HomeMy WebLinkAboutPR 19295: (A) LANDMARK STRUCTURES I, TERMINAL ROAD ELEVATED WATER STORAGE TANK AND PUMP STATION (2) P. R. NO. 19295
02/19/2016 CEWJ/gt
PAGE 1
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE EXECUTION OF A CONTRACT
BETWEEN THE CITY OF PORT ARTHUR AND LANDMARK
STRUCTURES I, LP OF FORT WORTH, TEXAS, FOR THE
CONSTRUCTION OF THE TERMINAL ROAD ELEVATED WATER
STORAGE TANK AND PUMP STATION, IN THE AMOUNT OF
$7,564,000.00; ACCOUNT NO. 429-1258-532.59-00, PROJECT
NO. WSI011
WHEREAS, the City of Port Arthur needs the Elevated Water Storage Tank and
Pump Station; and,
WHEREAS, the City of Port Arthur and Arceneaux Wilson & Cole LLC solicited
bids for this project; and,
WHEREAS, the bids have been evaluated by Arceneaux Wilson & Cole LLC and
the Purchasing Division, a copy of the bid tabulation is attached as Exhibit "A"; and,
WHEREAS, Landmark Structures I, L.P. of Fort Worth, Texas, has submitted the
lowest and most responsive bid for this work.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR,
THAT, the City Manager of the City of Port Arthur is hereby authorized and
directed to execute, on behalf of the City of Port Arthur, a contract, in substantially the
same form as attached as Exhibit "B", between the City Of Port Arthur and Landmark
Structures I, L.P. of Fort Worth, Texas, for the construction of the Terminal Road
Elevated Storage Tank and Pump Station, in the amount of $7,564,000.00.
s.pr19295
P. R. NO. 19295
02/19/2016 CEWJ/gt
PAGE 2
THAT, this project will be funded by Account No. 429-1258-532.59-00 Project
No. WSI002.
THAT, Landmark Structures I, L.P., will not receive a Notice to Proceed for the
construction of the Terminal Road Elevated Storage Tank and Pump Station until funds
in the amount of $7,564,000.00 are submitted to the City.
THAT, a copy of the caption of this resolution be spread upon the minutes of the
City Council.
READ, ADOPTED, AND APPROVED, this day of February, 2016, AD, at a
Regular Meeting of the City Council of the City of Port Arthur, Texas by the following
Vote: AYES:
Mayor:
Councilmembers: ,
NOES: .
Mayor
ATTEST:
Sherri Bellard, City Secretary
s.pr19295
APPROVED AS TO FORM:
'
\((d- • --7-- -1"-- (72'
Valecia Tizeno, Ciy Attorney
APPROVED FOR ADMINISTRATION:
Brian McDougal, City Manager
Dr. Jimmie Johnson, PHD
Director of Utility Operations
APPROVED AS TO FUND AVAILABILITY:
,e_ giet4.(7-/„./4 g.„).„.o.„ e.o.cfnic affie--
Jerry Dale, CPA/GFOA pt 9`�q�1
Interim Director of Finance
9 II
I lit ) VALOL,
Clifto Williams, CPPB
Acting Purchasing Manager
s.pr19295
EXHIBIT "A"
s.pr19295
•
T4SWAI V " _
ARCENEAUX WILSON&COLE
engineering I surveying I Punning
BID TABULATION
For The
TERMINAL ROAD ELEVATED WATER STORAGE TANK & PUMP STATION
To Serve
The City of Port Arthur
Job No.: CPA-670
BID OPENED: January 27, 2016 at 3:15 P.M.
Landmark Structures I, L.P. CB&I Constructors, Inc.
Fort Worth, TX The Woodlands, TX
Base Bid Items QTY. Unit Price Amount Unit Price Amount
1 Mobilization,Bonding &Insurance Costs 1 $300,000.00 $300,000.00 $10,000.00 $10,000.00
2 Furnish and Install Terminal Road Elevated 1 $6,464,000.00 $6,464,000.00 $7,277,700.00 $7,277,700.00
Storage Tank&Pump Station
3 Design of Trench Safety Systems 1 $5,000.00 $5,000.00 $1,000.00 $1,000.00
4 Trench Safety Systems,All Depths 5000 $1.50 $7,500.00 $2.00 $10,000.00
5 Special Shoring,All Depths 2,500 S1.00 $2,500.00 $12.00 $30,000.00
6 Implementation, Execution, NOI/NOC for 1 $5,000.00 $5,000.00 $15,300.00 $15,300.00
SWPPP
7 Inspections for SWPPP 1 $5,000.00 $5,000.00 $3,000.00 $3,000.00
SUBTOTAL BASE BID$ $ 6,789,000.00 $ 7,347,000.00
Supplemental Items QTY.
