Loading...
HomeMy WebLinkAboutPR 11773: 441 AUSTIN AVENUECITY OF PORT ARTHUR LEGAL DEPARTMENT TO: Mayor, City Council, and City Manager FROM: Mark T. Sokolow, City Attorney ~.~ SUBJECT: P.R. #11773 DATE: May 7, 2002 Special Council Meeting Attached is P. R. No. 11773 as it pertains to Change Orders for the rehabilitation of the building located at 441 Austin Avenue. Option 3 in the amount of $ 52,528 is being recommended by the Director of Pubic Works and the City's Electrical Inspector for Change Order No. 4. Therefore, the Change Orders are as follows: Contract Price $ 590,000 Change Order No. 1 4,602 Change Order No. 2 9,240 Change Order No. 3 8,073 Change Order No. 4 $ 52,528 $664,443 Attachment: Correspondence from SeTEX Construction, Corp. P.R. No. 11773 xc: Director of Public Works Apdl 30, 2002 HUOTiON CoRp. Munlcip, Mr. Oreg Wall The LaBiche Architectural Group, Inc. 7999 Gladys, Suite 101 Beaumont, Texas 77706 Re: Port Arthur Health Clinic Port Arthur, Texas Subject: Dear Grog: "Revised Change Order Request- Electrical Upgrades" In a follow up to previous meetings, correspondence, and discussions regarding Electrical Service Upgrades for the above referenced project, we offer the following "Revised" four (4) options for your review and consideration: Option No. 1 - Revisions to Electrical Panels #1 and #2 per Lechtenberg Consultino~,s Mom,, Dated March 22. 2002: 1. Petrospect pricing per attached quote dated April 11, 2002 2. SeTEX OH and profit of five percent (5%) TOTAL ADD COST OPTION NO. 1 Add: S40,025.00 Add: S 2.001.00 ADD: S42,026.00 Option No. 2 - Upgrade Service From 1200 to 2400 Amp rmr "Square D" Recommendation: 1. Petrospect pricing per attached quote dated April 11, 2002 2. SeTEX OH and profit of five percent (5%) TOTAL ADD COST OPTION NO. 2 Add: S 95,172.00 Add: $ 4.759.00 ADD: $99,931.00 Option No. 3 - Up.~rade Servme to Outside Buildin~ on Alley Wall per Lechtenber~ Consultin.. Memo Dated April 8. 2002: 1. Petrospect pricing per attached quote dated April 11, 2002 2. Petrospect Credit from Re-Feeding Chiller units from Second Floor per proposal dated April 11, 2002 3. SeTEX OH and profit of five percent (5%) TOTAL ADD COST OPTION ,YO. 3 Add: 553,127.00 Deduct: (5 3,100.00) Add: S 2.501.00 ADD: S 52,528.00 April 30, 2002 Mr. Greg Wail The LaBiche Architectural Group, Inc. Page 2 Option No. 4 - Upgrade Service to Outside Building on Alley Wall per Lechtenberg Consultlno Meeting Dated April 24, 2002: 1. Petrospect pricing per attached quote d~ted April 11, 2002 2. Petrospect Credit from Re-Feeding Chiller units from Second Floor per proposal dated April I 1, 2002 3. SeTEX OH and profit of five percent (5%) TOTAL ADD COST OPTION NO. 4 * NOTE: Add: $ 38,811.00 Deduct: ($ 3,100.00) Add: $ 1,786.00 ADD: $37,497.00 For ail options listed, SeTEX has lost supervision time that will cause us to extend our cost for supervision on this project due to these electrical revisions and delays from March I9, 2002forward, which will have to be addressed as a cost delay beyond our control once final dates are established. Specifically excluded are all Entergy costs, if any. After your review, we will need to have a meeting promptly with all parties, including the owner, to fully address each option for consideration. Yours very truly, SeT. L:~ CONSTRUCTION CORP. James R. Shell President dlc CC: file/job Lan-y Marbry/SeTEX Jobsite WEjee Lechtenberg - Consulting Engineer F~ :~ ~ I~dustrl~lsp~ctlc~a PetroSpect PlO. :~x ! 090 · ~rL~L T,.~.c ' (409) ?~9.