Loading...
HomeMy WebLinkAboutE. WATER DEPT: FIRE HYDRANTS City of Port Arthur, Texas Mayor and City Council Communication DATE REFERENCE NUMBER 05-07-02 FH_CC02.DOC SUBJECT Award of Fire Hydrants for the Utility Operations Department, Water Distribution Division. PAGE 1 of 2 RECOMMENDATION We recommend the City Council award the purchase of Fire Hydrants to Golden Triangle Pipe, of Beaumont, Texas, for the unit price of $784 (3.5' bury depth) and $820 (4.5' bury depth) to be charged to the Water Distribution Division. BACKGROUND These fire hydrants will replace existing units that have been found to be inoperable and/or are beyond repair. Three bids were received on May 1,2002. Golden Triangle Pipe Beaumont, TX Unit Price 2001 Unit Price Manufacturer 3.5' Bury 4.5' Bury 3.5' Bury 4.5'Bury American $784. $820. $781.30 $817.84 Coburn's of Beaumont Beaumont, TX Kennedy $842. $882. Casco Industries, Inc. Pasadena, TX Mueller $978. $985. The bid from Golden Triangle Pipe meets specifications and is recommended for award. BUDGET/FISCAL EFFECT This material is maintained in inventory by the Utility Operations warehouse and is charged to the appropriate budget account as consumed. This bid reflects a 0.35% and 0.26% increase, respectively, over last year's prices. STAFFING/EMPLOYEE EFFECT No anticipated effect on staffing. PREPARED BY: DS:KE APPROVED BY: City Manager DISPOSITION BY COUNCIL: PROCESSED BY CITY SECRETARY BAPPROVE DOTHER(DESCRIBE) DATE City of Port Arthur, Texas Mayor and City Council Communication DATE 05-07-02 REFERENCE NUMBER FH_CC02.DOC SUBJECT Award of Fire Hydrants for the Utility Operations Department, Water Distribution Division. PAGE 2of2 SUMMARY The bid from Golden Triangle Pipe meets the requirements of the advertised specifications and is therefore recommended for award for the unit price of $784 (3.5' bury depth) and $820 (4.5' bury depth) to be charged to the Water Distribution Division. RECOMMENDED: gE~niel S. Shep"h"~d~~'~ Director of Utility Operations xc: Kelly EIdridge Rebecca Underhill Director of Finance XXX Water Utilities Bond Fund 1253 Water Distribution 85 Water System Maintenance CIPXXX Water System Capital Improvements PREPARED BY: DS:KE APPROVED BY City Manager DISPOSITION BY COUNCIL: UAPPROVE []OTHER (DESCRIBE) PROCESSED BY CtTY SECRETARY DATE