 Final 1 28.0 26.2 118.4 92.5 93.3 99.1 . See Attached Drawing 3. Driveway Paving 6 Final 1 24.9 26.2 116.9 93.6 93.3 100.3 See Attached Drawing 4. Driveway Paving 6 Final 1 25.4 26.2 112.0 89.3 93.3 95.7 See Attached Drawing Report of Tests continued on page 2 Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1007SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. Tolunay-Wong REPORT NO.:76672 Engineers,Inc. REPORT OF TESTS (continued) PAGE 2 OF 2 PROJECTNO.: 15.21.178 Amoebia - Collins DATE OF SERVICE: 11/05/2015 FIELD OPTIMUM FIELD DENSITY MAXIMUM TEST PROBE LIFT/ M/D MOISTURE MOISTURE (pcf) DENSITY DENSITY NO LOCATION DEPTH ELEV NO (%) (%) WET DRY (pcf) (%max) 5. Driveway Paving 6 Final 1 24.6 26.2 116.4 93.4 93.3 100.1 See Attached Drawing 6. Driveway Paving 6 Final 1 26.4 26.2 116.5 92.2 93.3 98.8 See Attached Drawing Test results on this report meet project specifications as noted above. ADDITIONAL COMMENTS: Technician: Greg Taylor, CMT Project Manager TOLUNAY-WONG ENGINEERS, INC. Report Distribution: (1)Amoebia-Collins (1)Alen Collins (1)C.W.Collin (1)Jarrod Finger VVV Greg Taylor CMT Project Manager Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1007SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. -Wong Tol Engineers,Inc.Join nay- ong 2455 W.Cardinal AU% Drive,Suite A Beaumont,Texas 77705 En �i neers/ Inc' Ph:(409)840-4214 Fax:(409)840-4259 REPORT OF IN-PLACE DENSITY CLIENT: Amoebia - Collins PAGE 1 OF 2 Attn: C. W. Collins 2869 Cleveland Road PROJECTNO.: 15.21.178 Wooster OH 44691 76672 REPORT NO.: DATE OF SERVICE: 11/05/2015 PROJECT: PO No. 2049-PATX AUTHORIZATION: Tim 615-788-9562 Tractor Supply 11/09/2015 REPORT DATE: Port Arthur, Texas SERVICES: To perform moisture and density tests at the project site according to the frequency and requirements set forth in the project documents. PROJECT DATA CONTRACTOR: Amoebia - Collins GAUGE: Humboldt DENSITY MOISTURE GAUGE SERIAL NO.: 4435 METHOD OF TEST: ASTM D6938-10 ASTM D6938-10 STANDARD COUNTS SPECIFICATION: 95% ± 3 MOISTURE-CURRENT: 468 PREVIOUS: 468 DENSITY-CURRENT: 2804 PREVIOUS: 2804 TEST MODE: Direct Transmission PROBE DEPTH: 6 MOISTURE/DENSITY RELATIONS OPTIMUM MAXIMUM REFERENCE M/D# TEST OF MATERIALS MOISTURE% DENSITY pcf REPORT 1. CLAY Fill Brown w/Tan Fat CLAY 26.2 93.3 74679 REPORT OF TESTS TEST FIELD OPTIMUM FIELD DENSITY MAXIMUM PROBE LIFT/ M/D MOISTURE MOISTURE (pcf) DENSITY DENSITY NO LOCATION DEPTH ELEV NO (%) (%) WET DRY (pcf) (%max) 1. Driveway Paving 6 Final 1 26.4 26.2 118.4 93.7 93.3 100.4 See Attached Drawing 2. Driveway Paving 6 Final 1 28.0 26.2 118.4 92.5 93.3 99.1 See Attached Drawing 3. Driveway Paving 6 Final 1 24.9 26.2 116.9 93.6 93.3 100.3 See Attached Drawing 4. Driveway Paving 6 Final 1 25.4 26.2 112.0 89.3 93.3 95.7 See Attached Drawing Report of Tests continued on page 2 Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1007SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. Tolunav-WongOp