$~ 1. · r~ (.1~) 72~ I ~ Phone: (~'Of) ffV~,~-~f'/~:~/ Date: ~O:rgent __For Rudew ~-4~ea$¢ Ce,~ent Reply __Please Recycle ~' : ,{v{~Yl Indu$~l-lalsp~ction P~ NO. : 4~7;299518 P_ETR OSPECT SeT~x Conmmction P,O. Box 20678 Beaumont, Texa~ 77706 4-11-02 l~,e: Port Arthur Health Clinic 449 Austin Ave. Port Arthur, Texas Option 1 Upgrading Service and Relocating Disconnects for Chiller Unit~ · "-'l'J'~emolition of existing 800 amp panel ru"ounted on side of switch gear. 2) Demolition of existing 400 amp pauel 2. 3) Demolition of existing 2-225 amp disconnects servicing chiller 'mit. 4) Demolition of existing 1-200 amp disconnect on top of gutter above panel 2. 5) Installation ofnew gut~e,r or la~ge J-boxin place of panel 2 and r~feed f~:lers fi-om panel 1. 6) Adding n~v $00 romp fused disc, o~.ue~t for feed for new cNller ,mits on roo£ 7) Rerouting existing conduit and existing.wire :From new 800 amp disconnect to new 2-600 amp w/Z50 amp fuses for 2-chillers. 8) Upgrade existing se'rvSce entranc* buss ¢oaductors from existing 2 each 750 mom to 5 each 500 mcm and connect to new 800 m'up disconnect and rcfeed 1200 amp equipment ~a'itch. 9) Reroute blower motor controls from existing $00 amp panel to new panel 1. 10)Upgrade feeder wire From 400 amp to 600 amp for panel I. B~-~ bid of Option I ........... Material.-- .$14,685.00 F, quipment Remal- 2,000.00 Labor ": -- 19,699.00 10%. 3,638.00 Total -$40,025.00 The material delivery time is 16 days before work'can commence. Down time of power for work 4 days, 2-week days and 2-weekend day~. Total work time 10 days wilh overtime. This does not meet sll codes, of the Electrical Codes and NFPA If you have any queStlon plea.se contac~ Donatd Fabriguze at (409)729-5801 Thank you, Petrolipect Industrial Service~, Inc. Donald Fabriguze Superintendent PI~ NO. : 409~299518 PETR OSPECT SeT~x Construction 4-11-02 P.O. Box 206784-I 1-02 Beam'nont, Tex~ 77706 Re: Port Arthur Heakh Clinic 449 Austin Ave. Port Arthur, Texas ~Upgrading Sm-vice fi.om 1200 to 2400 amp emolition of'exi~ng $00 amp p~nel mouat~ on ~ide of ~vitch gear. 2) Demolitioo of exizting 400 amp panel 2. 3) Demolition of existing 2-225 ~mp.disco~me~ts ~rvlcing chiller unit. 4) Dernolkion of existing 1-200 amp disconn~'t on top of grater above panel 2. 5) Installation ofne'w gutter Or large J-bok in pl~,e of panel 2 and re-feed feeder~ from panel 1. 6) Adding new 800 amp breaker in ~;vitch gear for feed for new chiller units on roof. 7) Rerouting exl~tlng conduit and exi,tingwlre fi.om new 800 m'np breaker to n~w 2- 600 amp w/450 amp funs for 8) Upgrade existing ~rvic* ,ntrance bu~'~onductors from existing to 5 each 500 mcm. 9) Existing 1200 arnp equipment ~witch gear to 1:~ up-graded and reconstructed by Square D Feild Manufacture repre~mtitives, to 2400 amp with shunt trip protection and emergency Imtton located for fireman emergency access oumide. 10) Rcroute blower motor control~ from ~:isting 800 amp panel to new panel 1. 11)Upgrade fe*eder wire from 400 amp to 600 ~mp for panel 1. B~e bid of OFfiOn 2-- ~ Sq. D Kept. Equip $69.760.00 Material- -- 6~688.00 Equipment Rental- 750.00 Labor- ....... 9,3'2--:2.00 10~,4 8,652.00 Totml- -- $95,172.00 The material delivery time is I0 days before wo}k can commence. Down time of power for work 3 day% l-weekday and 2-weekend days. Total work time 8 days with overtime. This mee~, all of the Electrieal Codes, NFPA If you have any question plea,e contact Donald Fabriguze at (409)729-5501 Thank you, Donald Fabriguze f/' ~ Sup~fint,ndent PE- R OSP£CT SeTeX Construction P.O. Box 20675 B~umom, Texas 77706 4-11..02 Port Arthur Health Clin/c 449 Austin Ave. Port Arthur, Texas _~Opdon 3 Upgrading Service from 1200 to 2000 amp Relocating outside 1) Demolition of existing 800 amp panel motrrrted on ~ide of switch gem-. 2) Demolition of existing 400 amp panel 2_ 3) Demolition of~ 2-225 amp disc~rmects servicing chiller unit 4) Demolition of ex/sting 1-200 amp disconnect on top of gutter ~bove panel 2. 