8 Allowance for Painted Logos on One or 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00
Two Sides of Tank
9 Allowance for Plant Controls 1 $45,000.00 $45,000.00 $45,000.00 $45,000.00
10 Contingency Allowance to be Used for 1 $700,000 00 $700,000.00 $700,000.00 $700,000.00
Field changes
TOTAL SUPPLEMENTAL BID ITEMS $ 775,000.00 $ 775,000.00
TOTAL BID (BASE & SUPPLEMENTALS) $ 7,564,000.00 $ 8,'122,000.00
E aF re/41
ARCENEAUX WILSON & COLE LLC ®*• .*7
TEXAS REGISTERED ENGINEERING FIRM '*: w ;,k0
* 16194 * % CALVIN D. PROSEN f
� /� //�'� `d11A.P`:�R 70405 �..•
d.....-,L etot-i---- 01/27/2016 4ij®SS tST 'FiNG•I.d
Calvin D. Prosen, P.E. i�*``®�.�
ditilink
It
IF'WAIF
YNN ARCENEAUX WILSON &COLE
. :<;:n.3eriny tiuvey11-4;.Nnnirg
January 28, 2016
Dr. Jimmie Johnson
Utilities Director
City of Port Arthur
444 Forth Street
Port Arthur, Texas 77640
RE; RECOMMENDATION OF AWARD OF CONTRACT
Terminal Road Elevated Water Storage Tank & Pump Station
AWC Job No. CPA-670/671
Dear Dr. Johnson:
On January 27, 2016 the City of Port Arthur received two (2) sealed bids for Terminal
Road Elevated Water Storage Tank & Pump Station project in Port Arthur, Texas.
The bids were opened at 3:15 pm and the results read aloud in the public bid opening.
The bids were checked for errors and tabulated. All Bidders acknowledged receipt of
Addendum No.1 and 2. All Bidders also submitted proof of Bid Surety and Statements
of Bidders Qualifications with their bids as required. No substitutions were submitted. It
was found that Landmark Structures I, L.P. of Fort Worth, Texas submitted the lowest
responsive Total Amount Bid in the amount of $7,564,000.00. A copy of the certified
Bid Tabulation is enclosed for your information.
We have worked with Landmark Structures I, L.P. on projects in the past and have
been pleased with the quality of work performed by the contractor. Based on our past
working history with the contractor we recommend that the City of Port Arthur award the
contract for Terminal Road Elevated Water Storage Tank & Pump Station to
Landmark Structures I, L.P. on the basis the lowest responsive Total Amount Bid in
the amount of $7,564,000.00. Should you have any questions or require additional
information, please contact our office.
409.724.7888
290'Turtle Creek Cr,Su to 320
Port Arthur,TX 77642 Engineering Surveying
awceng.com P16194 10194049
MM.
4 flik
w Ilk it Iro
Very truly yours,
ARCENEAUX WILSON & COLE LLC
CONSULTING ENGINEERS, INC,
TEXAS REGISTERED ENGINEERING FIRM F-16194
e4f4'L p
Calvin D. Prosen, PE
Sr. Project Manager
Attached: Bid Tabulation
CC: Mr. Donnie Stanton - City of Port Arthur
Mr. Clifton Williams, CPPO
Landmark Structures I, L.P.
#a I i s.
4 a or
ARCENEAUX WILSON&COLE
BID TABULATION
For The
TERMINAL ROAD ELEVATED WATER STORAGE TANK & PUMP STATION
To Serve
The City of Port Arthur
Job No.: CPA-670
BID OPENED: January 27, 2016 at 3:15 P.M.
Landmark Structures I, L.P. CB&I Constructors, Inc.
Fort Worth, TX The Woodlands, TX
Base Bid Items QTY. Unit Price Amount Unit Price Amount
1 Mobilization,Bonding&Insurance Costs 1 $300,000.00 $300,000.00 $10,000.00 $10,000.00
Furnish and Install Terminal Road Elevated
2 1 $6,464,000.00 $6,464,000.00 $7,277,700.00 $7,277,700.00
Storage Tank&Pump Station
3 Design of Trench Safety Systems 1 $5,000.00 $5,000.00 $1,000.00 $1,000.00
4 Trench Safety Systems,All Depths 5000 $1.50 $7,500.00 $2.00 $10,000.00
5 Special Shoring,All Depths 2,500 $1.00 $2,500.00 $12.00 $30,000.00
6 Implementation, Execution, NOI/NOC for 1 $5,000.00 $5,000.00 $15,300.00 $15,300.00
SWPPP
7 Inspections for SWPPP 1 $5.000.00 $5,000.00 $3,000.00 $3,000.00
SUBTOTAL BASE BID$ $ 6,789,000.00 $ 7,347,000.00
Supplemental Items QTY.
8 Allowance for Painted Logos on One or 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00
Two Sides of Tank
9 Allowance for Plant Controls 1 $45,000.00 $45,000.00 $45,000.00 $45,000.00
10 Contingency Allowance to be Used for 1 $700,000.00 $700,000.00 $700,000.00 $700,000.00
Field changes
TOTAL SUPPLEMENTAL BID ITEMS $ 775,000.00 $ 775,000.00
TOTAL BID (BASE &SUPPLEMENTALS) $ 7,564,000.00 $ 8,122,000.00
����•� U ,
-.to,
ARCENEAUX WILSON & COLE LLC i*• )�' ".*f#
TEXAS REGISTERED ENGINEERING FIRM O*. •*/
* 16194 * d CALVIN D. PROSEN O
/gy� OTOR.
�pp� ,, co`�4�
V ,01 — 01/27/2016 ossG.
1ioN. `.,�
Calvin D. Prosen, P.E. ®® � ®
EXHIBIT "B"
s.pr19295