REPORT NO.:76672 Engineers,Inc. REPORT OF TESTS (continued) PAGE 2 OF 2 PROJECTNO.: 15.21.178 Amoebia - Collins DATE OF SERVICE: 11/05/2015 FIELD OPTIMUM FIELD DENSITY MAXIMUM TEST PROBE LIFT/ M/D MOISTURE MOISTURE (pcf) DENSITY DENSITY NO LOCATION DEPTH ELEV NO (%) (%) WET DRY (pcf) (%max) 5. Driveway Paving 6 Final 1 24.6 26.2 116.4 93.4 93.3 100.1 See Attached Drawing 6. Driveway Paving 6 Final 1 26.4 26.2 116.5 92.2 93.3 98.8 See Attached Drawing Test results on this report meet project specifications as noted above. ADDITIONAL COMMENTS: Technician: Greg Taylor, CMT Project Manager TOLUNAY-WONG ENGINEERS, INC. Report Distribution: (1)Amoebic-Collins (1)Allen Collins (1)C.W.Collins (1)Jarrod Finger ° � CCC��' Greg Taylor CMT Project Manager Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1007SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. �.1 Tolunay-Wong Engineers,Inc. T olli na v-' Tr o n 2455 W Cardinal Drive,Suite A Beaumont,Texas 77705 Engineers, the. Ph:(409)840-4214 Fax:(409)840-4259 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: Amoebia - Collins PAGE 1 OF 2 Attn: C. W. Collins 2869 Cleveland Road PROJECTNO.: 15.21.178 Wooster OH 44691 REPORT NO.: 76755 DATE OF SERVICE: 11/10/2015 PROJECT: PO No. 2049-PATX AUTHORIZATION: Tim 615-788-9562 Tractor Supply REPORT DATE: 12/08/2015 Port Arthur, Texas SERVICES: To sample concrete materials at the project site and test in accordance with the project documents and the appropriate ASTM test methods. PROJECT DATA CONTRACTOR: Amoebia - Collins CONCRETE SUPPLIER: Knife River DATE OF PLACEMENT: 11/10/2015 PLANT: Highland TIME SAMPLED: 10:03A BY: Jonathon Stevens CLASS OF CONCRETE: 402510LS BATCH TIME: 9:26A SPECIFICATION REQUIREMENTS TEMPERATURE(DegF)-AIR: 70 CONCRETE: 71 WEATHER: Clear STRENGTH: 4000 psi @ 28 days MEASUREDSLUMP(in.): 5.50 SLUMP: 3-5" AIR: 2-4% AIR CONTENT(%): 3.0 UNIT WT(pcf) N/A METHOD OF TEST TRUCK NO: 390065 TICKET NO: 359625 SAMPLING: ASTM C172 WATER ADDED @ SITE(gal) 0 MOLDING&CURING: ASTM C31 LOCATION OF PLACEMENT SLUMP: ASTM C143 Driveway Paving TEMPERATURE: ASTM C1064 See Attached Drawing AIR CONTENT: ASTM C231 UNIT WEIGHT: CAPPING/PADS ASTM C1231 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH-4"X 8"CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET MARK TESTED (days) (in.) (sq.in.) (lbs.force) (psi) FRACTURE TYPE REMARKS 1 A 11/17/2015 7 4.018 12.68 32970 2600 TYPE 3 1 B 12/08/2015 28 4.013 12.65 51200 4050 TYPE 3 1 C 12/08/2015 28 4.008 12.62 52510 4160 TYPE 1 1 D 12/08/2015 28 4.009 12.62 54530 4320 TYPE 1 1 E Discard Technician: Michael Relford„ CMT Field Technician Report Distribution: Report of Tests continued on page 2 (1)Amoebic-Collins (1)Allen Collins TYPE 1 TYPE 3 TYPE 5 0)C W.Collins (1)Jarrod Finger I I Cone Columnar Side Fracture Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1001 SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. �y Tolunay-Wong Engineers,Inc. Oloin nav—'\�ong 