5) Ir~tallafion of new gutter or large .T-box in place of' panel 2 and re-feed feedem f~om ]~,net I. 6) Add new 20(X) amp CT can w/5-3" rldg~d condtfit ri~ers For service entry. 7) Adding ~ $00 ~mp discomaect breake~ switch for feed for new ~er u~,ts on roof. 8) Adding new 1200 amp discormect breaker s~tch for re-feeding existing ~,erTice equipment on second Hoer using ex,-ting service buss c~try. 9) New conduk and new wire from new 800 amp. brier to new 2-600 amp w/450 ,,rap fuses for 2-cl~Llers on root~sp. I0)ExJst[ng 1200 stop equipment switch gear on second floor to remain ~ is. 1)Reroute blower motor controls from ex~sdng gOO amp panel to new panet 1. 12) Upgrade feeder V~e fTom ~00 amp to 600 m:np for panel I. Ba~e bid of Option 3 Materimi--- 21,413.00 Equipment Rental- 2,000.00 L~or -- 24,884.00 10'/~ - --- 4,$30 O0 Total--- $ 53,127.00 The materi~-I delivery time is 12 day~ before work c-mu cotm.uence. Down time of power for work 8 hours, I-weekend day. Total work time $ day~ with overtime. This me~s all of the Elem'rk~.l Code~, NFPA If you have any que~don please contact Donald Fabriguze al: (409)729-5801 Thank you, Pet~,~ Industrial Service~, Inc. FROM : M&H Inciustrialsl=e=tion PHOME iq0. ': ~7~18 Apr., 3~ k:~ OG:3~rP/q P2 PETR OSP. ECT' 24~ SeTex Constm~ion 4-29-02 P.O. Box 20678 Page Beaumont, Tex~ 77706 Re: Port Arthur Health Clinic 449 Amstin Ave. Port Arthur, Texa~ Option 4 Upgrading Service fi'om 1200 to 2000 amp Relocating outside 1) Demolition of Lo~d side of existing 2-225 amp disconnects servicing chiller unlt. MaXerial--$ I0.00 Labor , 260.00 10% 37~00 Total------$ 297.00 2) Add new 2000 amp CT can w/5-3" rigid conduit risers for servie~ entry. Material .... $ 4,835.00 Labor-~ 2,976.00 EqttiFment-- 1,000.00 I0% $$I.00 Total------$ 9,69Z00 3) Adding new $00 amp di$cormect breaker switch for teed for new cb. flier ut~ on roof.. Material .... $ Labor -~ 1,536.00 10% 5?5,O0 Tot. al -2 6,325.00 4) Adding new 1200 amp discormect breaker workch for re-feeding existing equipment on second floor using existing service bu~'~ entry. M~t~ial $ 6,354.00 Labor .... 3,965.00 Equfpment--- 1,000.00 10% 1,132.00 Total- $12,451.00 5) New conduit and new wire from new $00 ~ml~ bre~..ker to new 2-600 amp w/450 amp ~se~ £or 2-cl'tillers on rooftop. Material .....$ ,1,253.00 Labor .... 4,7S0.00 Eqmpmcr~--- 1,000.00 10%- 1,003.00 Total--.~$11,036.00 6) Existing 1200 m'np equipment switch gear on $~c, ond floor to remain as is. (Cont.) ~ : M&M Inctu~*.pl&~¢¢tic~ P~ NO. : 4~9~29S518 App. 3~ ~ 0~:~4~ pJ (continued £~om paS¢ !) P~e 2 Base bid of Option 4 ........... ~ 19,666.00 Equipment Rental- 2.000.00 Labor~ 13,3 l?.00 10'~ Total $ 38,811.00 The material delivery ~ is 12 days bef~o work can commence. Down time of po,,~r ~r w~ark $ hour. 1-weekend day. Tolal work time $ days with This Does not meet all of the Electrical and N-FPA ¢o<1e$. The thinking of the Engineer and Architect of not reworlfing th~ ex/sting equipment in the equipment room, I Ya ongly suggest aga'trmt this option 4. I/'option 4 is a~roved a letter fi-om all partle~ inv,)Ired in this decision, must be given to PectroSpec~.Industrial Services, Inc. clearing PetroSpect of any and all code violations. If you have any question please contact Donald ~abrig~ze at (409)729-5801 Thank you, Superintendent PETR OSPECT SeTex Construction P.O. Box 20678 Beattmont, Texas 77'706 4-11-02 Re: Port Arthur Health C~r~c 449 .amain Ave. Port Arthur, Texas Cr~lit fi.om r~fe~ding chiller units from second floor if option 3 is approved. Cr~th Maerial 898.00 I.~bor ---1,9'20.00 1~4 282.00 Total $ 3;100.00 If you have any question pl¢~.~ contact Donald Fabfiguze at (409)729-5801 Ttmnk you, PetroSpect Industrial Services, Inc. ' ' Donald Fabriguzc Superintendent 0 oo<<o ~o > ~o o P.R. No. 11773 05/02/02-vkl RESOLUTION NO. A RESOLUT1~ON AUTHORIZING THE MAYOR AND CZTY MANAGER TO EXECUTE CHANGE ORDERS 1~ 2, 3, AND 4 TO THE CONTRACT DATED NOVEMBER 27, 2001 BETWEEN THE CITY OF PORT ARTHUR AND SETEX CONSTRUCTZON CORPORATLON OF BEAUMONT, TEXAS FOR THE REHABI~LITAT~ON OF THE CITY-OWNED BUI~LDING AT 441 AUSI'[N AVENUE FOR THE PROPOSED PORT ARTHUR HEALTH CLI~NIC FACILTTY. FUND~ZNG BElrNG AVAILABLE 1~N FY 2002 ACCOUNT NO. 301-1601-591.89-00, CI~P NO. 170 AND OTHER CITY ACCOUNTS. WHEREAS, the bid for the rehabilitation of 441 Austin Avenue for the proposed City of Port Arthur Health Clinic Facility was awarded to SeTEX Construction Corporation of Beaumont, Texas; and, WHEREAS, the original Contract amount was $590,000 (total bid); and, WHEREAS, the Project Engineer and the City Manager has recommended the approval of Change Orders 1, 2, 3 and 4, attached hereto as Exhibits "A", "B", "C'; and "D"; and, WHEREAS~ Change Order No. ,~ in the amount of $52,528 is herein deemed in the best interests of the citizens of the City; now therefore, BE TT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT Change Orders 1, 2, 3, and 4 are herein approved and the City Manager is authorized to execute the approved Change Orders; and, THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Coundl. READ, ADOPTED, AND APPROVED this day of P.R. No. 11773 Page #2 A.D., 2002, at a Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Coucilmembers ~ .; NOES: A'FI'EST: Mayor Acting City Secretary APPROVED AS TO FORM: City Attorney APPROVED FOR ADMINISTRAT[ON: Leslie E. McMahen, P.E. Director of Public Works Rebecca Underhill Finance Director file c:\res~setexhealflldeptco Steve Fitzg~ om City Manag~ Exhibit 'A* P.R. NO. 11773 CHANGEORDER PROJECT: CONTRACTOR: City of Port Arthur Health Clinic SeTEX CONSTRUCTION CORP. P. O. Box 20678 Beaumont, Texas 77720-0678 The Contract is changed as follows: 1. Finish Hardware Cylinder Change Out at ExiSting Doom 2. Remove and Cap Off Existing Gas Lines 3. Electrical Panel Relocation, Drywall Partitions, Painting 4. Correct the Existing Unlevel Concrete Floor CHANGEORDERNO: 1 DATE: 0~18~2 ARCHITECT'S PROJECT NO.: 00069 CONTRACT DATE: 11/29/01 CONTRACT FOR: Renovation ADD: ADD: ADD: ADD: TOTAL $517.00 990.00 1,720.00 1,375.00 $4,602.00 **See attached breakdown Not valid until signed by the Owner, Architect, and Contractor. The original Contract Sum was .............................................................................................................................. $590,000.00 Net change by previously authorized Change Orders ....................................................................................................... $ .00 The Contract Sum pdor to this Change Order was ................................................................................................ $590,000.00 The Contract sum will be increased by this Change Order in the amount of ............................................................ $4,602.00 The new Contract Sum including this Change Order will be .................................................................................. $594,602,00 The Contract Time will be increased by zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE: The summary does not reflect changes in the Contract Sum or Contract Time which have been authorized by Construction Change Diractive. ~ The LaBiche Architectural Group, Inc. SeTEX CONSTRUCTION CORP. City of Port Arthur 7999 Gladys A~enu~, ~u.~e/l~.~ J P.O. Box 2067~"~ P.O. Box 1089 Beaumont, T.ef~a's 77720-0678 Port Arthur, Tffxas 776~..1