2455 W.Cardinal Drive,Suite A • Beaumont,Texas 77705 Ph:(409)840-4214 Fax:(409)840-4259 Engineers, Inc; REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: Amoebia - Collins PAGE 2 OF 2 Attn: C. W. Collins 2869 Cleveland Road PROJECTNO.: 15.21.178 Wooster OH 44691 REPORTNO.: 76755 DATE OF SERVICE: 11/10/2015 PROJECT: PO No. 2049-PATX AUTHORIZATION: Tim 615-788-9562 Tractor Supply REPORT DATE: 12/08/2015 Port Arthur, Texas SERVICES: To sample concrete materials at the project site and test in accordance with the project documents and the appropriate ASTM test methods. PROJECT DATA CONTRACTOR: Amoebia - Collins CONCRETE SUPPLIER: Knife River DATE OF PLACEMENT: 11/10/2015 PLANT: Highland TIME SAMPLED: 11:21A BY: Jonathon Stevens CLASS OF CONCRETE: 402510LS BATCH TIME: 11:02A TEMPERATURE(DegF)-AIR: 7 0 CONCRETE: 7 8 SPECIFICATION REQUIREMENTS WEATHER: Clear STRENGTH: 4000 psi @ 28 days MEASURED SLUMP(in.): 5.50 SLUMP: 3-5" AIR: 2-4% AIR CONTENT(%): 3.1 UNIT WT(pcf) N/A METHOD OF TEST TRUCK NO: 102 TICKET NO: 61910 SAMPLING: ASTM C172 WATER ADDED @ SITE(gal) 0 MOLDING&CURING: ASTM C31 LOCATION OF PLACEMENT SLUMP: ASTM C143 Driveway Paving TEMPERATURE: ASTM C1064 See Attached Drawing AIR CONTENT: ASTM C231 UNIT WEIGHT: CAPPING/PADS ASTM C1231 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH-4"X 8"CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET MARK TESTED (days) (in.) (sq.in.) (lbs.force) (psi) FRACTURE TYPE REMARKS 2 A 11/17/2015 7 4.008 12.62 34020 2700 TYPE 3 2 B 12/08/2015 28 4.014 12.65 60300 4770 TYPE 3 2 C 12/08/2015 28 4.015 12.66 56230 4440 TYPE 3 2 D 12/08/2015 28 4.026 12.73 59070 4640 TYPE 5 2 E Discard Technician: Michael Relford, CMT Field Technician TOLUNAY-WONG ENGINEERS, INC. Report Distribution: (1)Amoebia-Collins (1)Allen Collins TYPE 1 TYPE 3 TYPE 5 (1)C.W.Collins (a4lr, (1)Jarrod Finger I I 0 Cone Columnar Side Greg Taylor Fracture CMT Project Manager Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in full without the 1001 SP approval of the testing laboratory. The use of our name must receive our written approval. Our letters and reports apply only to the sample tested and/or inspected,and are not indicative of the quantities of apparently identical or similar products. EXHIBIT D City of Port Arthur, Texas Department of Public Works CERTIFICATE OF ACCEPTANCE FOR 31LF Wide, 475 LF Roadway to Serve Tractor Supply per Planset To: Amoebia - Collins This document is to certify that the City of Port Arthur, Texas accepts the completion of a new street named Collins Avenue of the above mentioned project on the basis of the City of Port Arthur, Texas, Public Works Department, the Engineer's Certificate of Completion as executed by Jeremy Mitchell, P.E. of Soutex Surveyors and Engineers the Contractor's Certificate and Release, and the Contractor's Certificate of Guarantee from Amoebia — Collins of Wooster, Ohio. Brian McDougal City Manager ATTEST: Sherri Bellard City Secretary